In Stock

Bitmain

Bitmain Antminer S21 XP+ Hydro (395TH)

Model: Antminer S21+ Hydro

New

Top bin of Bitmain's Antminer S21+ Hydro family at 395 TH/s SHA-256 hashrate, 5,925W power draw, and 15 J/TH efficiency. Also sold as S21+ Hydro 395TH across distributor channels (MillionMiner's XP+ designation reflects the top bin positioning versus the 358 TH/s standard bin). 100 to 240V universal single phase voltage compatibility, a meaningful deployment advantage over the newer S23 Hydro series which requires 380V+ three phase industrial power. OD10 closed loop hydro cooling technology with 50 dB operating noise, sustained hashrate stability without thermal throttling, and longer component life than air cooled equivalents through consistent chip temperatures. Released November 2024. 13.8 kg at 410 x 170 x 209 mm compact chassis. Ethernet connectivity with standard Bitmain firmware. 5 to 45 degrees Celsius operating range at 5 to 90 percent humidity. SEAL02 chips with ±3% hashrate tolerance and ±5% power tolerance. Ships with PSU, 12 month Bitmain warranty, and free DDP worldwide from MillionMiner.

395 TH/s 5925W SHA-256 15 J/TH

Select Availability

Quantity

Total Price

$4,042.00

Buying 10 or more? Get custom bulk pricing

Pay with: Bank Transfer | BTC | ETH | USDT

Genuine

Tested hardware

Worldwide

Global shipping

Support

Mining experts

Hashrate

395 TH/s

Power

5925 W

Efficiency

15.00 J/TH

Noise

50 dB

Estimated Mining Returns

Based on current BTC price & network difficulty. Indicative only.

Period Daily Weekly Monthly
Income
$14.69 $102.83 $440.70
Electricity
-$11.38 -$79.66 -$341.40
Profit
$3.31 $23.17 $99.30

Using 0.080 $/kWh · Network difficulty as of today. Estimates only.

Adjust rate in the bar above

Updated daily. Last refresh: May 08, 2026. Estimates at $0.08/kWh.

Full Specifications

Hashrate 395 TH/s
Power Consumption 5925 W
Efficiency 15.00 J/TH
Algorithm SHA-256
Model Antminer S21+ Hydro
Release Year Nov 2024
Noise Level 50 dB
Dimensions 410 x 170 x 209
Weight 13.8 kg
Voltage 100-240V
Interfaces Ethernet
Operating Temp 5 - 35 °C
Humidity 5 - 90 %
Cooling Type Hydro

What's in the Box

Antminer S21+ Hydro
Power supply unit (PSU)
Power cables
Quick start guide

Contents may vary by batch. Exact items listed in order confirmation.

Quick Setup

1

Connect PSU to miner and plug into the outlet

2

Connect ethernet cable to your router or switch

3

Find miner IP via router admin or IP scanner tool

4

Open web interface, enter pool URL and wallet — start mining

Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.

Product Details

Bitmain Antminer S21 XP+ Hydro 395 TH/s Top Bin Hydro Cooled Bitcoin Miner: Complete Specifications, Deployment Guide, and Universal Voltage Positioning

