Bitmain
Model: Antminer S23 Hydro
580 TH/s hydro cooled SHA-256 Bitcoin miner at 5,510W power draw and 9.5 J/TH efficiency, the most efficient model in the S23 generation and one of the highest efficiency Bitcoin ASICs available in April 2026. First Bitmain SHA-256 generation to break the 500 TH/s threshold while maintaining sub 10 J/TH efficiency. Announced June 2025 with batch shipping starting January 2026. Chip tolerances: ±3% hashrate (563 to 597 TH/s real range) and ±5% power (peak 5,786W). 380 to 415V three phase industrial power requirement excludes non industrial facility deployment. 50 dB operating noise from the chassis (external cooling infrastructure adds separate acoustic signature). 410 x 170 x 209 mm compact chassis at 13.5 kg enables dense rack deployment. Critical operational constraint: inlet water temperature must be above 20 degrees Celsius for miner startup. External dry cooler ambient temperature limits scale with outlet water temperature. Ethernet connectivity with standard Bitmain firmware. Ships with PSU, 365 day Bitmain warranty, and free DDP worldwide from MillionMiner.
Select Availability
Quantity
$14,299.00
Buying 10 or more? Get custom bulk pricing
Genuine
Tested hardware
Worldwide
Global shipping
Support
Mining experts
Hashrate
580 TH/s
Power
5510 W
Efficiency
9.50 J/TH
Noise
50 dB
Based on current BTC price & network difficulty. Indicative only.
| Period | Daily | Weekly | Monthly |
|---|---|---|---|
|
Income
|
$22.48 | $157.36 | $674.40 |
|
Electricity
|
-$6.61 | -$46.27 | -$198.30 |
|
Profit
|
$15.86 | $111.02 | $475.80 |
Using 0.050 $/kWh · Network difficulty as of today. Estimates only.
Adjust rate in the bar aboveUpdated daily. Last refresh: May 15, 2026. Estimates at $0.08/kWh.
Contents may vary by batch. Exact items listed in order confirmation.
Connect PSU to miner and plug into the outlet
Connect ethernet cable to your router or switch
Find miner IP via router admin or IP scanner tool
Open web interface, enter pool URL and wallet — start mining
Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.
Pricing, lead time, and hosting options. Personal advice from our sales team.
Pricing, lead time, and hosting options. Personal advice from our sales team.
Our mining specialists can help you find the perfect miner for your setup and budget.
First Bitmain SHA-256 unit to break 500 TH/s while maintaining sub 10 J/TH efficiency. 21 percent efficiency gain over S21 XP Hydro.
Same 410 x 170 x 209 mm footprint as S21+ Hydro with 47 percent more hashrate. 380 to 415V three phase industrial deployment.
Inlet water must be above 20 degrees Celsius for miner startup. Dry cooler ambient limits scale with outlet temperature. Plan cooling loop carefully.
580 TH/s of SHA-256 hashrate at 5,510W continuous power draw and 9.5 J/TH efficiency. Bitmain's ±3% hashrate tolerance means real world output ranges 563 to 597 TH/s. ±5% power tolerance means wall draw can reach 5,786W peak. This is the most efficient model in the S23 generation, beating the air cooled S23 (11 J/TH), S23 Immersion (12 J/TH), prior generation S21 XP Hydro (12 J/TH), and S21+ Hydro family (15 J/TH). First Bitmain SHA-256 unit to break the 500 TH/s threshold while maintaining sub 10 J/TH efficiency.
Industrial mining economics compound across deployment scale and time. At $0.07 per kWh industrial electricity, each efficiency point in J/TH translates to approximately $25 annual electricity cost difference per terahash of hashrate. Across a 10 unit S23 Hydro deployment producing 5.8 PH/s, switching from 12 J/TH hardware to 9.5 J/TH saves approximately $18,000 annually in electricity costs. Over 3 year deployment horizons, this compounds to $54,000 saved per 10 units just from efficiency improvement. For megawatt scale operations, efficiency leadership defines profitability against competitors running prior generation hardware.
