Nenašly se žádné produkty pro „“
MicroBT
Model: Whatsminer M73
470 TH/s hydro cooled SHA-256 Bitcoin miner at 7,200W and 15.32 J/TH efficiency, the base bin of MicroBT's M73 rack mount hydro tier in the M70 generation. Manufacturer headline spec runs 14.5 J/TH across the broader 470 to 500 TH/s binning range per Apexto and Zeus Mining. Lowest per unit acquisition cost in the M73 lineup. Positioned below the mid bin M73S (500 to 540 TH/s at 13.5 J/TH) and top bin M73S+ (540 to 600 TH/s at 12.5 J/TH) across an identical 4U rack mount chassis and water cooling architecture. 10 M73 units per 42U rack produce 4.7 PH/s at 72 kW. Same 483 x 663 x 86 mm chassis at 29.5 kg. 380 to 480V three phase industrial power. Ships with PSU, 360 day MicroBT warranty, and free DDP worldwide from MillionMiner.
Temporarily Unavailable
This product is temporarily unavailable.
Notify Me
Be the first to know when this miner becomes available.
We'll notify you when it's available!
Opravdový
Otestovaný hardware
Celosvětově
Celosvětová doprava
Podpora
Odborníci na těžbu
Těžební výkon
470 TH/s
Výkon
7200 W
Účinnost
15.32 J/TH
Hluk
75 dB
Na základě aktuální ceny BTC a obtížnosti sítě. Pouze orientační.
| Období | Denně | Týdenní | Měsíční |
|---|---|---|---|
|
Příjmy
|
$18.18 | $127.26 | $545.40 |
|
Elektrická energie
|
-$8.64 | -$60.48 | -$259.20 |
|
Zisk
|
$9.54 | $66.78 | $286.20 |
Using 0.050 $/kWh · Network difficulty as of today. Estimates only.
Adjust rate in the bar aboveUpdated daily. Last refresh: May 15, 2026. Estimates at $0.08/kWh.
Obsah se může lišit podle šarže. Přesné položky jsou uvedeny v potvrzení objednávky.
Connect PSU to miner and plug into the outlet
Připojte ethernetový kabel k vašemu routeru nebo switchi
Najděte IP těžaře prostřednictvím administrace routeru nebo nástroje pro skenování IP
Otevřete webové rozhraní, zadejte URL bazénu a peněženku — začněte těžit
Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.
Pricing, lead time, and hosting options. Personal advice from our sales team.
Pricing, lead time, and hosting options. Personal advice from our sales team.
Naši baníčí specialisté vám mohou pomoci najít ideální těžař pro vaši sestavu a rozpočet.
Base bin of the M73 rack mount hydro tier at lowest per unit acquisition cost. Maximum units per hardware budget.
Identical 4U chassis, water cooling, and production silicon as M73S and M73S+. Only testing grade differs. Mix bins freely within racks.
Base grade chips run at lower clock speeds, reducing per chip thermal stress. Defensible choice for multi year deployments prioritizing longevity.
The M73 produces 470 TH/s of SHA-256 hashrate at 7,200W and 15.32 J/TH efficiency in the MillionMiner rated specification. Manufacturer headline specs per Apexto, Zeus Mining, and X ON Mining document the broader binning range at 470 to 500 TH/s and 14.5 J/TH efficiency. MicroBT rates the unit at plus or minus 3 percent hashrate tolerance. Real world output depends on batch binning, coolant temperature, and operating conditions.
Same 7,200W rated power draw across all three variants. Same 4U chassis, water cooling architecture, and 380 to 480V three phase requirements. Hashrate and efficiency differences come from chip binning. M73 base (this product): 470 to 500 TH/s at 14.5 J/TH. M73S mid: 500 to 540 TH/s at 13.5 J/TH. M73S+ top: 540 to 600 TH/s at 12.5 J/TH. The M73 trades 13 percent hashrate versus the M73S+ for correspondingly lower acquisition cost. For operators whose binding constraint is hardware budget rather than operating efficiency, the M73 puts more units in the rack per dollar of capital spent.