The Bitmain Antminer S21 XP+ Hydro at 395 TH/s is the top bin of Bitmain's S21+ Hydro family, delivering peak hashrate output in a universal voltage single phase chassis. 395 TH/s SHA-256 hashrate at 5,925W continuous power draw and 15 J/TH efficiency. Built on SEAL02 chips with Bitmain's standard ±3% hashrate tolerance (real world output 383 to 407 TH/s) and ±5% power tolerance (peak draw reaching 6,220W). Released November 2024, this model represents Bitmain's most powerful universal voltage hydro option in April 2026, with newer S23 Hydro family hardware requiring 380V+ three phase industrial power that excludes most non industrial facilities. Naming clarification matters for buyer research. MillionMiner uses the "S21 XP+ Hydro" designation to distinguish this top bin from the 358 TH/s standard bin (identical 15 J/TH efficiency, 10 percent lower hashrate, lower acquisition cost). Most distributor channels including Mining Now, Intelion, MiningStore, OneMiners, and asic-miner-profitability list this product as "Antminer S21+ Hydro 395TH" or "S21+ Hyd 395TH". Bitmain's official product catalog shows the unit under the S21+ Hydro family branding. Buyers searching elsewhere should look for "S21+ Hydro 395TH" or "S21+ Hyd 395TH" in addition to the XP+ naming. Universal voltage compatibility is the critical deployment advantage distinguishing the S21+ Hydro from newer Bitmain hydro hardware. The S21+ Hydro family runs on 100 to 240V single phase power, compatible with: standard North American 240V NEMA 6 outlets on 20 to 30 amp dedicated circuits, European Schuko 230V single phase, UK BS 1363 240V service, Middle Eastern 220 to 240V commercial. At 240V and 5,925W, the unit draws approximately 25 amps continuous, fitting within standard 30 amp circuits common in commercial and industrial settings. The newer S23 Hydro family requires 380V+ three phase industrial service, excluding operators without access to three phase distribution. For small to mid scale mining operations, facility renovations, or hosting deployments in buildings not originally designed for three phase electrical service, the S21+ Hydro 395TH remains the relevant hydro option. OD10 closed loop hydro cooling technology represents Bitmain's mature second generation liquid cooling architecture. Closed loop water or water glycol circulation flows through internal chassis channels and carries heat to an external cooling loop. Operating noise runs 50 dB, substantially quieter than air cooled ASICs at 75 to 80 dB. The reduced acoustic signature enables deployment in noise sensitive commercial environments, hosting facilities with occupancy constraints, and locations with municipal noise ordinances that restrict industrial mining operations. Sustained hashrate stability without thermal throttling during prolonged operation at elevated ambient temperatures. Longer component life compared to air cooled equivalents because chips operate at consistent temperatures rather than cycling with fan response curves. Cooling infrastructure requirements: external water or water glycol loop circulation with pumps sized for fleet flow rate, standard plumbing fittings, heat rejection through dry coolers or water to water heat exchangers, and inline filtration. Each unit adds approximately 5.9 kW (20,135 BTU per hour) thermal load to the cooling system. Water glycol coolant costs significantly less than dielectric immersion fluid per liter and uses commodity industrial equipment readily available from any data center supplier. For facilities with existing liquid cooled server infrastructure or CDU systems, the S21+ Hydro integrates without learning curve or specialized equipment procurement. Top bin positioning matters for fleet economics. Chip binning produces natural performance distribution from silicon fabrication. Top bin SEAL02 chips run at higher clock frequencies, producing 10 percent more hashrate from identical chassis, power envelope, and cooling architecture. A 10 unit deployment of top bin 395TH units produces 3.95 PH/s versus 3.58 PH/s from 10 standard bin 358TH units. Same 59.25 kW power budget, same 10 rack positions, same cooling capacity, 370 TH/s additional hashrate output. Whether the top bin acquisition premium justifies this output differential depends on supplier pricing and deployment horizon. Typically, if per unit premium is under $400 versus standard bin, top bin wins on total lifetime economics at $0.06 per kWh industrial rates across 3 year deployments. Profitability in April 2026 varies meaningfully with electricity rate selection. Mining Now March 2026 data at $0.07 per kWh: $14.43 daily revenue, $11.38 electricity, $3.05 daily net profit, yielding $91.50 monthly or $1,113 annual net. asic-miner-profitability calculates approximately $4.90 daily profit at $0.07 per kWh industrial. OneMiners at $0.04 per kWh negotiated industrial hosting: $7 to $10 daily earnings. MillionMiner's conservative $0.08 per kWh onsite calculator: $12.87 daily revenue, $11.38 electricity, $1.49 daily net. Economic viability requires industrial electricity below $0.08 per kWh for reliably positive margins. At hosting rates of $0.04 to $0.05 per kWh, margins strengthen meaningfully. Physical specifications: 410 x 170 x 209 mm compact chassis at 13.8 kg. Meaningfully smaller footprint than the 473 TH/s S21 XP Hydro or the petahash class S23 Hyd 3U. Fits on standard shelving or simple rack configurations without dedicated 19 inch server rack hardware required. Ethernet 10/100M management through standard Bitmain firmware with Foreman, Awesome Miner, Hive OS, and Braiins OS+ compatibility. 5 to 45 degrees Celsius operating range at 5 to 90 percent humidity. PSU ships included with the unit. 12 month Bitmain manufacturer warranty. Free DDP delivery worldwide from MillionMiner.