Same efficiency, different form factor and density tier. S23 Hydro 580TH (this product): 580 TH/s at 5,510W and 9.5 J/TH in a compact 410 x 170 x 209 mm chassis at 13.5 kg. S23 Hyd 3U 1.16 PH/s: 1,160 TH/s at 11,020W and 9.5 J/TH in a 3U rack mount chassis. Both deliver identical per terahash efficiency. The 3U variant doubles hashrate per unit at double power draw, enabling higher density in 19 inch server rack deployment. The 580TH variant fits compact shelf or standard rack deployment without specific 3U rack hardware requirement. Choose based on facility rack infrastructure and per unit management preferences.
380 to 415V three phase industrial power. At 415V three phase: approximately 8 amps per phase continuous, 14 amps per phase at peak draw. At 380V three phase: approximately 8.7 amps per phase continuous. Fits within standard 16 amp three phase breakers with headroom. Three phase industrial service is typical in dedicated mining facilities, data centers, commercial industrial buildings, and professional hosting operations. Absent from most retail commercial space and all residential settings. Facilities without three phase electrical distribution cannot deploy the S23 Hydro directly. The S21+ Hydro 395TH family with 100 to 240V universal single phase compatibility remains the relevant alternative for such deployments.
Per Bitmain's operational specifications documented by BT-Miners: if inlet water temperature is below 20 degrees Celsius, the miner cannot start. This is a hardware protection interlock, not a performance recommendation. External dry cooler specifications further tie maximum facility ambient temperature to outlet water temperature: if outlet temperature is 35 degrees, maximum ambient temperature is 30 degrees. If outlet temperature is 45 degrees, maximum ambient is 40 degrees. Cooling loop design must account for these constraints across seasonal temperature variation, particularly in regions with cold winters (inlet water below 20°C won't start) or hot summers (ambient above cooling capacity causes thermal throttling or shutdown).
External closed loop water cooling system with controlled temperature management. Required components: circulation pumps sized for fleet flow rate, standard plumbing fittings with thread or quick disconnect couplings, water or water glycol coolant mixture, external heat rejection through dry coolers rated for total thermal load (approximately 5.5 kW per unit, 18,760 BTU per hour), inline particulate filtration, temperature monitoring at both inlet and outlet, and automated flow monitoring. Multi unit deployments typically use manifold distribution with individual unit isolation valves for maintenance access. Budget $5,000 to $20,000 per rack for hydro cooling infrastructure depending on fleet size and existing facility capability.
50 dB chassis noise, which is effectively silent given the absence of high speed cooling fans. The external cooling infrastructure generates acoustic signature separately. Pumps typically run 45 to 55 dB depending on equipment selection. Dry coolers and circulation plants typically run 55 to 70 dB depending on airflow requirements and physical design. Professional hydro cooled mining facilities specifically isolate miner deployment space from cooling plant locations to minimize acoustic impact on mining operations. Total deployment noise depends substantially on cooling infrastructure design rather than miner chassis.
Generally no. The 380 to 415V three phase power requirement is absent from residential electrical service in most regions. Additionally, the water cooling infrastructure requirements (circulation pumps, dry coolers, temperature managed loop, 20°C minimum inlet constraint, leak risk assessment) make home deployment impractical for most operators. Some advanced home deployments with three phase service (rare residential configurations or converted commercial buildings) and dedicated mechanical spaces can support S23 Hydro operation. For standard residential mining, the Antminer S21 XP 270TH air cooled on single phase 240V represents the practical ceiling. For operators wanting hydro cooling at home, the S21+ Hydro 395TH on universal single phase voltage offers a more feasible path.
