Bitmain
Model: Antminer L9
Bitmain's air cooled Scrypt ASIC miner for Litecoin (LTC), Dogecoin (DOGE), and Bellscoin (BELLS) merged mining. 17 GH/s Scrypt at 3,570W and 0.21 J/MH efficiency. The successor to the L7 (9.5 GH/s) and direct predecessor to the L11 family. BM1485 chip architecture with 288 chips across four hash boards (72 chips per board). Lower binned 16 GH/s variant at 3,360W also in distribution. 220 to 277V single phase input. 400 x 195 x 290 mm chassis. 75 dB from four high speed cooling fans. Merged mining delivers LTC, DOGE, and BELLS simultaneously from 17 GH/s, typically 20 to 40 percent higher combined revenue than solo LTC. Ships with PSU, Antwire C20-P13 connector cable, 6 month Bitmain warranty, and free DDP worldwide from MillionMiner.
Select Availability
Quantity
$3,990.00
Buying 10 or more? Get custom bulk pricing
Genuine
Tested hardware
Worldwide
Global shipping
Support
Mining experts
Hashrate
17 GH/s
Power
3570 W
Efficiency
210.00 J/GH
Noise
75 dB
Based on current BTC price & network difficulty. Indicative only.
| Period | Daily | Weekly | Monthly |
|---|---|---|---|
|
Income
|
$9.70 | $67.90 | $291.00 |
|
Electricity
|
-$6.85 | -$47.95 | -$205.50 |
|
Profit
|
$2.85 | $19.95 | $85.50 |
Using 0.080 $/kWh · Network difficulty as of today. Estimates only.
Adjust rate in the bar aboveUpdated daily. Last refresh: May 08, 2026. Estimates at $0.08/kWh.
Contents may vary by batch. Exact items listed in order confirmation.
Connect PSU to miner and plug into the outlet
Connect ethernet cable to your router or switch
Find miner IP via router admin or IP scanner tool
Open web interface, enter pool URL and wallet — start mining
Our mining specialists can help you find the perfect miner for your setup and budget.
Successor to the L7. 79 percent more hashrate at 42 percent better efficiency per gigahash. BM1485 architecture with 288 chips across four hash boards.
LTC, DOGE, BELLS, Junkcoin, Luckycoin, and Pepecoin simultaneously from 17 GH/s. Combined revenue typically 20 to 40 percent above solo LTC.
Same Antminer management interface as S21, S23, L11, and KS7. Ships with PSU, Antwire cable, 6 month Bitmain warranty, and free DDP worldwide.
Tell us what you need and our team will send you a customized ASIC miner hosting quote
Tell us your miner model (or quantity), your target electricity rate, and we will send a hosting cost breakdown within 24 hours.
17 GH/s Scrypt at 3,570W continuous and 0.21 J/MH efficiency. Bitmain's ±5 percent tolerance produces real world output between 16.15 and 17.85 GH/s depending on ambient temperature, power quality, and firmware version. A lower binned variant at 16 GH/s and 3,360W also ships through some channels using the same hardware with standard grade silicon.
3,570W continuous at 0.21 J/MH (210 J/GH). ±5 percent power tolerance produces real world draw between 3,392 and 3,749W. Approximately 42 percent better efficiency per gigahash than the L7 predecessor at 360 J/GH.
All Scrypt algorithm cryptocurrencies through merged mining. Primary coins: Litecoin (LTC), Dogecoin (DOGE), Bellscoin (BELLS). Additional coins: Junkcoin (JKC), Luckycoin (LKY), Pepecoin (PEP), Dingocoin (DINGO), Shibacoin (SHIC), CraftCoin (CRC), and DigiByte (DGB) through compatible pools. Combined merged mining revenue typically runs 20 to 40 percent above solo LTC at the same hashrate.