Three scenarios favor the M73. First: hardware budget is the binding constraint rather than electricity cost, common in early stage facility buildouts. Second: deployment horizon is short enough (under 2 years) that acquisition cost savings outweigh lifetime efficiency penalty. Third: electricity rate is cheap enough (below $0.04 per kWh) that the daily efficiency gap between bins is small in absolute dollar terms. If none of these apply, higher bin options typically win on total lifetime fleet economics.
No. Base bin chips are not inferior manufacturing. They come from the same silicon wafers, same production line, and same chip design as top bin. Only tested performance grade differs during post fabrication quality sorting. Base bin chips may actually last longer than top bin under extended deployment because lower clock frequencies reduce thermal stress per chip. For multi year deployments where hardware longevity matters alongside acquisition cost, some fleet operators deliberately choose base bin silicon.
380 to 480V three phase commercial or industrial power. At 415V three phase: approximately 17 amps per phase at 7,200W continuous draw. At 480V three phase: approximately 15 amps per phase. Fits within standard 20 amp commercial breakers with headroom. Same three phase requirements as the entire M73 series.
Closed loop water circulation with off the shelf components. Required: circulation pumps sized for total fleet flow rate, standard plumbing fittings, water glycol coolant mixture, external heat rejection through dry coolers or water to water heat exchangers, and inline filtration. Coolant volume scales roughly 2 to 4 liters per unit plus system reservoir capacity. Each M73 adds approximately 24,570 BTU per hour of thermal load. Uses standard data center cooling equipment from any industrial supplier.
A standard 42U rack holds 10 M73 units producing 4.7 PH/s at 72 kW per rack. The M73S rack produces 5 PH/s at the same 72 kW. The M73S+ rack produces 5.4 PH/s. Mix bins within racks based on acquisition cost optimization. Compare against immersion alternatives or air cooled options before committing to facility architecture.
At MillionMiner's $0.08 per kWh onsite calculator: $15.32 daily revenue, $13.82 electricity, $1.50 net profit per day. Margins are tight at standard rates. At $0.07 per kWh industrial rates: approximately $12.10 daily electricity against similar revenue. At $0.04 per kWh negotiated industrial rates: $6.91 daily electricity, netting $8 to $9 daily profit per unit. A 10 unit M73 rack produces $80 to $90 daily net profit at $0.04 per kWh. Economic viability requires industrial electricity below $0.05 per kWh.
Jakákoli kryptoměna založená na SHA-256 proof of work. Bitcoin (BTC) je hlavním cílem. Další kompatibilní mince zahrnují Bitcoin Cash (BCH), Bitcoin SV (BSV), Fractal Bitcoin (FB) a DigiByte (DGB SHA-256 řetězec). Sloučené těžení BTC spolu s BCH a BSV prostřednictvím podporujících poolů, jako jsou ViaBTC a F2Pool, přidává marginální sekundární příjmy bez snížení příspěvku na hash rate Bitcoinu.
Run the acquisition cost versus daily electricity savings math with your specific supplier pricing. Model the per unit price gap between bins against daily efficiency savings at your electricity rate across your expected deployment horizon. If the per unit price gap between M73 and M73S+ is less than $600 at your supplier, upgrading to top bin typically wins at $0.06 per kWh industrial rates over 3 year deployments. At smaller price gaps, higher bins always win. At larger gaps, the M73 strengthens. Alternatively, mix bins within the same rack: majority M73 for capital efficiency, some M73S+ units where efficiency matters most.
Yes. All three M73 variants share identical 4U chassis, water cooling connector design, power requirements, and Whatsminer firmware. Mix bins freely within racks based on fleet deployment strategy. Common pattern: majority M73 units for capital efficiency with some higher bin units in specific slots. Fleet management handles mixed bin deployments transparently through unified Whatsminer firmware dashboards.
