कोई उत्पाद नहीं मिला के लिए
MillionMiner
मॉडल: Hydro Cabinet 6
Hydro cooling cabinet that runs six Antminer Hydro miners on one coolant loop: S19 XP+, S21 XP, S21+, S21e or S23 Hydro, up to 35 kW of heat. A separate 50 kW dry cooler stands outside and carries the heat away, so fan… noise stays out of the room.
It runs on 380 to 415 V three-phase, the same supply your hydro miners need. The 0.55 kW pump moves 2 cubic meters of coolant an hour. The cabinet measures 800 x 800 x 1,450 mm at 149 kg, the dry cooler 1,100 x 1,100 x 1,400 mm at 170 kg. We ship DDP with duties paid, with 12 months manufacturer warranty and setup help until your miners hash. Prefer hosting? Try our data centers free for 24 hours.
उपलब्धता चुनें
$2,800.00
कुल कीमतRequest Your Tailored Hydro Rack Quote
Tell us your application and where you need delivery. Our customer service is available 24 hours a day by email, WhatsApp or phone.
Why we prepare a tailored quote
We put your hydro rack together for your application and ship it as freight. The price depends on configuration, quantity, delivery destination and your site. Send us the form, and our expert team prepares a tailored quote, delivered duties paid (DDP) to your site.
धन्यवाद! हमारे विशेषज्ञ आपकी कस्टम कोटेशन के साथ 24 घंटे के भीतर उत्तर देंगे।
How we put your hydro rack together
Send the form
Tell us your application, delivery country and site
Tailored quote
Our expert team puts your solution together
Review with a specialist
Discuss configuration and setup
Delivery via DDP
Duties paid to your site
Hydro cooling cabinet that runs six Antminer Hydro miners on one coolant loop: S19 XP+, S21 XP, S21+, S21e or S23 Hydro, up to 35 kW of heat. A separate 50 kW dry cooler stands outside and carries the heat away, so fan… noise stays out of the room.
It runs on 380 to 415 V three-phase, the same supply your hydro miners need. The 0.55 kW pump moves 2 cubic meters of coolant an hour. The cabinet measures 800 x 800 x 1,450 mm at 149 kg, the dry cooler 1,100 x 1,100 x 1,400 mm at 170 kg. We ship DDP with duties paid, with 12 months manufacturer warranty and setup help until your miners hash. Prefer hosting? Try our data centers free for 24 hours.
कोटेशन प्राप्त करें: Hydro Cooling Cabinet for 6 Antminer Hydro Miners with Dry Cooler
मूल्य निर्धारण, अग्रिम समय, और होस्टिंग विकल्प। हमारी बिक्री टीम से व्यक्तिगत सलाह।
कोटेशन प्राप्त करें: Hydro Cooling Cabinet for 6 Antminer Hydro Miners with Dry Cooler
मूल्य निर्धारण, अग्रिम समय, और होस्टिंग विकल्प। हमारी बिक्री टीम से व्यक्तिगत सलाह।
Power:
The cabinet, its pump and the miners all run on 380 to 415 V three-phase at 50 or 60 hertz. Six S23 Hydro plus the 0.55 kW pump draw about 33.6 kW, roughly 49 A per phase at 400 V. Your electrician sizes the breaker and cable to that load. Sites in North America with 208 or 480 V need a transformer to step to 400 V.
Over a month, six S23 Hydro use about 24,100 kilowatt hours and the pump adds about 400. What that costs depends on your own rate per kilowatt hour.
Installation in six steps:
• Place the cabinet: indoors on a level floor. It weighs 149 kg and measures 800 x 800 x 1,450 mm, so plan a pallet jack and a door at least 85 cm wide.
• Place the dry cooler: outdoors or in a… well-ventilated hall, with free airflow on all sides. It weighs 170 kg and needs a 1,100 x 1,100 mm footprint.
• Connect the loop: run the supply and return pipes between the cabinet and the dry cooler, and choose single or dual loop mode.
• Fill the coolant: pure or softened water. Where temperatures drop below 0 °C, add antifreeze and a corrosion inhibitor.
• Mount the miners: slide the six Antminer Hydro units into the cabinet and connect their water inlets, outlets and power.
• Start in order: run the pump first, check pressure against the 0.3 MPa design limit and look for leaks, then power on the miners. Coolant should enter the miners at no more than 40 °C and leave at no more than 50 °C.
The main advantages:
• Capacity: 6 Antminer Hydro miners, 35 kW heat load in the cabinet.
• Cooling: separate 50 kW dry cooler, 15 kW above the cabinet limit, so coolant stays stable on hot days.