Bitmain Antminer S21 XP+ Hydro 395 TH/s: Top Bin Universal Voltage Hydro

The Antminer S21 XP+ Hydro 395TH is the top bin of Bitmain's S21+
Hydro family, delivering 395 TH/s SHA-256 hashrate at 5,925W power draw and 15 J/TH
efficiency. The "XP+" designation reflects top bin positioning versus the 358 TH/s standard bin
(both share identical 15 J/TH efficiency with top bin silicon producing 10 percent more hashrate
from the same chassis). Also sold as "S21+ Hydro 395TH" across distributor channels. SEAL02
chips with ±3% hashrate tolerance (real output 383 to 407 TH/s) and ±5% power tolerance.
Universal voltage compatibility is the critical deployment advantage. The S21 XP+ Hydro runs
on 100 to 240V single phase power, compatible with standard commercial 240V circuits and
high voltage residential service. No three phase industrial power required. Newer Bitmain hydro
hardware (S23 Hydro series launched October 2025) requires 380V+ three phase and excludes
most non industrial facilities. For mining operations without three phase electrical service, the
S21+ Hydro series remains the relevant hydro option.
OD10 closed loop hydro cooling delivers 50 dB operating noise (quieter than typical air cooled
ASICs at 75 dB), sustained hashrate stability without thermal throttling during prolonged high
ambient temperature operation, and longer component life through consistent chip
temperatures. Water or water glycol closed loop with standard plumbing. External cooling loop
dissipates approximately 5.9 kW thermal load per unit.
Profitability per multiple 2026 calculators varies with electricity rate. Mining Now March 2026 at
$0.07 per kWh: $3.05 daily net profit. asic-miner-profitability: $4.90 daily. OneMiners at $0.04
per kWh hosting: $7 to $10 daily earnings. MillionMiner conservative $0.08 per kWh: $1.49 daily.
Released November 2024. 13.8 kg at 410 x 170 x 209 mm.

Need Help Choosing?

Our mining specialists can help you find the perfect miner for your setup and budget.

Bitmain Antminer S21 XP+ Hydro 395 TH/s Universal Voltage Water Cooled Miner

Top bin of Bitmain's S21+ Hydro family at 395 TH/s, 5,925W, and 15 J/TH
efficiency. 37 TH/s advantage over the 358 TH/s standard bin across identical chassis, cooling,
and voltage requirements, compounding to 370 TH/s additional hashrate across 10 units on the
same infrastructure. OD10 closed loop hydro cooling technology. 100 to 240V universal single
phase voltage. This is the critical advantage over newer Bitmain hydro hardware: the S23 Hydro
requires 380V+ three phase industrial service. The S21+ Hydro 395TH deploys on standard
single phase commercial or high voltage residential circuits. 50 dB operating noise. 13.8 kg at
410 x 170 x 209 mm. Released November 2024. Real world profitability per Mining Now March
2026 data at $0.07 per kWh: $3.05 daily net profit. At $0.04 per kWh industrial hosting rates per
OneMiners: $7 to $10 daily.

Top Bin 395 TH/s Universal Voltage

Top bin of the S21+ Hydro family. 100 to 240V single phase deployment on standard commercial circuits. No three phase required, unlike newer S23 Hydro.

15 J/TH Efficiency, 50 dB OD10 Cooling

Closed loop hydro cooling at 50 dB operating noise. 10 percent hashrate advantage over 358 TH/s standard bin from identical chassis and power envelope.

Compact 13.8 kg Single Phase Hydro

410 x 170 x 209 mm chassis at 13.8 kg. Deploys on standard shelving without rack requirements. Water glycol cooling with off the shelf plumbing.

Request a Bitcoin Miner Hosting Quote

4.7
star star star star star

4.7/5 Verified on Trustpilot

  • envelope 30,000+ miners hosted since 2020
  • timer Trusted by 1,200+ customers globally
iso made-in-germany trustpilot
google-review

Need a Hosting Offer?

