If you own, rent, or plan to buy AI GPUs, Rubin matters to you even if you never touch one, because every NVIDIA launch reprices the entire stack beneath it. This explainer covers what Rubin actually is, the confirmed specs versus the marketing claims, the real shipping timeline through 2028, and the question that matters most to buyers: what this launch does to the price of the H100, H200, and B200 you can actually get.
The short answer
- What it is: Rubin is NVIDIA's next GPU platform, succeeding Blackwell: a 336-billion-transistor GPU on TSMC 3nm with 288 GB of HBM4 memory at 22 TB/s, paired with the new Vera CPU.
- The headline claims: 5x inference and 3.5x training versus Blackwell, 8x inference performance per watt, and token costs around one-tenth on agentic and MoE workloads. NVIDIA's numbers, not yet independent ones.
- When: full production now, partner and cloud availability in H2 2026, the CPX inference rack by end of 2026, Rubin Ultra in 2027, Feynman in 2028.
- For buyers: first allocation goes to hyperscalers. The practical effect in 2026 is downward price pressure on Blackwell and Hopper, which is where most real purchasing decisions live.
What is NVIDIA Rubin?
The GPU is a dual-die design, two reticle-sized dies on one package, fabbed on TSMC's 3nm process and carrying 336 billion transistors, 1.6 times Blackwell's count. It targets what NVIDIA calls the agentic era: workloads where inference dominates and cost per token decides what is commercially viable. That framing matters, because the biggest gains Rubin claims are precisely on inference economics, the number that decides whether an AI product makes money.
How fast is Rubin? The specs versus Blackwell

The claims worth remembering, with their labels on: 5x inference and 3.5x training versus Blackwell; 8x inference performance per watt; token costs cut to roughly one-tenth on agentic and mixture-of-experts work; MoE training with a quarter of the GPUs. NVIDIA's Blackwell-era claims of “up to 30x” taught the industry to wait for real-world numbers, which typically land well below the peak marketing figure while still being generationally decisive. Treat Rubin's the same way. Notably, NVIDIA has not yet disclosed the chip's power draw, which is the number every facility planner is waiting for.
When does Rubin actually ship? The timeline

Then the cadence continues: Rubin Ultra in H2 2027 as the Kyber NVL576 rack drawing up to 600 kW, and the Feynman architecture in 2028. Two things stand out in that sequence. First, the 18-month rhythm is now policy, which means whatever you buy is two steps from the flagship within three years, and pricing behaves accordingly. Second, the power curve keeps climbing: 600 kW racks make today's 120 to 140 kW AI data center designs look conservative, and they harden the industry's real constraint, secured power, into the whole game.
What does a Rubin rack look like?

Ready to Start Mining?
Free worldwide DDP shipping. Professional hosting from $0.055/kWh.
What does Rubin do to GPU prices?

