In Stock

Bitmain

Antminer S21 XP HYDRO (473Th)

Model: Antminer S21 XP HYDRO

New

473 TH/s SHA-256 hydro-cooled Bitcoin miner from Bitmain. 5,676W at 12 J/TH efficiency, released October-November 2024. The single-phase universal voltage hydro variant in Bitmain's lineup, distinguished from the three-phase S21 XP+ Hyd 500 TH and S23 Hydro variants. Runs on standard 100 to 240V single-phase circuits (220V+ practical minimum at 25.8 amps continuous draw). Compact 410 x 170 x 209 mm at 13.8 kg net weight. Hydro cooled with closed-loop water circulation at 40 dB (zero internal fans, noise comes from external cooling infrastructure only). Ethernet connectivity. 5 to 45 degrees Celsius operating range. 5 to 95 percent humidity tolerance. 365-day Bitmain factory warranty. The lowest acquisition cost hydro variant in Bitmain's current lineup. Profitable across all realistic deployment scenarios with break even at approximately $0.133 per kWh under current Bitcoin network conditions. Ships with PSU, power cables, quick start guide, and free DDP worldwide delivery from MillionMiner.

473 TH/s 5676W SHA-256 12 J/TH

Select Availability

Quantity

Total Price

$6,899.00

Buying 10 or more? Get custom bulk pricing

Pay with: Bank Transfer | BTC | ETH | USDT

Genuine

Tested hardware

Worldwide

Global shipping

Support

Mining experts

Hashrate

473 TH/s

Power

5676 W

Efficiency

12.00 J/TH

Noise

40 dB

Estimated Mining Returns

Based on current BTC price & network difficulty. Indicative only.

Period Daily Weekly Monthly
Income
$44.65 $312.55 $1,339.50
Electricity
-$10.90 -$76.30 -$327.00
Profit
$33.76 $236.32 $1,012.80

Using 0.080 $/kWh · Network difficulty as of today. Estimates only.

Adjust rate in the bar above

Updated daily. Last refresh: May 10, 2026. Estimates at $0.08/kWh.

Full Specifications

Hashrate 473 TH/s
Power Consumption 5676 W
Efficiency 12.00 J/TH
Algorithm SHA-256
Model Antminer S21 XP HYDRO
Release Year Jun 2024
Noise Level 40 dB
Dimensions 410 x 170 x 209mm
Weight 13.8 kg
Voltage 100-240V
Interfaces Ethernet
Operating Temp 5 - 45 °C
Humidity 5 - 95 %
Cooling Type Hydro

What's in the Box

Antminer S21 XP HYDRO
Power supply unit (PSU)
Power cables
Quick start guide

Contents may vary by batch. Exact items listed in order confirmation.

Quick Setup

1

Connect PSU to miner and plug into the outlet

2

Connect ethernet cable to your router or switch

3

Find miner IP via router admin or IP scanner tool

4

Open web interface, enter pool URL and wallet — start mining

Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.

Product Details

Bitmain Antminer S21 XP HYDRO 473 TH/s SHA-256 Single-Phase Hydro-Cooled Bitcoin ASIC Miner: The 2024 Universal Voltage Hydro Variant of Bitmain's Lineup With 12 J/TH Efficiency, 100-240V Single-Phase Compatibility, and Lowest Hydro Acquisition Cost