Tell us what you need and our team will send you a customized ASIC miner hosting quote

miner

Miner

hosting

Hosting

FAQ

Frequently Asked Questions

395 TH/s of SHA-256 hashrate at 5,925W continuous power draw and 15 J/TH efficiency. Built on SEAL02 chips with Bitmain's standard ±3% hashrate tolerance, meaning real world output ranges from 383 to 407 TH/s. ±5% power tolerance allows wall draw to reach 6,220W at peak. This is the top bin of Bitmain's S21+ Hydro family, producing 10 percent more hashrate than the 358 TH/s standard bin at identical 15 J/TH efficiency, same chassis, and same power envelope ratios.

MillionMiner uses "XP+" to designate the top bin of the S21+ Hydro family (395 TH/s) versus the standard bin (358 TH/s). Both variants share identical 15 J/TH efficiency rating. The XP+ designation is MillionMiner's internal naming. Most distributor channels (Mining Now, Intelion, MiningStore, OneMiners, asic-miner-profitability) list this product as "Antminer S21+ Hydro 395TH" or "S21+ Hyd 395TH" without the XP+ prefix. Bitmain's official catalog shows the unit under S21+ Hydro family branding. Buyers comparing prices elsewhere should search for both the MillionMiner XP+ naming and the alternative S21+ Hydro 395TH naming.

The S21 XP+ Hydro runs on 100 to 240V single phase power, compatible with standard commercial and high voltage residential circuits. This excludes the three phase industrial infrastructure requirement that applies to Bitmain's newer S23 Hydro series (launched October 2025, requires 380V+ three phase). For small to mid scale mining operations, facility renovations without three phase electrical service, hosting deployments in older buildings, or operators in regions with limited three phase residential availability, universal voltage compatibility is the practical difference between "can deploy" and "cannot deploy" on current hydro hardware. At 240V single phase and 5,925W, the unit draws approximately 25 amps continuous, fitting within standard 30 amp commercial circuits.

Different generations with different deployment requirements. S21 XP+ Hydro (this product): 395 TH/s at 5,925W, 15 J/TH, 100 to 240V universal single phase, November 2024 release. S23 Hydro: 580 TH/s at 5,510W, 9.5 J/TH, 380V+ three phase industrial, October 2025 release. The S23 Hydro leads on absolute hashrate (47 percent more) and efficiency (37 percent better). The S21 XP+ Hydro 395TH leads on universal voltage deployment flexibility and typically on acquisition cost per unit. For operations with three phase electrical service, the S23 Hydro delivers better lifetime economics. For operations without three phase, the S21+ Hydro 395TH remains the relevant option.

Different positioning within the S21 generation hydro family. S21 XP+ Hydro 395TH (this product): 395 TH/s at 5,925W and 15 J/TH. S21 XP Hydro 473TH: 473 TH/s at 5,676W and 12 J/TH. The S21 XP Hydro 473TH leads on both absolute hashrate (20 percent more) and efficiency (20 percent better) within the same universal voltage envelope. However, the S21 XP Hydro 473TH typically commands higher acquisition cost reflecting its premium positioning. For operators prioritizing per unit efficiency and willing to pay the premium, the 473TH wins. For operators prioritizing acquisition cost at still strong efficiency, the 395TH represents better value.

OD10 is Bitmain's second generation closed loop hydro cooling architecture deployed across S21+ Hydro and successor hardware. Key characteristics: closed loop water or water glycol circulation through internal chassis channels, external heat rejection through facility cooling infrastructure, standard plumbing fittings for easy deployment, sealed fluid path preventing contamination or evaporation losses, sustained performance under high ambient temperatures. Practical benefits: 50 dB operating noise (versus 75 to 80 dB for air cooled ASICs), more consistent chip temperatures extending component life, higher sustained hashrate without thermal throttling, longer maintenance intervals. OD10 represents Bitmain's refinement of hydro cooling compared to earlier first generation liquid cooled hardware.

External closed loop water cooling system. Required components: circulation pump sized for fleet flow rate (2 to 4 liters per minute per unit typical), standard industrial plumbing fittings, water or water glycol coolant, external heat rejection through dry cooler or water to water heat exchanger rated for cumulative thermal load (approximately 5.9 kW per unit, 20,135 BTU per hour), inline particulate filtration. For single unit deployment, a compact dry cooler and small circulation pump provide adequate infrastructure. For multi unit deployment, scale thermal rejection proportionally. Water glycol coolant costs significantly less than dielectric immersion fluid and uses commodity industrial equipment from standard HVAC suppliers.