Strong in April 2026 across multiple sources. MillionMiner $0.08 per kWh onsite calculator: $18.90 daily revenue, $10.58 electricity, $8.32 net profit per day. asic-miner-profitability at $0.08 per kWh: $28.91 daily revenue, $10.58 electricity, $18.33 net profit. OneMiners April to August 2025 data at $0.04 per kWh industrial hosting: $41 to $55 daily earnings. ROI estimates: 10 to 15 months at $0.04 per kWh hosting rates, 2 to 3 years at $0.07 per kWh commercial rates. At BTC price scenarios above $160,000, daily profit projection exceeds $32 per unit at current electricity assumptions.
Efficiency and form factor differentiation across the S23 lineup. S23 Air (318 TH/s at 11 J/TH): standard air cooled for conventional mining facility deployment. S23 Immersion (442 TH/s at 12 J/TH): immersion tank deployment for operators with immersion infrastructure. S23 Hydro 580TH (this product): compact hydro at 9.5 J/TH. S23 Hyd 3U (1.16 PH/s at 9.5 J/TH): high density hydro rack mount. S23E Hyd 2U (865 TH/s): higher tier hydro. The S23 Hydro 580TH leads on single unit efficiency for hydro deployments without specific 3U rack hardware, positioning between the S23 Immersion and S23 Hyd 3U on acquisition cost and deployment complexity.
100 kW industrial electrical panel supports approximately 18 S23 Hydro units producing 10.44 PH/s aggregate hashrate. Compare against alternatives at the same power budget: 100 kW of S21 XP Hydro 473TH (17 units producing 8.04 PH/s, 23 percent less aggregate hashrate), 100 kW of S21+ Hydro 395TH (17 units producing 6.72 PH/s, 36 percent less aggregate hashrate). Efficiency leadership compounds into meaningfully better aggregate output at the same power draw budget. For facilities constrained by electrical capacity rather than physical space, the S23 Hydro maximizes revenue potential.
Any SHA-256 proof of work cryptocurrency. Bitcoin (BTC) is the primary target. Other compatible coins include Bitcoin Cash (BCH), Bitcoin SV (BSV), Fractal Bitcoin (FB), Namecoin (NMC), DigiByte (DGB SHA-256 chain). Merged mining BTC alongside BCH and BSV through supporting pools (ViaBTC, F2Pool) adds marginal secondary revenue without reducing Bitcoin hashrate contribution.
Industrial deployment with three phase power and hydro cooling infrastructure. Step one: install dedicated 380 to 415V three phase electrical service with 16 amp breakers minimum. Step two: install and commission external water cooling loop with pumps, plumbing, coolant fill, dry cooler or heat exchanger, inline filtration, and temperature monitoring. Verify inlet water temperature capability above 20°C across expected operating conditions. Step three: rack or shelf mount the S23 Hydro units and connect water inlet/outlet fittings to manifold system with individual isolation valves. Verify zero leaks before energizing. Step four: connect PSU power and Ethernet management cables. Step five: power on, allow coolant flow to stabilize for 2 to 3 minutes with inlet temperature above 20°C, find miner IP through DHCP, open Bitmain web interface, configure mining pool URL and Bitcoin wallet, verify hashrate reaches 565+ TH/s within 10 to 15 minutes.
Standard industrial hydro cooling maintenance with specific attention to temperature management. Weekly visual inspection of water fittings for leaks or corrosion. Monthly coolant quality testing (pH within spec, particulate levels minimal, glycol concentration if applicable). Every 12 to 24 months full coolant replacement depending on fluid chemistry and water quality. Quarterly pump and dry cooler inspection including flow rate verification and ambient temperature performance. Inline filter replacement when pressure differential exceeds specification. Hashboard failure rates on S23 Hydro units run meaningfully lower than air cooled equivalents because chips operate at consistent temperatures. Temperature sensor calibration checks semi annually to ensure the 20°C inlet constraint operates correctly.
