That is the honest way to read the H100 vs H200 vs B200 decision. Two of these share a chip and differ only in memory. The third is a genuine architecture jump that also changes what your data center has to look like. This guide breaks down the specs that matter, where each card wins, what they cost, and the one constraint most buyers forget to budget for.
The short version
- The H100 and H200 share the same Hopper die, so their compute is identical. The H200's only advantage is memory: 141 GB at 4.8 TB/s versus 80 GB at 3.35 TB/s.
- That memory is worth roughly 8 to 12 percent on training but 25 to 35 percent on memory-bound inference of 70B and larger models. For inference, the H200 is the clear pick of the two.
- The B200 is a new architecture (Blackwell), not a memory refresh: 192 GB, about 8 TB/s, native FP4, and roughly 4x the H100's training throughput.
- The catch is power and heat. H100 and H200 are air-coolable; the B200 needs liquid cooling and pushes racks past 120 kW. That facility jump is often the real deciding factor.
The three GPUs at a glance

H100 and H200: same chip, different memory
What NVIDIA changed is the memory. The H100 carries 80 GB of HBM3 at 3.35 TB/s. The H200 carries 141 GB of HBM3e at 4.8 TB/s, which is 1.76 times the capacity and about 1.4 times the bandwidth. Nothing else moved.
That single change matters enormously for one specific job: serving large models. Text generation is memory-bandwidth-bound, because the GPU has to read the entire model's weights for every token it produces. More bandwidth means more tokens per second, and more capacity means the model fits without spilling. NVIDIA reports the H200 delivering up to 1.9 times the H100's inference throughput on Llama 2 70B, and in practice you see 25 to 35 percent gains on memory-bound models in the 70B-and-up range. For training, where the bottleneck is usually compute rather than memory, the same hardware delivers a more modest 8 to 12 percent.
There is also a capacity cliff hiding in those numbers. A 70B model in FP16 needs roughly 140 GB of memory for its weights alone. That fits on a single H200 (141 GB) but not on a single H100 (80 GB), where you would need two cards and the interconnect overhead that comes with them. If your model lives in that band, the H200 is not a little faster, it is the difference between one GPU and two.
The B200 is a different animal
The specs that follow from that:
- Memory. 192 GB of HBM3e at roughly 8 TB/s. That is 2.4 times the H100's capacity and bandwidth, and it lets a single B200 hold models that needed two or three H100s.
- FP4 precision. Blackwell's fifth-generation Tensor Cores add native four-bit floating point. FP4 halves the memory footprint versus FP8 and, combined with the bandwidth, drives NVIDIA's headline claim of roughly 4 times the H100's inference throughput. A 70B model in FP4 shrinks to about 35 GB, which leaves most of the card free for context and batching.
- NVLink 5.0. 1.8 TB/s per GPU, double Hopper's 900 GB/s, which matters when you scale past a single card.
“The generational leap from H100 to B200 is the largest NVIDIA has shipped in the data center segment, and it is concentrated in exactly the three things that limit LLM inference: memory capacity, bandwidth, and low-precision throughput.”
· NVIDIA B200 platform analysis, 2026
Training versus inference: where each one wins
For inference, memory rules. Serving a model is bandwidth-bound, so the ranking is clean: B200 first by a wide margin, H200 second, H100 third. If you are running 70B or larger in production and care about cost per token, the B200's FP4 path is in a different class, and the H200 is the sensible Hopper-generation choice when 141 GB is enough and you want mature software.
For training, compute matters more and the gaps compress. The H100 and H200 train at the same speed because they share a die. The B200 delivers roughly 4 times the H100's training throughput on transformer models thanks to FP8 and FP4 mixed precision, so for large new training runs it is the clear choice, but a cost-sensitive training or HPC workload runs perfectly well on H100s that are cheaper and in stock. A common pattern in 2026 is a hybrid fleet: Blackwell for production inference where the throughput gain pays for itself, Hopper for training and background jobs.
Ready to Start Mining?
Free worldwide DDP shipping. Professional hosting from $0.055/kWh.
The cooling cliff nobody budgets for
The B200 draws 1,000 watts, a 43 percent jump, and that changes everything downstream. Dense B200 racks push well past what air can remove, and at rack-scale the GB200 NVL72 configuration lands at 120 kW or more and requires direct-to-chip liquid cooling with no air-only option. In practice that means a facility water loop, coolant distribution units, and floor loading most buildings were never designed for.
So the honest version of the B200 decision is not "can I afford the GPU." It is "can I afford the building the GPU needs." A B200 you cannot cool is slower than an H200 you can. For anyone deploying on premises, this is the line between a hardware upgrade and a construction project, which is exactly why so much Blackwell capacity gets consumed in the cloud or in facilities that already solved power and cooling.
What they cost: buy versus rent
Renting tells a cleaner story for most teams. In mid-2026, cloud H100s rent for roughly $2 to $3 per GPU-hour, H200s a step above, and B200s around $5 to $6 on demand, with spot rates dipping near $2. Because B200 hardware is backordered deep into the year, cloud access is often the only fast path to Blackwell at all. The rule of thumb: rent when your workload is bursty or you are still choosing hardware, and buy when utilization is high enough that owning beats the hourly meter, which for a well-used card is usually a matter of months.
So which one should you buy?

- How big is your model? Under 70B, the H100 is enough. At 70B in FP16 you need the H200's 141 GB or the B200's 192 GB to stay on one card. Above 100B at full precision, the B200 is the practical single-GPU option.