The Bitmain Antminer S21 XP Hydro produces 473 TH/s of SHA-256 hashrate at 5,676W wall draw and 12 J/TH efficiency for mining Bitcoin (BTC), Bitcoin Cash (BCH), and Bitcoin SV (BSV). Released October-November 2024 as the single-phase universal voltage hydro variant of Bitmain's current S21 lineup. ±3 percent hashrate and ±5 percent power tolerance per Bitmain documentation. Hydro cooled with closed-loop water circulation at 40 dB (zero internal fans, all noise from external cooling infrastructure). 100 to 240V single-phase AC input via included PSU. Compact 410 x 170 x 209 mm dimensions at 13.8 kg net weight. Ethernet connectivity. 5 to 45 degrees Celsius operating range. 5 to 95 percent humidity tolerance. Coolant flow rate 8.0 to 10.0 liters per minute, pressure ≤3.5 bar, recommended pH 8.5 to 9.5. 365-day Bitmain factory warranty. The single-phase advantage in Bitmain's hydro lineup. Bitmain's other current hydro models require 380V+ three-phase industrial power: the S21 XP+ Hyd 500 TH, the S23 Hydro 580 TH, the S23 Hyd 3U 1,160 TH, and the S21e XP Hydro 860 TH all need three-phase electrical service. The S21 XP Hydro runs on standard single-phase circuits available worldwide in homes, offices, and small commercial spaces. At 220V draws approximately 25.8 amps continuous, requiring a dedicated 30 amp circuit per unit. At 240V draws approximately 23.7 amps. At 110V the unit draws 51.6 amps which exceeds practical residential circuit capacity, so 220V+ is the realistic minimum for deployment. For facilities with hydro cooling infrastructure but only single-phase electrical service, the S21 XP Hydro is the highest output Bitmain hydro option available. The hydro lineup positioning. The S21 XP Hydro at 12 J/TH sits between the air-cooled S21 XP (13.5 J/TH) and the S23 Hydro (9.5 J/TH) on the efficiency spectrum, and is the cheapest hydro option in Bitmain's current lineup at $6,899 acquisition cost. Versus the S21 XP+ Hyd 500 TH ($9,500): 5 percent less hashrate at 9 percent worse efficiency, but at meaningfully lower acquisition cost and with single-phase compatibility (the XP+ Hyd 500 TH variant requires three-phase). Versus the S23 Hydro 580 TH ($14,299): 18 percent less hashrate at 26 percent worse efficiency at less than half the acquisition cost. For operators wanting hydro cooling at minimum capital expenditure or wanting hydro deployment without three-phase electrical infrastructure investment, the S21 XP Hydro is the entry point. Current Bitcoin mining economics. At $0.08 per kWh retail commercial: $18.08 daily revenue, $10.90 daily electricity, +$7.18 daily profit, +$215 monthly, +$2,621 annually. At $0.05 per kWh industrial rate: approximately +$11.27 daily, +$338 monthly, +$4,114 annually. At $0.04 per kWh: approximately +$12.63 daily, +$379 monthly, +$4,610 annually. At $0.07 per kWh per Mining Now April 2026 data: +$8.18 daily, +$245 monthly, +$2,986 annually. At $0.10 per kWh higher commercial rate: approximately +$4.46 daily profit, +$1,628 annually. Break even electricity rate at current Bitcoin network conditions is approximately $0.133 per kWh. ROI windows approximately 18 to 32 months at industrial hosting electricity rates depending on BTC price trajectory. Hydro cooling infrastructure requirements. Closed-loop hydro cooling with internal cold plates bonded directly to hash board chips. External CDU circulating water, deionized water, or water-glycol antifreeze at 8.0 to 10.0 liters per minute flow rate, ≤3.5 bar pressure, recommended liquid pH 8.5 to 9.5. External heat rejection via dry cooler or cooling tower sized at 5.7+ kW per unit thermal load. Zero internal fans means the unit itself is essentially silent; the 40 dB noise rating comes from external cooling infrastructure (pumps, radiators, dry coolers) which can be located away from working spaces for additional acoustic isolation. Bitmain firmware and warranty context. Standard Antminer firmware with web-based pool configuration, real-time hashrate monitoring, and operational alerting. BraiinsOS+ third-party firmware compatibility for autotuning and advanced monitoring with typically 2 to 5 percent additional efficiency improvements. 365-day Bitmain factory warranty per CryptoMinerBros and BT-Miners documentation. Ships from MillionMiner with miner, PSU, power cables, quick start guide, 365-day Bitmain factory warranty, and free DDP worldwide delivery covering all customs clearance, import duties, and taxes.

