Mining · 27 min read · Aug 31, 2026

Bitcoin Mining Curtailment: Why Grids Pay Miners to Turn Off, and How We Run It

Alex Morgan

Head of Mining Operations

Bitcoin Mining Curtailment: Why Grids Pay Miners to Turn Off, and How We Run It
In August 2023, the most profitable thing a large Texas Bitcoin miner did was not mine Bitcoin. Riot Platforms earned about $8.9 million from the 333 coins it produced that month, and $31.7 million from the grid for repeatedly not producing: $24.2 million in power curtailment credits plus $7.4 million from demand response programs, while cutting more than 95% of its consumption during peak hours of a record heat wave. Turning off out-earned turning on by more than three to one.

That is curtailment, and it is the least understood profit center in mining. The same word also names the industry's supply story: grids ordering wind and solar farms to stop producing because the system cannot move or absorb their output, over 8 TWh of it in Texas alone in 2024. This guide covers the whole machine: both meanings of the word, the four ways a curtailed mining fleet gets paid, the real numbers from public filings, the rule changes landing between now and the end of 2026, what exists outside Texas, and what all of it looks like from a hosted customer's seat at our own sites.

The short answer

  • Curtailment runs both directions: grids curtail generators (wind and solar switched off for lack of takers: 8+ TWh in ERCOT in 2024, 3.4 TWh in California) and curtail loads (big consumers paid to stop drawing power when the grid is stressed). Mining is the one industry built to profit from both.
  • Miners are paid because they're fast: a fleet sheds full load in seconds with nothing broken and nothing lost but hashrate, which qualifies it for the grid's fastest, best-paying flexibility programs.
  • The money is real and documented: one Texas miner booked roughly $71 million in credits in 2023, $56.7 million through the 2025 bear market, and $21 million in Q1 2026 alone, pulling its net power cost to 3.0 cents/kWh.
  • For a hosted customer it's invisible by design: the site plays the curtailment game at fleet scale while your rate stays flat all-in; what you see is a brief, planned dip on the grid's worst hours, not a bill spike.


What Is Curtailment?

Curtailment is a deliberate reduction of electricity that could have flowed but didn't, and the grid does it in two opposite directions. Generation curtailment is the grid telling wind and solar plants to stop producing, because transmission lines are full or midday supply exceeds demand. Load curtailment is a large consumer reducing its draw on request or on price, handing megawatts back when the system needs them. When a mining article says curtailment it usually means the second; when an energy analyst says it they usually mean the first. Both are the same underlying failure: power in the wrong place at the wrong time.
What curtailment means, both ways, drawn as one scene from noon to 6 PM: on the left, under a dawn-orange sky, a wind farm and solar panels sit beneath their generation curve, with the area between what they could have produced and what they were allowed to produce hatched and labeled curtailed (ERCOT switched off over 8 TWh of wind and solar in 2024; CAISO 3.4 TWh, 93% solar); in the middle, transmission pylons with sagging wires carry a WIRES FULL badge; on the right, in evening blue, a mining hall with fan walls shows its load stepping down in seconds on signal, tagged PAID TO STOP. A day axis underneath runs from noon, too much power, to 6 PM, not enough: the same afternoon, both directions.
The generation side has become enormous. ERCOT curtailed more than 8 TWh of wind and solar in 2024, with West Texas and Panhandle nodes hit hardest because they generate more than the wires can carry east. California's CAISO curtailed 3.4 TWh the same year, 93% of it solar and up 29% year over year, against just 188 GWh a decade earlier. Great Britain curtailed over a tenth of its wind output at a cost of about £1.2 billion, global renewable curtailment passed 50 TWh, and beside all of it the world flared 151 billion cubic meters of gas, the most since 2007. Meanwhile the queue of new generation waiting to connect to US grids reached roughly 2,600 GW with median waits past five years. Energy that exists but can't be sold is the defining surplus of this decade, and it is the reason green Bitcoin mining is an energy story before it is an emissions story.

Texas already ran this experiment once. The CREZ transmission build-out, 3,600 miles of lines completed in 2013 for about $7 billion, cut wind curtailment from the mid-teens to nearly zero. A decade of renewable growth later, curtailment is back above 8 TWh. Wires alone don't stay ahead of generation; the grid also needs flexible demand that can live where the surplus is, which is precisely the niche mining filled.

Why Do Grids Pay Bitcoin Miners to Turn Off?