Industrial deployment with three phase power and water cooling infrastructure. Step one: install three phase 380 to 480V electrical service. Step two: install and commission water cooling loop including pumps, plumbing, and dry coolers. Step three: rack mount M73 units in standard 19 inch racks and connect water inlet/outlet fittings. Verify zero leaks before energizing. Step four: connect PSU power and Ethernet management. Step five: power on, allow coolant flow to stabilize, find each miner IP through DHCP, configure pool URL and Bitcoin wallet through the Whatsminer web interface, verify hashrate reaches 456+ TH/s within 15 to 20 minutes per unit.
Water cooling maintenance. Weekly visual inspection of fittings for leaks or corrosion. Monthly coolant quality testing. Every 12 to 24 months full coolant replacement. Quarterly pump and dry cooler inspection. Inline filter replacement when pressure differential exceeds specification. Hashboard failure rates on hydro units run lower than air cooled because chips operate at consistent temperatures. Water cooling maintenance is simpler than immersion fluid management because water glycol is cheaper and more widely available than dielectric fluid.
Any Stratum compatible Bitcoin pool. Foundry USA leads by network share. F2Pool has the longest operational track record and supports merged mining. AntPool remains popular across MicroBT fleets. ViaBTC offers accumulation mode payouts. For fleet deployments above 4.7 PH/s (equivalent to 10+ M73 units), direct negotiated agreements with major pools typically secure reduced fees below standard rates.
No. The M73 requires 380 to 480V three phase industrial power unavailable in residential settings, water cooling loop infrastructure, and professional installation for both electrical service and plumbing. Home mining hardware caps at around 3,500W per unit on standard 240V 20A circuits. For high hashrate home deployment, the Antminer S21 XP at 270 TH/s represents the realistic ceiling.
MicroBT's 360 day factory warranty on the complete machine covers manufacturing defects and hardware failures under normal operation within specified environmental ranges. Warranty exclusions include damage from coolant quality neglect, leaks caused by improper fitting installation, physical damage during cooling loop maintenance, power surge damage, and operation outside the 5 to 45 degree Celsius range. Warranty coverage is identical across all M73 bin variants.
Yes. MillionMiner operates managed hosting facilities with three phase industrial power and water cooling infrastructure capable of supporting M73 deployments. Hosted deployment eliminates facility infrastructure CapEx. Professional hosting at negotiated industrial rates often beats self hosting when full infrastructure costs are included. Contact MillionMiner sales through the Get a Quote button for hosting pricing, capacity availability, and deployment timelines.
Generally no, and potentially positively. Base bin chips run at lower clock frequencies than top bin silicon, which reduces per chip thermal stress over extended operational life. Some fleet operators deliberately choose base bin for multi year deployments where hardware longevity matters alongside peak efficiency. Counterargument: all M73 variants use identical silicon from the same production run, so base hardware durability differences are typically marginal in practice. Reliability differences between bins are small compared to differences between cooling approaches (hydro versus immersion versus air).
CapEx additions beyond miner acquisition: three phase electrical service installation ($5,000 to $20,000 per facility), water cooling loop and pumps ($5,000 to $20,000 per rack), racks and cabling ($1,500 to $4,000 per rack). Annual OpEx per unit at 7.2 kW: electricity at $5,045 at $0.08 per kWh, $2,522 at $0.04 per kWh industrial rates, water glycol coolant maintenance ($100 to $300 per unit annually), spare parts. Water cooling infrastructure CapEx runs meaningfully lower than immersion tank systems.
Within the M73 rack mount hydro tier: the Whatsminer M73S at 500 to 540 TH/s is the mid bin upgrade path, and M73S+ at 540 to 600 TH/s is the top bin option for operators prioritizing efficiency. Cross cooling at MicroBT: immersion variants M76 and M78 series cover alternative liquid cooling for facilities with tank infrastructure, M79 and M79S cover high power hydro tier. Cross brand hydro: the Bitmain Antminer S23 Hyd 3U at 1.16 PH/s provides vendor diversification at higher power tier. For algorithm diversification, the Antminer KS7 at 45 TH/s covers Kaspa mining. MillionMiner's ASIC hosting service accepts M73 units at negotiated industrial electricity rates.