• Quiet room: the dry cooler fans stand outside, only the cabinet goes inside.
• Climate range: works in minus 25 to 45 °C outside air.
• Delivery: DDP with duties paid, 12 months manufacturer warranty, setup help until the miners hash.
Maintenance:
• Keep the dry cooler fins free of dust and leaves, check coolant level and pressure once a month, and change the coolant on your antifreeze maker's schedule.
Rather skip the installation?
We can run your hydro miners in our data centers on industrial power, monitored around the clock, at a fraction of your own power cost. The first 24 hours of hosting are free and without obligation.
The cabinet holds six shelf-type Antminer Hydro miners and removes up to 35 kW of heat. Five models fit:
• S23 Hydro: six units at 5,510 W draw about 33.1 kW, inside the 35 kW limit.
• S21 XP Hydro: six units at 5,676 W draw about 34.1 kW, inside the limit with 0.9 kW to spare.
• S21+ Hydro, S21e Hydro and S19 XP+ Hydro: listed as compatible by the manufacturer.
• Not compatible: 3U rack versions such as the S21e XP Hyd 3U, and Whatsminer hydro units. They need a rack cabinet.
Mixing models works the same way: add up the power of all six… miners and keep the total under 35 kW. The miners and the cabinet both run on 380 to 415 V three-phase, so one supply feeds the whole setup.
हमारे माइनिंग विशेषज्ञ आपकी सेटअप और बजट के लिए बेहतरीन miner खोजने में मदद कर सकते हैं।
Your order ships as two parts: the cabinet that holds the miners and the dry cooler that carries their heat outside. Together they cool six Antminer Hydro miners at up to 35 kW, ready to connect to a 380 to 415 V three-phase line.
• Cabinet: hydro cooling cabinet with built-in circulation pump, 0.55 kW, 2 cubic meters of coolant per hour.
• Dry cooler: 50 kW separate outdoor unit, rated for minus 25 to 45 degrees Celsius.
• Capacity: 6 Antminer S19 XP+, S21 XP, S21+, S21e or S23 Hydro, 35 kW heat load.
• Power: 380 to 415 V three-phase at… 50 or 60 hertz.
• Build: cabinet 800 x 800 x 1,450 millimeters at 149 kilograms, dry cooler 1,100 x 1,100 x 1,400 millimeters at 170 kilograms.
• Condition: new, in original packaging, with an invoice carrying our company details.
• Delivery: DDP with duties paid, 12 months manufacturer warranty, setup help until the miners hash.
Run six Antminer S21 or S23 Hydro from one 35 kW cabinet, with one 0.55 kW pump, one three-phase feed and one outdoor dry cooler.
We stay with you until all six miners hash: power planning, coolant fill and first start. Call +1 754 212 3521 or write to us anytime.
The dry cooler works from minus 25 to 45 °C outside air and holds 15 kW in reserve over six S23 Hydro. Antifreeze in the loop protects it below 0 °C.
There are no reviews for this product yet.
Be the first one to review it.
Did you purchase this product?
Write a review about this miner and help other buyers decide.
Yes. We ship DDP with duties paid, so the price in the buy box is the final landed price for the cabinet and the 50 kW dry cooler.
Yes. A 50 kW dry cooler ships as a separate outdoor unit, 1,100 x 1,100 x 1,400 mm and 170 kg, 15 kW above the cabinet's 35 kW limit.
Yes, as long as the six miners stay under 35 kW in total. Three S23 Hydro at 5,510 W and three S21 XP Hydro at 5,676 W come to about 33.6 kW.
35 kW in the cabinet and 50 kW at the dry cooler. Six S23 Hydro make about 33.1 kW of heat, six S21 XP Hydro about 34.1 kW.
No. It needs 380 to 415 V three-phase at 50 or 60 hertz, the same supply as the hydro miners. In North America, a transformer steps 208 or 480 V to 400 V.
Yes. It is rated for minus 25 to 45 °C outside air. Below 0 °C, mix antifreeze and a corrosion inhibitor into the coolant.
0.55 kW for the circulation pump, about 400 kilowatt hours a month in continuous operation. The 2,900 r/min pump moves 2 cubic meters of coolant per hour.
0.64 square meters for the 800 x 800 mm cabinet indoors, plus 1.21 square meters for the dry cooler outside. Plan a door at least 85 cm wide for the 149 kg cabinet.
12 months manufacturer warranty. In a warranty case, we handle the process with the manufacturer for you.
No customs and no extra costs. We ship DDP with duties paid, the delivery window of each batch stands in the buy box, and you get a tracking number for your hydro miner setup.