Because a mining fleet is the fastest large industrial load on the system, and speed is what grid emergencies are priced in. A fleet running flat out can shed essentially all of its draw in seconds, hold that state for ten minutes or ten hours, and restart in minutes with nothing spoiled: no frozen smelter pots, no interrupted customer workloads, no scrapped product. The only cost is the Bitcoin not mined during the window, a number the operator can price to the dollar against hashprice. No other load of comparable size responds that fast with that little consequence, which is why the US Energy Information Administration describes ERCOT's voluntary curtailment agreements as consisting primarily of crypto mining facilities.
How fast big loads can actually get out of the way, drawn as an engineer's response plot: load remaining from 100% to 0% against time since the grid called, on a log scale from 0.1 seconds to 1 hour. A battery drops instantly but discharges with limited hours in the tank; the mining fleet's curve plunges from full load to near zero within seconds, nothing broken; an aluminum smelter ramps down slowly through a shaded zone that costs equipment; an AI or cloud data center barely dips, held up by a dashed SLA floor because deep fast cuts breach contracts; a dotted gas peaker line rises from zero for contrast, adding supply but needing 10 to 30 minutes just to start. Strip: ERCOT's fastest reserve product wants automatic response in about 30 seconds, and one industrial load qualifies with ease.
That speed has a track record grid operators trust. Texas miners cut load through Winter Storm Uri in 2021, the record heat waves of 2023, Winter Storm Heather in 2024 and Winter Storm Elliott before it, each time returning hundreds of megawatts to the system within minutes of the call. The 2023 summer, when ERCOT crossed extreme conditions repeatedly, ended without firm load shedding in part because flexible load and the new reserve products absorbed the stress. This is also why the comparison with AI data centers matters: an AI facility serving customer workloads cannot cut 95% of its draw on a summer afternoon without breaching contracts, so as mining sites convert to AI hosting, analysts have started warning that Texas is trading away its emergency brake. Flexibility is mining's structural advantage, and it's one the power purchase agreement side of the industry prices explicitly.

The Four Ways a Curtailed Fleet Gets Paid

Curtailment revenue is not one program, it's a stack of four distinct mechanisms, and a sophisticated operator runs all of them at once. The four lanes:
Four lines from one fleet to a paycheck, drawn as a transit map: every line starts at the MINING FLEET station. The amber ECONOMIC line runs through stations for price rises past mining breakeven and fleet powers down, resumes on the flip, terminating at AVOIDED COST plus power resold. The blue 4CP line runs June to September through four small peak-window stations, the four 15-minute intervals that set next year's transmission bill, with a note to sit out dozens of afternoons to miss all four, terminating at NEXT YEAR'S WIRES BILL CUT. The purple ANCILLARY line passes enroll and automate, then branches into RRS at about 30 seconds automatic with top rates, ECRS at 10 minutes, and NON-SPIN at 30 minutes as the entry tier, converging at CAPACITY PAY per MW plus performance per event. A dashed red EMERGENCY line for storms and record peaks, ERS and voluntary agreements, terminates at CONTRACT CREDITS.
Lane
Trigger
Response needed
How it pays
Economic curtailment
Real-time price above mining breakeven
Your own decision, minutes
Power cost avoided, or power resold; ERCOT's own resource-adequacy modeling uses about $72/MWh as mining's switch-off point
4CP avoidance
Highest 15-min grid interval, once per summer month
Predictive; sit out candidate peak afternoons
Next year's transmission charge shrinks; exposure runs roughly $50,000 to $67,000 per MW per year for a full-load site
Ancillary services
ERCOT dispatch or frequency signal
RRS ~30 s automatic; ECRS 10 min; Non-Spin 30 min
Capacity payments per enrolled MW plus performance payments per event; industry estimates for fully stacked programs run to $300,000 per MW-year at the high end
Emergency + contractedGrid emergencies, storms, record peaks
Per agreement; ERS deployments
Contracted credits; the lane behind the largest single-month figures on record
Program structure per ERCOT documentation and the Hashrate Index / Luxor demand-response series (2026); 4CP exposure per Hashrate Index and GridStatus; the $72/MWh figure is ERCOT's stated mining breakeven in its Monthly Outlook for Resource Adequacy; the $300K/MW-yr figure is an upper industry estimate (OBM) for stacked participation, not a typical result. Reproduce with attribution and a link.