Bitmain Antminer S21 XP Hydro 473 TH/s: The Single-Phase Universal Voltage

The Bitmain Antminer S21 XP Hydro produces 473 TH/s of SHA-256 hashrate at 5,676W and
12 J/TH efficiency for mining Bitcoin (BTC). Released October-November 2024. The
single-phase universal voltage hydro variant in Bitmain's lineup, distinguished from the
three-phase variants (S21 XP+ Hyd 500 TH, S23 Hydro 580 TH). The single-phase advantage. Bitmain's other current hydro models (S21 XP+ Hyd 500 TH, S23
Hydro 580 TH, S23 Hyd 3U 1,160 TH) require 380V+ three-phase industrial power. The S21 XP
Hydro runs on standard single-phase circuits available in homes, offices, and small commercial
spaces. At 220V draws approximately 25.8 amps requiring a dedicated 30 amp circuit. At 110V
draws 51.6 amps (impractical), so 220V+ is the realistic minimum. For facilities with hydro
cooling infrastructure but only single-phase power, this is the highest output Bitmain hydro
option available. The hydro lineup positioning. The S21 XP Hydro at 12 J/TH sits between the air-cooled S21 XP
(13.5 J/TH) and the S23 Hydro (9.5 J/TH) in efficiency, and is the cheapest hydro option in
Bitmain's current lineup ($6,899). Versus the S21 XP+ Hyd 500 TH ($9,500): 5 percent less
hashrate at 9 percent worse efficiency, but at meaningfully lower acquisition cost and with
single-phase compatibility. Current Bitcoin economics. At $0.08 per kWh: $18.08 daily revenue, $10.90 daily electricity,
+$7.18 daily profit, +$2,621 annually. At $0.05 per kWh industrial rate: approximately +$11.27
daily, +$4,114 annually. At $0.04 per kWh: approximately +$12.63 daily, +$4,610 annually. At
$0.07 per kWh per Mining Now April 2026 data: +$8.18 daily, +$2,986 annually. Break even at
approximately $0.133 per kWh. Deployment requirements. 100 to 240V single-phase AC input via included PSU, 220V+
practical minimum at 25.8 amps continuous draw. Closed-loop hydro cooling with external CDU
and dry cooler heat rejection sized at 5.7+ kW per unit. Zero internal fans means all noise
comes from external cooling infrastructure, which can be located away from working spaces. 410 x 170 x 209 mm at 13.8 kg net weight (12.8 kg per some distributors). Hydro cooled at 40
dB. Ethernet connectivity. 5 to 45 degrees Celsius operating range. 5 to 95 percent humidity
tolerance. Coolant flow rate 8.0 to 10.0 liters per minute, ≤3.5 bar pressure, pH 8.5 to 9.5.
365-day Bitmain factory warranty. Mines Bitcoin (BTC), Bitcoin Cash (BCH), Bitcoin SV (BSV).

Need Help Choosing?

Our mining specialists can help you find the perfect miner for your setup and budget.

Bitmain Antminer S21 XP Hydro 473 TH/s SHA-256 Single-Phase Hydro Bitcoin

Bitmain's single-phase universal voltage hydro variant. 473 TH/s SHA-256
at 5,676W and 12 J/TH efficiency, released October-November 2024. Distinguished from the
three-phase S21 XP+ Hyd 500 TH and S23 Hydro variants by single-phase 100 to 240V
compatibility. 220V+ practical minimum at 25.8 amps continuous draw. 410 x 170 x 209 mm at
13.8 kg. Hydro cooled at 40 dB with zero internal fans (all noise from external cooling
infrastructure). Ethernet connectivity. 5 to 45 degrees Celsius operating range. 365-day Bitmain
factory warranty. The lowest acquisition cost hydro variant in Bitmain's current lineup, ideal for
operators wanting water-cooled mining returns without three-phase electrical infrastructure
investment. Profitable across all realistic deployment scenarios with break even at
approximately $0.133 per kWh under current Bitcoin network conditions. Ships with PSU,
cables, quick start guide, and free DDP worldwide from MillionMiner.

Single-Phase Universal Voltage at 473 TH/s

The only Bitmain hydro miner above 400 TH/s that runs on standard 100 to 240V single-phase power. 220V+ practical at 25.8 amps continuous.

Lowest Acquisition Cost Hydro Variant in Bitmain's Lineup

The cheapest entry into hydro-cooled Bitcoin mining from Bitmain. Faster ROI per dollar invested than higher-efficiency variants at current network conditions.

40 dB With Zero Internal Fans

Miner itself is essentially silent. All noise comes from external cooling infrastructure that can be located away from working spaces for further isolation.

Request a Bitcoin Miner Hosting Quote

4.7
star star star star star

4.7/5 Verified on Trustpilot

  • envelope 30,000+ miners hosted since 2020
  • timer Trusted by 1,200+ customers globally
iso made-in-germany trustpilot
google-review

Need a Hosting Offer?

Tell us what you need and our team will send you a customized ASIC miner hosting quote

miner

Miner

hosting

Hosting

FAQ

Frequently Asked Questions

473 TH/s SHA-256 at 5,676W and 12 J/TH efficiency. ±3 percent hashrate and ±5 percent power tolerance per Bitmain documentation. The single-phase universal voltage hydro variant in Bitmain's S21 lineup, released October-November 2024.

The S23 Hydro at 580 TH and 5,510W (9.5 J/TH) delivers 23 percent more hashrate at 26 percent better efficiency, but requires three-phase 380-415V electrical service and costs more than 2x the S21 XP Hydro acquisition price ($14,299 vs $6,899). For single-phase deployment or minimum hydro acquisition cost, the S21 XP Hydro wins.