The honest counterweight: this cascade is a pattern, not a law. AI demand has repeatedly outrun supply, and when it does, last-generation prices fall slower than the roadmap suggests. Watch actual market rates on the cards you can buy today, benchmark them against your real workload, and let cost per finished job, not the news cycle, make the call.
Should you wait for Rubin or buy now?
And for everyone in between, the same economics as ever apply: sustained utilization favors owning over renting, and owning favors professional power and cooling over a hot closet. That is the GPU hosting logic, it is unchanged by Rubin, and if anything the 600 kW trajectory strengthens it. Owners of current-gen cards can also offset the depreciation cycle by keeping utilization high, including pointing idle capacity at DePIN compute networks between jobs.
What we do not know yet
The bottom line
Frequently asked questions
Rubin is NVIDIA's next-generation data-center AI platform, the successor to Blackwell, named after astronomer Vera Rubin. It pairs a new dual-die GPU (336 billion transistors on TSMC 3nm with 288 GB of HBM4 memory) with the Arm-based Vera CPU and four supporting networking chips. NVIDIA positions it for the agentic AI era, where inference volume and cost per token decide commercial viability.
When does NVIDIA Rubin come out?
It is in full production now, announced at CES 2026 and reconfirmed at GTC Taipei in June. Partner systems and cloud availability arrive in the second half of 2026 through the major hyperscalers and specialized GPU clouds. The NVL144 CPX inference rack follows by the end of 2026, Rubin Ultra in the second half of 2027, and the Feynman architecture in 2028. First allocations go overwhelmingly to hyperscalers and frontier AI labs.
How much faster is Rubin than Blackwell?
Per NVIDIA's claims: 5x inference performance, 3.5x training performance, 8x inference performance per watt, and roughly one-tenth the token cost on agentic and mixture-of-experts workloads, with MoE training needing a quarter of the GPUs. These are the manufacturer's numbers on chosen workloads, not independent benchmarks; real-world results historically land below peak marketing figures while remaining generationally significant.
What is HBM4 and why does it matter?
HBM4 is the next generation of high-bandwidth memory, and it is Rubin's most important upgrade. Each GPU carries 288 GB at 22 TB/s, nearly triple Blackwell's HBM3e bandwidth, achieved by doubling the bus width per stack. Modern AI workloads are increasingly memory-bound, so feeding the cores, not raw compute, is the bottleneck. HBM4 is what lets Rubin serve larger models faster from a single GPU.
What is the Vera CPU?
Vera is NVIDIA's new Arm-based data-center CPU, the successor to Grace, roughly twice as fast, and connected to Rubin GPUs over NVLink-C2C. A standard node pairs one Vera with two Rubin GPUs. Vera also completes NVIDIA's rack-scale confidential computing story, allowing an entire encrypted rack rather than just an encrypted GPU.
What is the Vera Rubin NVL72?
NVIDIA's flagship Rubin rack: 72 Rubin GPUs and 36 Vera CPUs joined by NVLink 6 into one machine with 260 TB/s of aggregate bandwidth. It is fully liquid-cooled with cable-free modular trays that cut installation from about two hours to minutes. A specialized variant, the NVL144 CPX, adds GDDR7-based CPX processors for million-token context inference, with 100 TB of fast memory per rack.
What is Rubin Ultra?
The mid-cycle refresh scheduled for the second half of 2027, deployed as the Kyber NVL576 rack, which packs 576 GPU dies and draws up to 600 kW per rack. That power figure is the headline: it is over four times today's GB200-class racks and confirms that facility power and cooling, not chip supply, are becoming the binding constraint on AI deployment.
Will Rubin make H100 and B200 prices drop?
The historical pattern says yes, gradually. Every NVIDIA launch pushes prior generations down a price tier: B200's flagship premium compresses, H100 and H200 drift toward value territory (H100 cloud rates were already sliding as B200 supply grew), and the A100 floor moves lower. The honest caveat: when AI demand outruns supply, last-generation prices fall slower than the roadmap suggests, so verify live market rates rather than assuming the discount.
Should I wait for Rubin or buy a GPU now?
If you need compute now, buy now: Rubin allocation in 2026 goes to hyperscalers, and waiting for hardware you cannot get has a real cost in shipped work, while current-generation cards are proven and getting cheaper. If you are planning fleet-scale capacity for 2027 and beyond, pilot Rubin when access opens and make vendors prove the claimed multipliers on your own workload before committing. For everyone between, cost per finished job at your real utilization remains the deciding number.
How much will NVIDIA Rubin cost?
Officially unannounced. Anyone quoting a confident Rubin price list is guessing. Reasonable expectations from the Blackwell precedent: a launch premium at the top of the market, sold primarily as full racks and cloud capacity rather than single cards, with meaningful availability outside hyperscalers not arriving until 2027. For 2026 buying decisions, the practical numbers are the falling prices of the current lineup, not Rubin's future sticker.
What comes after Rubin?
Rubin Ultra in the second half of 2027, then the Feynman architecture in 2028, paired with the Rosa CPU into 2029 and beyond. NVIDIA has settled into a roughly 18-month major-architecture cadence, which means any card you buy sits two steps behind the flagship within about three years, and smart purchasing prices that depreciation in from day one.
Sources and notes
Specifications and timeline from NVIDIA disclosures at CES 2026, GTC 2026, and Computex 2026, as reported by data-center and semiconductor press. Performance multipliers are NVIDIA claims on selected workloads, not independent benchmarks, and are labeled as claims throughout. Power draw and pricing were undisclosed at publication. Price-cascade analysis is a pattern-based outlook, not a guarantee; verify live market rates before purchasing. Hero image: DrHughManning, CC BY-SA 4.0; body photo: Windell Oskay, CC BY 2.0, both via Wikimedia Commons. Diagrams: original MillionMiner graphics. Informational content, not financial advice.
Bitcoin Miner (BTC)
Dogecoin / Litecoin Miner (DOGE, LTC)
Zcash Miner (ZEC)
Kaspa Miner (KAS)
Ethereum Classic Miner (ETC)
Siacoin Miner (SC)
Monero Miner (XMR)
Other Asic Miners
Hydro Miners
Lottery Miners
Mining Containers
Racks & Cabinets
Hydro Radiators
GPU & Graphic Cards
AI Server
Storage