Two of these deserve a closer look. 4CP is the strangest and most consequential: ERCOT allocates transmission costs to large consumers based on their average draw during just four 15-minute intervals, the single highest of each summer month, measured after the fact. Miss the windows and a site's wires bill for the following twelve months collapses; run through them at full load and a 25 MW site can owe on the order of $1.25 million. Since nobody knows in advance which interval will be the monthly peak, miners curtail through dozens of candidate late afternoons each summer, and prediction quality is worth real money. Ancillary services invert the logic: the fleet is paid a capacity fee simply for standing ready, whether or not it is ever dispatched, with the fastest product (RRS, automatic response in roughly 30 seconds) paying the highest rates. Mining is one of the few load types that can qualify across the full product stack, and automation is the entry ticket.

What Is Curtailment Actually Worth? The Riot Record

The reference numbers come from SEC filings, which is why one company's Texas operation has become the industry's proof case. The famous month is August 2023: $24.2 million in curtailment credits plus $7.4 million in demand response against $8.9 million of mined Bitcoin, while shedding more than 95% of load at demand peaks. But the more important story is that the income survived the cycle:
The month turning off outweighed turning on, drawn as a tipped balance scale for August 2023, one miner, one month: the left pan, riding high, holds $8.9M, the 333 BTC actually mined while curtailing 95%+ of load at the peaks; the right pan, sunk low, holds two stacked blocks, $24.2M of ERCOT curtailment credits and $7.4M of demand response, with an arc reading 3.6x, the grid outpaid the coin. Below, credits per period to scale: 2023 about $71M, 2025 $56.7M, Q1 2026 $21M, up 169% year over year. Footer: those Q1 credits pulled net power cost to 3.0 cents per kWh and cash cost per mined BTC to $44,629 against a $75,964 average price.
Read the bottom line of that diagram again, because it's the entire strategic argument: in the first quarter of 2026, curtailment credits pulled the company's net power cost down to 3.0 cents per kWh from 3.7 cents across 2025, and its cash cost to mine one Bitcoin came in at $44,629 against an average price of $75,964. In a market where electricity is most of the cost of every coin, curtailment is not a bonus line item; it is a permanent cost advantage measured in whole cents per kilowatt-hour. That advantage compounds when mining revenue is weak (cheap to switch off, so credits flow) and shrinks when hashprice runs hot (each curtailed hour forgoes more), which makes it a natural hedge across the cycle rather than a bull-market bonus.

Ready to Start Mining?

Free worldwide DDP shipping. Professional hosting from $0.055/kWh.

The Rules Are Changing: SB 6, 12CP, and the AI Squeeze

Curtailment's next chapter is being written right now, and three forces are converging on it:
  • Senate Bill 6 (signed June 2025) made flexibility a legal requirement. Transmission-voltage large loads interconnecting after December 31, 2025 must carry curtailment protocols allowing them to be shed during firm load shed, and ERCOT was directed to competitively procure demand reductions from customers drawing 75 MW or more. What miners volunteered to do, every giant new load will now be built to do.
  • 4CP itself is under review. The same law requires the Public Utility Commission to finish reviewing the coincident-peak methodology and amend its rules by December 31, 2026, and ERCOT is openly rewriting how large loads connect and pay for transmission. Critics argue flexible loads dodge wires costs; one design on the table is a shift toward 12 coincident peaks, which would turn a four-window summer game into a year-round one. Whatever lands, the 2026 4CP season is likely the last under the old rules.
  • The grid is growing into the flexibility it has. Texas broke its all-time demand record twice in two days in July 2026, peaking at a preliminary 91,308 MW, and ERCOT told regulators demand could roughly double within six years. At the same time, miners converting capacity to AI hosting are removing the very flexibility the system leans on, since AI workloads can't shed load the way hashrate can, and North American public miners alone held more than 5.1 GW of operational capacity in Texas as of Q1. Scarcer flexibility in a hungrier market points one direction: the megawatts that can still get out of the way should command more, not less.
The honest caveat runs the other way too: rising hashprice raises the price a miner needs to see before switching off, batteries are absorbing some of the fast-response niche, and a rewritten 4CP could trim the single richest lane. Curtailment income is program income, and programs change. That's an argument for operating inside them professionally, not for assuming any single year's figures repeat forever.

Is Curtailment Only a Texas Thing?

