Nenašly se žádné produkty pro „“
Bitmain
Model: S23E Hyd 2U
865 TH/s SHA-256 hydro-cooled Bitcoin miner from Bitmain in 2U rack format. 8,650W at 10 J/TH efficiency, released April 2026. The mid-tier density variant of Bitmain's current generation S23 hydro lineup, sitting between the standalone S23 Hydro (580 TH at 9.5 J/TH) and the S23 Hyd 3U (1,160 TH at 9.5 J/TH). Slightly less efficient (10 J/TH vs 9.5 J/TH) than the standalone and 3U variants but optimized for maximum 2U rack density: up to 21 units per standard 42U rack delivers 18.2 PH/s per cabinet at approximately 182 kW. 49 percent more hashrate per chassis than the base S23 Hydro at 57 percent more power consumption. 380 to 415V three-phase AC input via industrial three-phase connector. Compact 600 x 483 x 86 mm in 2U rack format at 17 kg net weight. Hydro cooled with closed-loop water circulation at 50 dB whisper-quiet operation. Ethernet 10/100M connectivity. 5 to 45 degrees Celsius operating range with hydro inlet water temperature requirements. 5 to 95 percent humidity tolerance. Compatible with antifreeze, pure water, and deionized water coolant chemistry. 360-day Bitmain factory warranty. Built exclusively for professional data center deployment with hydro cooling infrastructure: closed-loop water cooling system, three-phase electrical service, and industrial CDU/dry cooler heat rejection required. Profitable across all realistic industrial deployment scenarios with break even at approximately $0.163 per kWh under current Bitcoin network conditions. Ships with PSU, power cables, quick start guide, and free DDP worldwide delivery from MillionMiner.
Vyberte dostupnost
Množství
$11,699.00
Buying 10 or more? Get custom bulk pricing
Opravdový
Otestovaný hardware
Celosvětově
Celosvětová doprava
Podpora
Odborníci na těžbu
Těžební výkon
865 TH/s
Výkon
8650 W
Účinnost
10.00 J/TH
Hluk
50 dB
Na základě aktuální ceny BTC a obtížnosti sítě. Pouze orientační.
| Období | Denně | Týdenní | Měsíční |
|---|---|---|---|
|
Příjmy
|
$32.41 | $226.87 | $972.30 |
|
Elektrická energie
|
-$16.61 | -$116.27 | -$498.30 |
|
Zisk
|
$15.80 | $110.60 | $474.00 |
Using 0.080 $/kWh · Network difficulty as of today. Estimates only.
Adjust rate in the bar aboveUpdated daily. Last refresh: May 08, 2026. Estimates at $0.08/kWh.
Obsah se může lišit podle šarže. Přesné položky jsou uvedeny v potvrzení objednávky.
Connect PSU to miner and plug into the outlet
Připojte ethernetový kabel k vašemu routeru nebo switchi
Najděte IP těžaře prostřednictvím administrace routeru nebo nástroje pro skenování IP
Otevřete webové rozhraní, zadejte URL bazénu a peněženku — začněte těžit
Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.
Naši baníčí specialisté vám mohou pomoci najít ideální těžař pro vaši sestavu a rozpočet.
21 units per standard 42U rack at 182 kW. Highest-density rack-mount Bitcoin mining hardware currently available. 50 percent more units per cabinet than 3U hardware.
49 percent more hashrate per chassis than the base S23 Hydro at 57 percent more power. Lower acquisition cost than the S23 Hyd 3U with similar density math.
Break even at approximately $0.163 per kWh. +$8,530 annual profit at $0.05 per kWh industrial rates. ROI 17-22 months at industrial electricity.
Tell us what you need and our team will send you a customized ASIC miner hosting quote
Tell us your miner model (or quantity), your target electricity rate, and we will send a hosting cost breakdown within 24 hours.
865 TH/s SHA-256 at 8,650W and 10 J/TH efficiency on Bitmain's April 2026 generation S23E Hyd 2U chassis (also marketed as Antminer S23E U2H). ±3 percent hashrate and ±5 percent power tolerance per Bitmain documentation. The mid-tier density variant of the S23 hydro family, delivering 49 percent more hashrate per chassis than the base S23 Hydro (580 TH) and 75 percent of the S23 Hyd 3U hashrate (1,160 TH) in a more compact 2U rack format.