L7 at 9.5 GH/s, approximately 3,425W, and 0.36 J/MH (360 J/GH). L9 at 17 GH/s, 3,570W, and 0.21 J/MH. The L9 delivers approximately 79 percent more hashrate at essentially flat power draw and approximately 42 percent better efficiency per gigahash. For L7 operators at current difficulty, upgrading to the L9 typically pays back acquisition cost through power savings and hashrate gain within 6 to 14 months depending on electricity costs and Scrypt market prices.
SEALMINER DL1 Air at 25 GH/s, 3,725W, and 149 J/GH delivers 47 percent more hashrate and approximately 29 percent better efficiency per gigahash than the L9. The L9 delivers Bitmain's mature firmware ecosystem, broader operator familiarity, and deeper installed base for support and resale. For operators committed to Bitmain's ecosystem, the L9 remains a default choice at its tier. For operators willing to deploy second source hardware with meaningfully better efficiency, the DL1 Air offers a clear per unit advantage.
220 to 277V single phase AC input with approximately 16.2 amps at 220V continuous. Standard commercial 220 to 240V service required, or 220V outlets like those used for electric dryers and EV chargers. Cannot practically run at 110V residential since 3,570W at 120V would require approximately 30 amps. MM's page references a 100 to 240V universal range which may reflect PSU input tolerance; verify 220V+ facility power for full performance.
75 dB industrial noise from four high speed fans. Comparable to a vacuum cleaner or busy restaurant. Disruptive through walls. Requires sound isolated deployment: dedicated mining room, garage with sound isolation, basement, outbuilding, warehouse, or professional hosting facility. Not suitable for residential rooms, shared offices, or any space where humans spend extended time without hearing protection.
Major Scrypt merged mining pools accept L9 hashrate including F2Pool, Poolin, ViaBTC, Prohashing, and Litecoinpool. Prohashing and ViaBTC offer broader merge coin support including Bellscoin. Pool fees typically 0.5 to 2 percent of revenue. Configure once with LTC, DOGE, and BELLS wallet addresses and the pool distributes rewards across all supported chains automatically.
Depends on electricity cost and coin prices. At industrial electricity rates ($0.04 to $0.07 per kWh), the L9 typically remains economically viable for 2 to 3 years after deployment even with steady difficulty growth, extending with LTC/DOGE price appreciation. At residential rates ($0.10+ per kWh), the L9 may reach break even faster depending on exact conditions. L11 family deployment would displace L9 economics over the 18 to 36 month horizon as more efficient hardware reaches market saturation. Model conservatively assuming 20 to 30 percent annual network difficulty growth.
PSU included in the box with the miner. Ships with Antwire C20-P13 connector cable for PSU to miner interconnect. Some batches require a locally sourced C19 power cord rated for at least 16 amps depending on region. Verify cable requirements with MillionMiner at time of order for deployment planning.
L9 at 17 GH/s, 3,570W, 0.21 J/MH. L11 base at 20 GH/s, 3,680W, 0.184 J/MH. L11 Pro at 21 GH/s, 3,612W, 0.172 J/MH. The L11 family delivers 18 to 24 percent more hashrate at 12 to 18 percent better efficiency per megahash than the L9. Same BM1485 chip family but improved binning and revision. L9 operators upgrading to L11 typically pay back through power savings and hashrate gain within 12 to 24 months at standard electricity rates.
400 x 195 x 290 mm chassis per Antminer Distribution, CryptoMinerBros, and most distributor documentation. Weight approximately 16 kg per Mining Now. MillionMiner's page lists different dimensions (195 x 290 x 379 mm) and weight (13.5 kg) which may reflect shipping packaging or a different chassis revision. Verify physical dimensions with MillionMiner for rack planning.
Depends on voltage, noise, and thermal capacity. Voltage: requires 220 to 277V practical deployment, not standard 110V residential. Homes with 220V appliance outlets (dryers, EV chargers) can deploy with appropriate circuits. Noise: 75 dB exceeds comfortable household levels and requires dedicated mining space (garage, outbuilding, insulated basement). Thermal: 3,570W requires ventilation or HVAC. For quiet home Scrypt mining, Fluminer L3 at 9.5 GH/s and 45 dB or Fluminer L1 Pro at 6 GH/s and 45 dB are appropriate options.