Texas is the deepest market, but the pattern is global because the surplus is global. The same flexible-load logic operates wherever power is stranded, seasonal, or volatile:
  • Canada: Alberta's energy-only market rewards curtailing straight off the price signal, including negative-price hours; Ontario and Quebec run capacity, peak-shaving and interruptible-tariff programs; industry mappings count a dozen distinct programs across Canada and ERCOT where a flexible miner rates a strong fit.
  • Stranded and flared energy: the 151 billion cubic meters of gas flared globally in 2025 is curtailment's uglier cousin, and wellhead mining pioneered by operators like Crusoe turned billions of cubic feet of it into compute instead of flame. The same behind-the-meter model sits next to curtailed wind and solar, soaking up output the wires can't take.
  • Hydro seasons: wet-season surpluses in markets like Paraguay and Ethiopia are seasonal curtailment by another name, and they're where a large share of new hydro-cooled mining capacity has landed. Our own take on how sites choose their power is covered in what a Bitcoin mining farm is and the sustainable mining breakdown.


How We Handle Curtailment at MillionMiner

Everything above is the operator's view. Here is the honest translation for the person who actually matters on this site: someone with machines, or machines on a quote, asking what curtailment does to them. The short version: at a professionally run host, curtailment is something done for your economics, not to them.
One Texas scorcher, three synced lanes on a shared midnight-to-midnight clock, with the year's worst hours shaded in late afternoon: the GRID PRICE lane spikes into a scarcity peak; the OUR SITE HASHRATE lane runs at 100% and hashing, then shows a planned dip landing exactly inside the shaded hours, the site selling megawatts back and earning credits before a clean restart; the YOUR HOSTED RATE lane is a perfectly flat line labeled flat, all-in, no spike, because the host carries the market risk. Strip: the dip lands exactly where mining through the price would lose money, and the invoice line never learns the event happened.
Our sites are built for exactly this game: 95 MW of US capacity running 1.79 EH/s, at facilities with their own substations and contracted power, operated to a 99.9% uptime target. Customers pay a flat, all-in hosted rate, which means the power-market risk that curtailment events represent stays on our side of the contract: when a Texas afternoon prices at the year's peak, your invoice does not know about it. The fleet's flexibility is managed at site level, where it's actually worth something, and the operational effect a customer sees is a brief, planned dip in hashrate concentrated in the handful of hours per year when the grid, and therefore power pricing, is at its most extreme. Those are, not coincidentally, the exact hours when mining through the spike would have been the least profitable thing the fleet could do.

Hosted at a managed site
Home, retail or indexed plan
Own farm, in programs
Who carries price spikes
The host; customer rate is flat all-in
You, in full; indexed plans spike with the market
You, hedged by your contracts
What an event looks like
Short planned dip on extreme hours
Bill spike, or a manual race to unplug
Dispatched or price-driven site response
Program access
At site scale, managed for you
None at single-machine scale
Full stack, if you build the automation
What it takes
A hosting contract
Luck with the weather
MW scale, market registration, staff
Hosted column reflects our published model: flat all-in rates, sites with their own substations, 99.9% uptime positioning. Program access at home: ERCOT's load programs operate at facility scale; single residential machines participate only through aggregators where offered.

Two practical notes complete the picture. First, if you're running at home on a wholesale-indexed plan in a volatile market, curtailment discipline isn't optional: the afternoons that pay sites millions are the same afternoons that can erase a home miner's month, and the home electricity math deserves a look before summer. Second, the surplus-energy thesis scales down: old, inefficient hardware that can't pay commercial rates still makes sense on genuinely cheap or stranded power, which is exactly the fit we flag on our legacy product pages. If you'd rather see the hosted version with your own machine, the free 24-hour miner test runs on our production floor, and the hosting cost breakdown shows where a flat rate comes from.

The Bottom Line

Curtailment is what happens when a grid has more energy than it can move and less flexibility than it needs, and Bitcoin mining is the one industry that monetizes both halves of that sentence: it soaks up the terawatt-hours nobody can take, and it hands back megawatts in seconds when everybody wants them, getting paid at both ends. The numbers are no longer theoretical: tens of millions in annual credits at a single operator, net power costs pulled down by a fifth, and a Texas legislature now writing mining's flexibility playbook into law for every large load that follows. For anyone deciding where machines should live, the lesson is blunt: power strategy is half of mining profitability, it's played at site scale, and it's the game our ASIC miner hosting exists to play on your behalf. Run your own numbers at your own rate in the profitability calculator, and remember that the best-run fleets in the world are proud of the hours they didn't mine.

Frequently asked questions

What is curtailment in energy markets?
A deliberate reduction of electricity that could have flowed: either generation curtailment, where grid operators order wind and solar plants to reduce output because transmission is congested or supply exceeds demand, or load curtailment, where large consumers reduce their draw in response to prices, programs, or dispatch instructions. Both are responses to the same mismatch of power, place, and time.