49 percent more hashrate at 57 percent more power, with slightly less efficient per terahash economics. Standalone S23 Hydro at 580 TH and 5,510W (9.5 J/TH) versus S23E Hyd 2U at 865 TH and 8,650W (10 J/TH): the 2U variant delivers 49 percent more hashrate per chassis, but at 5 percent less per terahash efficiency. The 2U variant wins on rack density (21 units per 42U cabinet versus standalone hydro stacking constrained by chassis depth) and on per-chassis hashrate consolidation. The standalone wins on per terahash efficiency and on per-unit acquisition cost. For density-constrained deployments, the 2U variant captures better total economics.
Lower acquisition cost per chassis with marginally less efficient per terahash economics, but higher rack density per cabinet. S23E Hyd 2U at 865 TH and 8,650W (10 J/TH) versus S23 Hyd 3U at 1,160 TH and 11,020W (9.5 J/TH): the 3U variant delivers 34 percent more hashrate per chassis at 27 percent more power consumption with 5 percent better per terahash efficiency. The 2U variant wins on rack density (21 units per 42U cabinet versus 14 for 3U, a 50 percent density advantage) and on lower acquisition cost per unit. The 3U variant wins on per-chassis hashrate and on per terahash efficiency. For maximum cabinet hashrate at fixed rack space, the 2U variant captures more total hashrate per 42U cabinet (18.2 PH versus 16.24 PH for 3U).
The S23E Hyd 2U wins decisively on per terahash efficiency. MicroBT WhatsMiner M73S+ at 540 TH and 7,200W delivers 13.33 J/TH (33 percent less efficient per terahash). Bitdeer SealMiner A3 Pro Hydro at 660 TH and 8,250W delivers 12.5 J/TH (25 percent less efficient). The S23E Hyd 2U also wins on absolute hashrate per chassis at this tier. Among current generation hydro flagships across all manufacturers, the S23E Hyd 2U leads on per terahash efficiency at this hashrate level and on rack density per 2U slot. No competing 2U format hydro Bitcoin miner from other manufacturers matches the S23E Hyd 2U's combination of efficiency, density, and per-chassis hashrate as of April 2026.
Yes across all realistic industrial deployment scenarios. At $0.08 per kWh: +$17.14 daily profit, +$514 monthly, +$6,256 annually. At $0.05 per kWh industrial rate: approximately +$23.37 daily, +$8,530 annually. At $0.04 per kWh: approximately +$25.45 daily, +$9,289 annually. At $0.07 per kWh per Mining Now February 2026 data: +$18.95 daily, +$6,917 annually. At $0.10 per kWh higher commercial rate: approximately +$12.99 daily profit, +$4,742 annually. Break even electricity rate at current Bitcoin network conditions is approximately $0.163 per kWh. ROI windows approximately 17 to 22 months at industrial hosting electricity rates depending on BTC price trajectory.
380 to 415V three-phase AC input via industrial three-phase connector. Standard industrial three-phase service required for deployment. At 380V three-phase draws approximately 13.1 amps per phase; at 415V approximately 12.0 amps per phase. Compatible with European and Asian three-phase commercial service, US 480V three-phase service (with appropriate transformer to 415V), and industrial mining facility service. Single-phase deployment is not supported and not possible at this power consumption level. The electrical infrastructure requirement makes the S23E Hyd 2U exclusively suitable for data center, industrial mining facility, or large commercial deployment with three-phase electrical service.
Closed-loop hydro cooling with internal cold plates bonded directly to hash board chips. External CDU (Coolant Distribution Unit) circulating water, deionized water, or water-glycol antifreeze. External heat rejection via dry cooler or cooling tower sized at 8.5+ kW per unit thermal load (29,500 BTU per hour). Standard 19-inch rack mounting in 2U slots with quick-disconnect hose fittings for serviceability. Coolant chemistry monitoring quarterly. Compatible with existing Bitmain hydro infrastructure (S19 Pro+ Hyd, S21 Hydro, S23 Hydro deployments) using the same plumbing standards. MillionMiner Equipment category includes Lianli radiators and CDU systems compatible with S23E Hyd 2U deployment.