- Training or inference? Compute-bound training runs fine on H100 or H200. Memory-bound inference at scale is where the H200 and especially the B200 earn their premium.
- Can your site cool it? If you have air-cooled racks and no liquid loop, the realistic choice is H100 or H200. The B200 is only the right answer if you can supply liquid cooling and the power behind it.
Where MillionMiner fits
For the buyers who reach the cooling-and-power wall, that is the whole reason the power side of AI matters as much as the silicon. Securing cheap, energized, liquid-capable capacity is the constraint, and it is exactly what our turnkey sites are built to solve. The story of miners pivoting their power into AI compute is, underneath, the same lesson this comparison keeps returning to: the GPU is the easy part. Alternatively, you can skip the ops and host your GPU with us.
The bottom line
Match the GPU to the model, the workload, and the cooling you can actually supply, in that order. Do that and the H100-versus-H200-versus-B200 question answers itself. When you want to see the exact numbers for your shortlist, run them through the benchmark tool.
Frequently asked questions
The H100 and H200 share the same Hopper die and identical compute; the H200 only adds memory (141 GB HBM3e at 4.8 TB/s versus the H100's 80 GB HBM3 at 3.35 TB/s). The B200 is a new Blackwell architecture with 192 GB, about 8 TB/s bandwidth, native FP4 precision, and roughly 4x the H100's training throughput, but it needs liquid cooling.
Is the H200 faster than the H100?
Only for memory-bound work. Because they use the same die, the H100 and H200 are identical on compute-bound tasks like most training. For serving large models, the H200's extra bandwidth and capacity deliver up to 1.9x the inference throughput on 70B-class models, and roughly 25 to 35 percent in typical memory-bound cases.
Do the H100 and H200 have the same performance?
On compute they are identical, since both use the GH100 die with the same Tensor Cores and clocks. The H200's advantage is entirely memory: 141 GB versus 80 GB and 4.8 TB/s versus 3.35 TB/s. That matters for large-model inference and for fitting a 70B model on a single card, but not for compute-bound training.
Is the B200 worth it over the H200?
For high-volume inference and large new training runs, yes. The B200's FP4 support and 8 TB/s bandwidth can cut cost per token dramatically at scale, and its 192 GB holds models that need two H200s. But it draws 1,000 watts and requires liquid cooling, so if your site is air-cooled or your volume is modest, the H200 is often the better practical choice.
Which GPU is best for LLM inference?
For memory-bound LLM inference at scale, the B200 leads clearly thanks to FP4 and bandwidth, followed by the H200, then the H100. If 141 GB is enough for your model and you want the mature Hopper software stack, the H200 is the sensible pick; step up to the B200 for the lowest cost per token at volume or for models above 141 GB.
Which GPU is best for AI training?
The B200 delivers roughly 4x the H100's training throughput on transformer models and is the choice for large new runs. The H100 and H200 train at the same speed and remain strong, cost-effective options for smaller or budget-sensitive training. Many teams run a hybrid fleet: Blackwell for production inference, Hopper for training.
Does the B200 need liquid cooling?
In practice, yes. At 1,000 watts per GPU, dense B200 racks exceed what air cooling can handle, and the rack-scale GB200 NVL72 at 120 kW or more requires direct-to-chip liquid cooling with no air-only option. The H100 and H200 at 700 watts are designed to run on air in standard 20 to 45 kW racks.
How much VRAM do the H100, H200, and B200 have?
The H100 has 80 GB of HBM3, the H200 has 141 GB of HBM3e, and the B200 has 192 GB of HBM3e. For reference, a 70B model in FP16 needs about 140 GB, so it fits on a single H200 or B200 but not a single H100. The Blackwell Ultra B300 pushes capacity further to 288 GB.
How much do the H100, H200, and B200 cost in 2026?
New H100 and H200 cards run roughly $25,000 to $40,000 depending on form factor and volume, with used H100s trading lower. The B200 is around $30,000 to $40,000 new. Cloud rental runs about $2 to $3 per GPU-hour for the H100, a step higher for the H200, and roughly $5 to $6 on demand for the B200, with spot rates near $2.
Should I buy or rent these GPUs?
Rent when your workload is bursty, you are still choosing hardware, or you need Blackwell fast, since B200 stock is backordered. Buy when utilization is high enough that owning beats the hourly meter, which for a well-used card is usually a few months. On premises, factor in the cooling and power the card demands, especially for the liquid-cooled B200.
Sources and image credits
Specifications from NVIDIA H100, H200, and B200 product briefs; performance figures from NVIDIA and MLPerf Inference results; 2026 pricing from public cloud rate cards. Hero macrophotograph of an NVIDIA GPU die by Fritzchens Fritz (CC0) and GPU-cluster photograph by CSIRO (CC BY 3.0), both via Wikimedia Commons, cropped and graded for MillionMiner. Diagrams: original MillionMiner graphics.
Bitcoin Miner (BTC)
Dogecoin / Litecoin Miner (DOGE, LTC)
Zcash Miner (ZEC)
Kaspa Miner (KAS)
Ethereum Classic Miner (ETC)
Siacoin Miner (SC)
Monero Miner (XMR)
Other Asic Miners
Hydro Miners
Lottery Miners
Mining Containers
Racks & Cabinets
Hydro Radiators
GPU & Graphic Cards
AI Server
Storage