Bitmain 365 day factory warranty on the complete machine covering manufacturing defects and hardware failures under normal operation within specified environmental ranges. Warranty exclusions include damage from coolant quality neglect, leaks caused by improper fitting installation, physical damage during cooling loop maintenance, power surge damage from inadequate electrical protection, operation outside specified environmental ranges, and unauthorized firmware modifications. Document coolant testing schedule, inlet temperature logs, and maintenance records to protect warranty coverage. MillionMiner routes warranty claims through direct Bitmain channels.
Yes. MillionMiner operates managed hosting facilities with 380 to 415V three phase industrial power and hydro cooling infrastructure capable of supporting S23 Hydro deployments. Hosted deployment eliminates facility infrastructure CapEx (three phase electrical service, water cooling loop installation, dry cooler infrastructure, temperature management systems) and leverages MillionMiner's negotiated industrial electricity rates typically $0.04 to $0.06 per kWh. At these hosted rates, the 10 to 15 month ROI estimates documented by OneMiners become achievable. Contact MillionMiner sales through the Get a Quote button for hosting pricing, capacity availability, and deployment timelines.
Any Stratum compatible Bitcoin pool. Foundry USA leads by network hashrate share. F2Pool has the longest operational track record and supports merged mining. AntPool is the native Bitmain ecosystem pool with deep integration. ViaBTC offers accumulation mode payouts. Luxor supports hashrate derivatives products. For fleet deployments above 5.8 PH/s (equivalent to 10+ S23 Hydro units), direct negotiated agreements with major pools typically secure reduced fees below standard rates.
CapEx beyond miner acquisition: three phase electrical service installation ($5,000 to $20,000 per facility depending on existing infrastructure), water cooling loop and dry cooler infrastructure ($5,000 to $20,000 per rack depending on capacity), temperature monitoring systems ($500 to $2,000 per rack), inline filtration and particulate management. Annual OpEx per unit at 5.51 kW continuous: electricity at $3,862 at $0.08 per kWh, $3,378 at $0.07 per kWh, $1,931 at $0.04 per kWh industrial hosting rates. Water glycol coolant maintenance ($100 to $200 annually per unit). Spare parts and maintenance reserves (3 to 5 percent of acquisition annually). 3 year TCO per unit at $0.07 per kWh: approximately $14,299 hardware plus $10,134 electricity plus $1,000 maintenance equals $25,433 total. 3 year gross revenue at $0.07 per kWh profitability: $15,000 to $20,000.
The S23 Hydro was announced by Bitmain in June 2025 with batch shipping starting January 2026 per OneMiners and TheMiningFuture distribution documentation. Early batch hardware carries standard Bitmain warranty coverage. MillionMiner inventory typically ships from current production batches with factory shipment within 5 to 10 business days for standard orders. Bulk deployments coordinate with factory production schedules for delivery timelines. Verify current batch date and shipping timeline through MillionMiner's Get a Quote process for large fleet orders.
Within Bitmain S23 generation: S23 Air 318TH for air cooled deployment, S23 Immersion 442TH for tank deployment, S23 Hyd 3U 1.16 PH/s for high density rack deployment, S23E Hyd 2U 865TH for tier upgrade. Within Bitmain S21 generation hydro: S21 XP Hydro 473TH for single phase universal voltage alternative, S21+ Hydro 395TH for lower tier single phase deployment, S21e XP Hyd 430TH and S21e XP Hydro 860TH for prior generation hydro options. For operators diversifying across manufacturers at the hydro tier: Whatsminer M73S+ 540TH and M79S 1.35 PH/s provide MicroBT alternatives. Cross algorithm fleet diversification: Antminer KS7 for Kaspa, Antminer L11 for Litecoin and Dogecoin, IceRiver AE3 for Aleo. For air cooled deployment: Antminer S21 XP 270TH represents the air cooled ceiling. MillionMiner's ASIC hosting service accepts S23 Hydro units at negotiated industrial three phase electricity rates with full hydro infrastructure included.