50 dB hydro-cooled operation, comparable to a quiet office or normal conversation level. Substantially quieter than air-cooled equivalents at 75 dB. Hydro cooling eliminates the high-RPM exhaust fans that produce most ASIC noise. The remaining 50 dB noise comes from coolant pumps and minimal internal airflow components. Suitable for shared data center spaces and indoor mining facilities without specialized acoustic isolation requirements. Multi-unit deployment in standard data center configurations does not produce additive noise beyond comfortable industrial workspace levels.
600 x 483 x 86 mm in standard 2U rack format at 17 kg net weight per MillionMiner specification (some distributors including Mining Now list 19.1 kg, possibly accounting for full coolant or different measurement methodology). The 600 mm depth fits within standard 600 mm rack depth. Standard 19-inch rack mounting compatible with existing data center rack infrastructure. Single-person installation possible with appropriate lifting technique. Lighter than the S23 Hyd 3U (21.5 kg) and slightly heavier than the standalone S23 Hydro (13.5 kg).
5 to 45 degrees Celsius operating range per MillionMiner specification. The hydro variants typically require 20°C minimum inlet water temperature to prevent thermal cycling damage to chip cold plates. For external dry cooler deployment with controlled outlet temperatures, the S23E Hyd 2U follows the same Bitmain hydro family operating envelope: maximum ambient temperature approximately 30°C with 35°C coolant outlet, 40°C ambient with 45°C coolant outlet, 45°C ambient with 50°C coolant outlet. Storage temperature -20 to +70°C. Humidity tolerance 5 to 95 percent. The hydro cooling system tolerates wider ambient temperature range than air-cooled equivalents because heat rejection is decoupled from intake air temperature.
Bitcoin (BTC) is the primary target on the SHA-256 algorithm. Also mineable: Bitcoin Cash (BCH), Bitcoin SV (BSV), Fractal Bitcoin (FB), eCash (XEC), DigiByte (DGB) on SHA-256d, and any other SHA-256 derivative chain. Cannot mine Litecoin (Scrypt), Kaspa (KHeavyHash), Ethereum Classic (EtcHash), Aleo (zkSNARK), Alephium (Blake3), or any algorithm outside SHA-256. Most operators mine BTC directly at major pools (Foundry, AntPool, F2Pool, ViaBTC, Luxor, Braiins Pool) for maximum revenue stability.
Yes. The S23E Hyd 2U ships with an integrated PSU sized for the 8,650W rated load, along with power cables and quick start guide. Box contents per MillionMiner: Antminer S23E Hyd 2U unit, PSU, power cables, and quick start guide. Contents may vary by batch with exact items in order confirmation. The included PSU eliminates external power brick sourcing decisions and connector compatibility concerns. The PSU uses industrial three-phase connector standard for Bitmain hydro hardware.
Industrial data center deployment with hydro cooling infrastructure. Step one: verify three-phase 380-415V electrical circuit availability with appropriate breaker capacity (13 amps per phase at 380V). Step two: install in standard 19-inch rack with appropriate 2U slot dimensions. Step three: connect hydro cooling supply and return hoses via quick-disconnect fittings to facility CDU manifold. Step four: connect three-phase power cable to industrial connector. Step five: connect Ethernet cable to data center network switch. Step six: find miner IP through Bitmain IP Reporter or DHCP table, open Antminer web interface, login with default root/root credentials (change immediately for security), configure BTC pool URL and BTC wallet address. Step seven: verify hashrate stabilizes at approximately 865 TH/s within 15 to 20 minutes of startup.
Yes. MillionMiner hosting accepts S23E Hyd 2U units at managed hydro-cooled industrial facilities. At $0.05 per kWh industrial hosting rates: approximately +$23.37 daily profit per unit, +$8,530 annually. At $0.04 per kWh: approximately +$25.45 daily profit per unit, +$9,289 annually. Hosting eliminates facility CapEx, three-phase electrical infrastructure investment, hydro cooling system construction, industrial CDU and dry cooler installation, day-to-day operational overhead, and specialized hydro mining facility expertise requirements. For institutional and industrial buyers without existing hydro mining facility infrastructure, hosting through MillionMiner is the practical path to deploying the S23E Hyd 2U at scale. Contact MillionMiner for current hosting rates and facility availability.