Four high speed air cooling fans with front intake and rear exhaust. No external water loops or immersion. Facility requirements: ventilation for approximately 12,180 BTU per hour heat output, adequate intake and exhaust air, ambient temperature within specified range. For multi unit deployment, HVAC capacity must match aggregate thermal output across the fleet.
MM specifies 5 to 45 degrees Celsius at 5 to 95 percent humidity. Alternative distributor documentation varies from 0 to 40 degrees Celsius (OneMiners) to 0 to 75 degrees Celsius (CryptoMinerBros) representing different interpretations of optimal versus maximum survivable conditions. For hot climate deployment (UAE, Texas summer, Arizona), facility cooling must hold intake air below 40 degrees Celsius under peak load for stable hashrate.
Four step setup. Verify 220 to 277V single phase circuit capable of 3,570W continuous (20 amp 220V minimum). Connect PSU to miner using Antwire C20-P13 cable. Connect PSU to wall outlet using locally sourced C19 power cord rated for 16+ amps. Connect Ethernet. Find miner IP, open Bitmain web interface, configure Scrypt merged mining pool URL and LTC/DOGE/BELLS wallet addresses, change default credentials. Verify hashrate reaches 16+ GH/s within 10 minutes.
Limited third party firmware support for Scrypt ASICs compared to the SHA-256 ecosystem. Most L9 operators run stock Bitmain firmware. Some BraiinsOS style tuning projects have targeted L9 specifically, delivering modest efficiency and hashrate improvements over stock firmware at the cost of warranty voiding. Operators prioritizing firmware stability and warranty coverage should run stock Bitmain firmware.
Igen. A MillionMiner hosting szolgáltatásai L9 egységeket fogadnak a felügyelt létesítményekben, 220 és 277V-os egyfázisú infrastruktúrával. A hosting gazdaságossága általában ipari áramszinteken működik. Kapcsolatba léphet a MillionMiner-rel a hosting díjszintek és a felügyelt létesítményhálózat elérhetősége érdekében.
Mixed assessment depending on budget and operator profile. Pro factors: lower acquisition cost than L11 family, mature Bitmain firmware ecosystem with extensive operator experience, merged mining revenue across LTC/DOGE/BELLS, established resale and support market. Con factors: L11 family delivers 12 to 18 percent better efficiency per megahash at higher hashrate per unit, Bitdeer SEALMINER DL1 Air delivers 29 percent better efficiency than the L9 at higher per unit hashrate. For operators with short to medium deployment horizons (1 to 2 years) or capital constrained fleet expansion, the L9 remains economical. For operators building new multi year fleets, upgrading to L11 family or Bitdeer DL1 Air typically delivers better per capital economics.
For upgrade paths within Bitmain's Scrypt family: L11 base (20 GH/s), L11 Pro (21 GH/s), L11 HU6 (33 GH/s integrated hydro), L11 Hyd 2U (35 GH/s) for rack mount hydro. For algorithm diversification: Antminer S21 XP (270 TH/s), S23 (318 TH/s), or S23E Hyd 2U (865 TH/s) cover SHA-256 Bitcoin. Antminer KS7 (45 TH/s) covers Kaspa KHeavyHash. For quiet Scrypt on separate infrastructure: Fluminer L3 (9.5 GH/s, 45 dB) or Fluminer L1 Pro (6 GH/s, 45 dB) deliver Scrypt hashrate without industrial noise. Bitdeer SEALMINER DL1 Air (25 GH/s) provides vendor diversification with 29 percent better efficiency per gigahash. MillionMiner's ASIC hosting service covers turnkey L9 deployment at industrial electricity rates without facility CapEx.