100 to 240V single phase power, universal voltage compatibility. At 240V and 5,925W continuous: approximately 25 amps draw. Requires dedicated 30 amp circuit minimum for reliable continuous operation. At 208V (common North American commercial three phase feeding single phase breakers): approximately 29 amps. At 120V North American residential standard: not practical given 5,925W draw would require 50 amps and most residential circuits cap at 20 amps. Best deployment scenarios: standard 240V commercial single phase, European 230V Schuko, UK 240V BS 1363, Middle Eastern 220 to 240V commercial, North American 240V NEMA 6.

Possible but constrained. Requirements: dedicated 240V 30 amp circuit (most residential electrical service has one 240V circuit for HVAC or EV charging, adding another requires electrical panel capacity assessment), cooling infrastructure for 5.9 kW thermal load (typically a dedicated mechanical space or outdoor dry cooler installation), water cooling loop with installation requiring plumbing skill. Not practical on standard residential 120V circuits. For operators with appropriate 240V circuit capacity and willingness to invest in home cooling infrastructure, the 50 dB noise level makes the S21 XP+ Hydro one of the few industrial ASIC options deployable in residential settings. Otherwise, commercial or hosted facility deployment fits better.

Varies meaningfully with electricity rate. Multiple 2026 data points: Mining Now March 2026 at $0.07 per kWh: $14.43 daily revenue, $11.38 electricity, $3.05 daily net profit. asic-miner-profitability: $4.90 daily profit. OneMiners at $0.04 per kWh negotiated hosting: $7 to $10 daily earnings. MillionMiner $0.08 per kWh onsite calculator: $1.49 daily net. ROI estimates range 869 to 2,124 days at $0.07 per kWh depending on BTC price scenarios. At industrial hosting rates of $0.04 to $0.05 per kWh, 500 to 700 day ROI is achievable at current Bitcoin conditions.

10 unit deployment at 395 TH/s produces 3.95 PH/s at 59.25 kW total power draw. Per 100 kW electrical panel: approximately 16 to 17 units producing 6.3 to 6.7 PH/s. Compare this against alternatives at the same power tier. 100 kW of S21 XP Hydro 473TH: approximately 17 units producing 8.04 PH/s (better aggregate hashrate through higher per unit efficiency). 100 kW of S23 Hydro 580TH: approximately 18 units producing 10.4 PH/s (best aggregate at three phase requirement). The S21+ Hydro 395TH wins when universal voltage compatibility is binding or when acquisition cost per unit is binding.

Any SHA-256 proof of work cryptocurrency. Bitcoin (BTC) is the primary target. Other compatible coins include Bitcoin Cash (BCH), Bitcoin SV (BSV), Fractal Bitcoin (FB), Namecoin (NMC), DigiByte (DGB SHA-256 chain). Merged mining BTC alongside BCH and BSV through supporting pools (ViaBTC, F2Pool) adds marginal secondary revenue without reducing Bitcoin hashrate contribution.

50 dB operating noise, substantially quieter than air cooled ASICs at 75 to 80 dB. Comparable to a quiet office or rainfall at moderate intensity. Enables deployment in environments where industrial ASIC noise would be unacceptable: commercial buildings with occupancy, hosting facilities near residential areas, home deployments with appropriate cooling infrastructure, research or educational mining demonstrations. Note that the external water cooling loop (pump, dry cooler, circulation equipment) adds additional noise depending on cooling system design and location, so total deployment acoustic signature depends on cooling infrastructure selection.

Standard Bitmain hydro deployment. Step one: install dedicated 240V single phase 30 amp circuit with proper grounding. Step two: install and commission external water cooling loop including pumps, plumbing, coolant fill, and dry cooler or heat exchanger. Step three: rack or shelf mount the S21 XP+ Hydro unit and connect water inlet/outlet fittings to your manifold system. Verify zero leaks before energizing. Step four: connect PSU power cable and Ethernet management cable. Step five: power on, allow coolant flow to stabilize for 2 to 3 minutes, find miner IP through router DHCP client list or IP scanner, open Bitmain web interface at device IP. Step six: configure mining pool URL and Bitcoin wallet address, verify hashrate reaches 380+ TH/s within 10 to 15 minutes.

