This guide is the buyer's math, end to end: real price bands by size and cooling with sources and dates, what “turnkey” actually includes and what it never does, how many machines genuinely fit, the full project bill that no listing itemizes, the shelf you can actually order from, and the honest fork between owning a container and hosting your fleet. We sell the mining containers and run the hosting halls, so we make money on both answers, which is exactly why we can draw the fork straight.
The short answer
- Prices, August 2026: 20ft air-cooled units start near $15,000; 40ft air units run $40,000-70,000; hydro and immersion builds run $112,000-300,000+. All figures are before miners, electrical service, and site work.
- Capacity: roughly 100-250 miners in a 20ft air unit, 250-600 in a 40ft, and 240-420 slots in hydro designs; the power feed, not the shelving, sets the real number.
- Turnkey means the box, not the site: PDUs, cooling, racks, and monitoring arrive installed; the transformer, utility switchgear, and every miner do not.
- The biggest cost isn't the container: filling a 40ft unit with current-generation hardware costs several times the box itself, and the power contract takes far longer than the delivery.
What Does a Mining Container Cost in 2026?
| Container type | Price band (before miners) | What the money buys |
|---|---|---|
| 20ft air-cooled | from ~$15,000 | Entry format; fan-wall cooling, ~100-250 miner slots |
| 40ft air-cooled | $40,000-70,000 | The workhorse; 250-600 slots, fitted PDUs and racks |
| Hydro container | from ~$112,000 | Water-loop cooling, 240-420 slots, quiet and dense |
| 40ft immersion | up to ~$300,000+ | Dielectric tanks, maximum density and overclock headroom |
| Multi-MW hydro (1.5-2.4 MW) | quote only | Farm-scale blocks; no published list prices in the market |
Two forces set where a given box lands in its band. First, cooling drives price more than size does: a 40ft immersion build can cost seven times a 20ft air unit that occupies half the footprint. Second, configuration depth: the difference between a shell with fans and a genuinely turnkey unit is tens of thousands of dollars of electrical fit-out, which is exactly the next section.
What Does a Turnkey Mining Container Include?

- The transformer and switchgear. The container expects site power at its rated voltage; stepping down from utility service, the switchgear between the two, and the trenching to reach the pad are your line items, and on greenfield sites they can rival the container's price.
- The miners. No vendor sells a loaded box as a list item; hardware is always its own quote. A 40ft unit's fleet costs several times the container, which is why the buying order is machines-then-box for most operators, not the reverse.
How Many Miners Fit in a Mining Container?

| Format | Typical capacity | Power class | Sizing reality check |
|---|---|---|---|
| 20ft air | 100-250 miners | ~200-700 kW | Feed ÷ 3.6 kW per modern unit |
| 40ft air | 250-600 miners | ~0.8-1.5 MW | Fan wall must match summer heat |
| Hydro | 240-420 slots | ~1-1.5 MW | Slots sized for hydro-plate units |
| Our MM / Antspace shelf | 100-160+ ASICs per box | 200 kW-1.5 MW | Rated per listing, not per brochure |
What's the Real Total for a Container Project?

- The fleet dominates. Whether you fill a box with Bitcoin miners or Scrypt hardware, hardware is the largest line by multiples, and it's also the most timing-sensitive one; our analysis of the best time to buy a Bitcoin miner covers how machine prices lag coin rallies.
- Electrical is the wildcard. On a site with existing MW-scale service, it's switchgear and cable. On a greenfield site it's a transformer, a utility application, and the project's real schedule: interconnection queues run months to years while the box ships in weeks, which is the single most underrated fact in container buying.
- Site and logistics are the small print. A concrete pad, permits, fencing, a crane day, and freight; buying DDP with duties and taxes paid, as everything on our shelf ships, removes the one line here that likes to surprise importers.
Ready to Start Mining?
Free worldwide DDP shipping. Professional hosting from $0.055/kWh.
Air, Hydro, or Immersion: Which Container Type Should You Buy?

Which Mining Containers Can You Actually Buy?
- Bitmain Antspace hydro family: the Antspace HD5 is the 1.5 MW farm-scale flagship, with the Antspace HK3 as the established mid-size hydro block.
- More Antspace configurations: the Antspace HW5 rounds out the hydro range for staged buildouts, with HW7-class units listed alongside it on the category page.
- Bitmain Antbox, the mobile air option: the Antbox N5 packs 658 kW into a 20HQ outdoor-rated box: the fastest way to put ~180 modern machines behind a fence.
- The MM line, air-cooled: the MM Hash Hub 189 and MM PowerBox 216 carry their miner counts in their names: rated capacity per listing, not brochure math.
- The MM line, hydro: the MM Hydro Vault 210 is our water-cooled answer at the same discipline, sized for hydro-plate fleets.
Should You Buy a Container or Host Your Miners?