360-day Bitmain factory warranty per BT-Miners distributor documentation (some sources cite 365 days). Some distributors offer extended 2-year coverage. Covers manufacturing defects and hardware failures under normal operating conditions. Tampering with warranty seal, use of incompatible PSU, exceeding rated voltage input, improper coolant chemistry, deployment outside rated operating temperature range, or physical damage from shipping voids coverage. Warranty claims processed through MillionMiner support with direct Bitmain channel escalation as needed.
Industrial hydro miner maintenance protocols. Quarterly coolant chemistry inspection (pH, conductivity, biological growth markers). Semi-annual coolant replacement or filtration based on system size and chemistry stability. Annual hash board inspection for chip-level performance variance. Continuous hashrate monitoring through Antminer web interface or BraiinsOS+ dashboard with alerting on temperature, hashrate, and power deviations. Quarterly hose fitting inspection for leakage or wear. The S23E Hyd 2U platform has limited field reliability data as of April 2026 (less than 1 month in market) but inherits the mature Bitmain hydro hardware design lineage from the S19 Pro+ Hyd through S21 Hydro and S23 Hydro generations with no expected reliability issues.
BraiinsOS+ supports the Antminer S23 series for autotuning optimization and is expected to support the S23E Hyd 2U variant from launch. The firmware provides per-chip performance data, advanced pool management, and comprehensive monitoring beyond Bitmain's stock firmware. Operators using BraiinsOS+ on S23 hardware typically achieve 2 to 5 percent additional efficiency improvements over stock firmware, equivalent to approximately $130 to $325 annually per S23E Hyd 2U unit at $0.08 per kWh electricity. Vnish firmware is another third-party option. Note that installing third-party firmware may affect manufacturer warranty coverage.
Choose the S23E Hyd 2U when rack density is the binding constraint. The 2U format delivers maximum hashrate per rack unit (18.2 PH per 42U cabinet versus 9.7 PH for standalone Hydro deployment or 16.24 PH for 3U) at acquisition pricing between the standalone and 3U variants. Choose the standalone S23 Hydro for lowest per-unit acquisition cost or for deployment in mixed S19/S21 hydro fleet integration. Choose the S23 Hyd 3U for maximum hashrate per chassis (1.16 PH single management endpoint) or when 3U rack slots are abundant. The 2U variant captures the rack density sweet spot for typical urban data center deployments where floor area carries real cost.
Buy the S23E Hyd 2U if you operate or are constructing an industrial data center with three-phase electrical service and hydro cooling infrastructure where rack density is the binding constraint, you want maximum hashrate per 42U cabinet across the S23 family, you are positioned for long term Bitcoin price growth, you have access to industrial hosting electricity rates for maximum profitability, you are running existing Bitmain S19 Pro+ Hyd or S21 Hydro fleets where S23 integration provides natural refresh, or you want a balance between per-unit acquisition cost and per-chassis hashrate. Consider the standalone S23 Hydro at 580 TH if you want lowest per-unit acquisition cost. Consider the S23 Hyd 3U at 1.16 PH/s if you operate at maximum density scale. Avoid the S23E Hyd 2U if you do not have data center scale hydro infrastructure or three-phase electrical service.
Within the S23 hydro family: standalone S23 Hydro at 580 TH for lower-cost per-unit deployment, S23 Hyd 3U at 1,160 TH for maximum per-chassis hashrate, S23 Immersion at 442 TH for immersion deployment infrastructure, S23 air-cooled at 318 TH for non-hydro deployment. For lower acquisition cost: S21 XP+ Hyd at 500 TH ($9,500), S21 XP HYDRO at 473 TH ($6,899), S21e XP Hydro at 860 TH ($11,649). Competing manufacturer hydro: MicroBT WhatsMiner M73S+ at 540 TH for higher hashrate alternative, Bitdeer SealMiner A3 Pro Hydro at 660 TH for Bitdeer ecosystem alternative. For complete data center infrastructure: MillionMiner Equipment category includes Lianli hydro radiators and CDU systems, Mining Containers for portable industrial deployment, Racks & Cabinets for proper rack mounting. For algorithm diversification beyond Bitcoin: Bitmain Antminer KS7 for Kaspa, Bitmain Antminer L11 for Litecoin and Dogecoin, Bitmain Antminer E11 for Ethereum Classic. For operators wanting hosting rather than self deployment, MillionMiner ASIC hosting services accept S23E Hyd 2U units. (1,072 characters)