What is Bitcoin mining curtailment?
A mining operation deliberately reducing or shutting its load, either because real-time power prices exceed what the fleet earns mining, to avoid peak-window transmission charges, because it's enrolled in grid reserve programs, or under emergency agreements. The fleet loses only the hashrate for the window and is compensated through avoided costs, credits, or program payments.

Why does Texas pay Bitcoin miners to turn off?
Because flexibility is worth money to a grid that must balance in real time. ERCOT runs an isolated system with volatile prices, record-breaking demand, and huge renewable swings; a load that can hand back hundreds of megawatts in seconds is cheaper and faster than building equivalent peaker capacity. Miners are the largest load class that can do it, which is why federal energy statistics describe ERCOT's voluntary curtailment agreements as primarily crypto mining facilities.

How much money do miners make from curtailment?
The documented reference case is Riot Platforms: about $71 million in credits in 2023 including a single August with $31.7 million against $8.9 million of mined Bitcoin, $56.7 million through 2025, and $21 million in Q1 2026, which pulled its net power cost to 3.0 cents/kWh. Results scale with megawatts, market, and how many program lanes an operator stacks; industry estimates for fully stacked participation run to $300,000 per MW-year at the high end.

What is 4CP in ERCOT?
Four Coincident Peak: ERCOT allocates transmission costs to large consumers based on their average load during the four highest 15-minute grid intervals of the summer, one per month from June through September, identified after the fact. A site's behavior in those four windows sets its wires bill for the following twelve months, with exposure around $50,000 to $67,000 per MW per year. Miners forecast candidate peaks and curtail through dozens of summer afternoons to make sure they're offline for the four that count.

What are RRS, ECRS, and Non-Spin?
ERCOT's main reserve products, which loads can be paid to provide. Responsive Reserve Service (RRS) requires automatic response in roughly 30 seconds and pays the highest capacity rates; ERCOT Contingency Reserve Service (ECRS), added in 2023, requires response within 10 minutes; Non-Spinning Reserve allows 30 minutes and is the easiest entry tier. Participants earn capacity payments for standing ready plus performance payments when dispatched, and fast-curtailing mining fleets can qualify across the stack.

Doesn't curtailment hurt Bitcoin production?
Less than intuition suggests, because the hours worth curtailing are few and extreme. The events cluster into a handful of peak afternoons and emergencies; the reference August saw a miner cut more than 95% of load during those peaks and still produce 333 BTC across the month. The economics decide it: when an hour's power is worth more than the Bitcoin it would mine, producing through it is the losing move.

What is Texas Senate Bill 6 and what changes in 2026?
SB 6, signed in June 2025, requires large transmission-voltage loads connecting after December 31, 2025 to have curtailment protocols so they can be shed in emergencies, directs ERCOT to competitively procure demand reductions from customers of 75 MW and up, and orders the Public Utility Commission to finish reviewing the 4CP transmission-cost methodology by December 31, 2026. A shift toward a 12-peak design is on the table, which would spread the peak-avoidance game across the whole year.

Does curtailment exist outside Texas?
Yes, wherever power is stranded, seasonal, or volatile. Alberta's market rewards curtailing off the price signal directly, Ontario and Quebec run capacity and interruptible-tariff programs, Great Britain curtails over a tenth of its wind, and behind-the-meter mining monetizes flared gas and hydro wet-season surpluses that never touch a program at all. Texas is simply the deepest and best-documented market.

Does curtailment affect me as a MillionMiner hosting customer?
Operationally, barely; financially, in your favor. Our customers pay a flat all-in rate, so power-price spikes stay on our side of the contract, and our US sites run their own substations with uptime managed to a 99.9% target. What a customer sees during a grid event is a brief, planned dip in hashrate on the year's most extreme hours, which are precisely the hours when mining through the price would have cost more than it earned.

Can a home miner get paid to curtail?
Not directly in most markets: ERCOT's load programs operate at facility scale with registration, telemetry, and response requirements a single machine can't meet, though aggregators are beginning to bundle small loads in some regions. What a home miner can do is run the economic-curtailment logic manually, especially on wholesale-indexed plans where a few spike afternoons can erase a month's margin. At machine-count scale, that discipline is a big part of what hosting buys.

Ready to Start Mining?

Free worldwide DDP shipping. Professional hosting from $0.055/kWh.

Alex Morgan

Written by

Alex Morgan

Head of Mining Operations

Alex has managed large-scale ASIC deployments since 2017 and specialises in profitability analysis, hosting optimisation, and hardware procurement strategy.