The middle path is more popular than either extreme: buy the machines, host them, and keep the container option open for the day a power deal lands. It's also the only path you can rehearse for free: the free 24-hour miner test shows you hosted economics end to end, and the profitability calculator lets you run the same fleet at your projected container power rate versus a hosted rate before any steel gets ordered.
Operators weighing shared facilities against their own box should also read our colocation breakdown, which is the same decision one rung up the infrastructure ladder.
The Bottom Line
Frequently asked questions
Between about $15,000 and $300,000+ in August 2026, before miners: 20ft air-cooled units start near $15,000, 40ft air units run $40,000-70,000, hydro builds start around $112,000, and 40ft immersion units reach $300,000+. Multi-megawatt hydro blocks sell by quote only. Cooling type drives the spread more than container size, and prices move with the mining market.
How many miners fit in a mining container?
Roughly 100-250 ASIC miners in a 20ft air-cooled container, 250-600 in a 40ft, and 240-420 slots in hydro designs. The real number is the power feed divided by per-machine draw: a 658 kW box runs about 180 modern 3.6 kW machines regardless of how many shelves it has. Slot counts above the wall math are shelving, not capacity.
Should I buy a 20ft or 40ft mining container?
Size to your power, not your ambition: a 20ft unit fits sites with a few hundred kW of service and is easier to permit, place, and move; a 40ft unit needs roughly 0.8-1.5 MW to earn its price. Since the fleet inside costs several times either box, the container size that matches your secured power contract is the right one; buying capacity you can't energize parks capital in steel.
What does a turnkey mining container include?
Five installed systems: the insulated shell, breaker panels and PDUs wired to every shelf, the cooling plant (fan wall or hydro loop), purpose-built miner racking, and network plus monitoring. It excludes the transformer and utility switchgear on most spec sheets, and always excludes the miners. Turnkey describes the box, not the site; read the exclusions before comparing prices.
Do mining containers come with miners included?
No. No vendor prices a miner-loaded container as a list item; hardware is always a separate line, sometimes bundled as its own quote. Budget the two together, because filling a 40ft unit with current-generation hardware costs several times the container itself, and the machine market moves independently of the container market.
What power does a mining container need?
From roughly 200 kW for small 20ft units to 1.5 MW+ for large hydro blocks, delivered at the container's rated voltage: the box arrives ready to receive that service, not to create it. The transformer, switchgear, and utility application are the buyer's scope, and new MW-scale interconnections routinely take months to years, far longer than the container's own lead time.
Air, hydro, or immersion: which container is best?
Air for cheap land, mild climates, and lowest entry cost; hydro for density, hot regions, and noise-limited sites, paired with hydro-plate miners; immersion for maximum density and overclock headroom where the operator already understands fluid handling. Cooling is the biggest price driver and the biggest siting constraint, so match it to the site rather than the brochure.
Is it cheaper to build a DIY mining container?
A self-converted shipping container can undercut turnkey pricing on paper, but the gap closes fast once electrical work is done to code: PDUs, breakers, balanced circuits, and a cooling wall that survives summer are exactly what you're paying vendors for. DIY makes sense for electricians running small fleets; at 40ft scale, failed cooling or a wiring fault costs more than the turnkey premium.
Where can I put a mining container?
On land you own or lease with the right zoning, a level pad, road access for a crane truck, and, decisively, available power: rural and industrial sites near substations are the standard answer. Noise carries in air-cooled deployments, so distance or hydro cooling handles neighbors. The site question is really the power question; solve the interconnect first and the location follows.
Are mining containers profitable in 2026?
The container is infrastructure, so its return is your mining margin minus the infrastructure's amortization: profitable when your power rate beats hosted rates by enough to repay the box, electrical work, and site within your horizon. At today's economics that math favors operators with sub-market power at MW scale; run your fleet through a profitability calculator at your real power rate before ordering steel.
How are mining containers shipped?
As standard container freight: by sea, rail, and truck, offloaded by crane onto your pad, which is why road access matters in siting. The variable that bites importers is customs: duties and taxes on a five or six-figure box are a real line item. Everything on our shelf ships DDP with duties and import taxes paid, so the quoted price is the landed price.
Bitcoin Miner (BTC)
Dogecoin / Litecoin Miner (DOGE, LTC)
Zcash Miner (ZEC)
Kaspa Miner (KAS)
Ethereum Classic Miner (ETC)
Siacoin Miner (SC)
Monero Miner (XMR)
Other Asic Miners
Hydro Miners
Lottery Miners
Mining Containers
Racks & Cabinets
Hydro Radiators
GPU & Graphic Cards
AI Server
Storage