Standard hydro cooling maintenance. Weekly visual inspection of water fittings for leaks or corrosion. Monthly coolant quality testing (pH within spec, particulate levels minimal). Every 12 to 24 months full coolant replacement depending on fluid chemistry and water quality. Quarterly pump and dry cooler inspection. Inline filter replacement when pressure differential exceeds specification. Hashboard failure rates on hydro units run meaningfully lower than air cooled equivalents because chips operate at consistent temperatures rather than cycling with fan response. Maintenance simpler than immersion fluid management because water glycol is cheaper and more widely available than dielectric fluid.

Bitmain 12 month factory warranty on the complete machine covering manufacturing defects and hardware failures under normal operation within specified environmental ranges. Warranty exclusions include damage from coolant quality neglect, leaks caused by improper fitting installation, physical damage during cooling loop maintenance, power surge damage from inadequate electrical protection, operation outside the 5 to 45 degree Celsius range, and unauthorized firmware modifications. MillionMiner routes warranty claims through direct Bitmain channels. Document coolant testing schedule and maintenance logs to protect warranty coverage.

Yes. MillionMiner operates managed hosting facilities with single phase and three phase electrical service, water cooling infrastructure, and professional fleet management capable of supporting S21 XP+ Hydro deployments. Hosted deployment eliminates facility infrastructure CapEx (electrical service, cooling loop installation, rack hardware) and leverages MillionMiner's negotiated industrial electricity rates typically $0.04 to $0.06 per kWh versus $0.08 to $0.12 residential rates. Contact MillionMiner sales through the Get a Quote button for hosting pricing, capacity availability, and deployment timelines.

Any Stratum compatible Bitcoin pool. Foundry USA leads by network hashrate share. F2Pool has the longest operational track record and supports merged mining. AntPool is the native Bitmain ecosystem pool with deep integration. ViaBTC offers accumulation mode payouts for Bitcoin acquisition strategies. Luxor supports hashrate derivatives products. For fleet deployments above 5 PH/s (equivalent to approximately 13 units), direct negotiated agreements with major pools typically secure reduced fees below standard 1 to 2 percent rates.

CapEx beyond miner acquisition: 240V electrical circuit installation ($300 to $1,500 per circuit), water cooling loop infrastructure ($2,000 to $8,000 per rack depending on scale and existing facility infrastructure), basic rack or shelf hardware ($200 to $800). Annual OpEx per unit at 5.9 kW continuous: electricity at $4,152 at $0.08 per kWh, $3,633 at $0.07 per kWh, $2,076 at $0.04 per kWh industrial hosting rates. Water glycol coolant maintenance ($100 to $200 per unit annually). Spare parts and maintenance reserves (5 percent of acquisition annually). 3 year TCO per unit at $0.07 per kWh: approximately $4,042 hardware plus $10,900 electricity plus $900 maintenance equals $15,842 total. 3 year gross revenue at $0.07 per kWh profitability: approximately $3,340.

Within Bitmain S21 generation hydro: the S21+ Hydro 358TH standard bin for lower acquisition cost, S21 XP Hydro 473TH for better efficiency at premium pricing (12 J/TH), S21e XP Hydro 860TH for petahash tier universal voltage deployment. Within Bitmain next generation hydro: S23 Hydro 580TH at 9.5 J/TH, S23 Hyd 3U 1.16 PH/s for three phase industrial deployment, S23E Hyd 2U 865TH. For operators diversifying across manufacturers at the hydro tier: Whatsminer M73S+ 540 TH/s at three phase rack mount, M79S 1.35 PH/s at high power hydro tier. Cross algorithm fleet diversification: Antminer KS7 for Kaspa, Antminer L11 for Litecoin and Dogecoin, IceRiver AE3 for Aleo. For air cooled deployment at lower infrastructure commitment: Antminer S21 XP 270TH represents the single phase air cooled ceiling. MillionMiner's ASIC hosting service accepts S21 XP+ Hydro units at negotiated industrial electricity rates.

Get a Quote