The S21 XP+ Hyd 500 TH delivers 6 percent more hashrate at 9 percent better efficiency, but requires three-phase 380-415V electrical service and costs $2,601 more ($9,500 vs $6,899). For single-phase deployment or lower acquisition cost, the S21 XP Hydro 473 TH wins. For operators with three-phase service willing to step up acquisition cost, the XP+ Hyd 500 TH wins.

100 to 240V single-phase AC input via included PSU. 220V+ practical minimum at 25.8 amps continuous draw. At 110V draws 51.6 amps which exceeds standard residential circuit capacity. Standard 30 amp 220V circuit handles one unit. Compatible with US 220V commercial, European 230V, Asian 220V deployments without three-phase requirement.

Yes across all realistic deployment scenarios. At $0.08 per kWh: +$7.18 daily, +$2,621 annually. At $0.05 per kWh industrial rate: approximately +$11.27 daily, +$4,114 annually. At $0.04 per kWh: approximately +$12.63 daily, +$4,610 annually. Break even at approximately $0.133 per kWh. ROI 18 to 32 months at industrial electricity rates.

Closed-loop hydro cooling with external CDU circulating water/deionized water/water-glycol antifreeze at 8.0 to 10.0 L/min flow, ≤3.5 bar pressure, pH 8.5 to 9.5. External heat rejection via dry cooler sized at 5.7+ kW per unit. MillionMiner Equipment category includes Lianli radiators and CDU systems compatible with this deployment.

40 dB rated, but the miner itself has zero internal fans and is essentially silent. The 40 dB noise comes from external cooling infrastructure (pumps, radiators, dry coolers) which can be located in separate utility spaces away from working areas for additional acoustic isolation. Some distributor sources list 50 dB which reflects a more conservative full-system noise rating.

410 x 170 x 209 mm at 13.8 kg net weight (some distributors list 12.8 kg). Compact form factor compatible with standard 19-inch rack mounting and existing S21 hydro rack configurations. Single-person installation possible.

5 to 45 degrees Celsius operating range. Inlet water temperature should be controlled between 30-40°C for optimal performance. Storage temperature -20 to +70°C. Humidity tolerance 5 to 95 percent. Operating temperature maximum decreases by 1°C per 300m elevation above 900m.

Bitcoin (BTC) primarily on the SHA-256 algorithm. Also Bitcoin Cash (BCH), Bitcoin SV (BSV), Fractal Bitcoin (FB), eCash (XEC), and any SHA-256 derivative chain. Cannot mine non-SHA-256 algorithms.

Yes. Box contents include the Antminer S21 XP Hydro unit, PSU sized for the 5,676W rated load, power cables, and quick start guide.

Verify single-phase 220V+ circuit availability with 30 amp capacity. Connect hydro cooling supply and return hoses via quick-disconnect fittings to facility CDU. Connect single-phase power and Ethernet. Configure pool URL and BTC wallet via Antminer web interface. Hashrate stabilizes at approximately 473 TH/s within 15 to 20 minutes.

Possible with three caveats. First: 220V+ 30 amp dedicated circuit required (most US residential is 120V/15-20A; some homes have 240V 30A circuits for dryers/EV chargers). Second: hydro cooling infrastructure required (CDU, pumps, dry cooler) which is uncommon in residential settings. Third: ventilation for the cooling system heat rejection. For typical residential deployment without existing hydro infrastructure, the air-cooled S21 XP at 270 TH or S23 air-cooled at 318 TH are more practical choices.

Yes. MillionMiner hosting accepts S21 XP Hydro units at managed hydro-cooled facilities. At $0.05 per kWh: approximately +$11.27 daily profit per unit, +$4,114 annually. At $0.04 per kWh: approximately +$12.63 daily profit per unit, +$4,610 annually. Contact MillionMiner for current hosting rates.

365-day Bitmain factory warranty per CryptoMinerBros and BT-Miners documentation. Covers manufacturing defects under normal operating conditions. Tampering with warranty seal, exceeding rated voltage, or improper coolant chemistry voids coverage.

Quarterly coolant chemistry inspection (pH, conductivity, biological growth markers). Semi-annual coolant replacement or filtration. Annual hash board inspection. Continuous hashrate monitoring through Antminer web interface or BraiinsOS+ dashboard. Coolant pH should remain in 8.5-9.5 range.

Yes. BraiinsOS+ supports the Antminer S21 series including the S21 XP Hydro variant. Operators typically achieve 2 to 5 percent additional efficiency improvements over stock firmware. Vnish firmware also available. Third-party firmware may affect warranty coverage.

S21 XP Hydro 473 TH ($6,899, single-phase) for lowest acquisition cost or single-phase electrical service. S23 Hydro 580 TH ($14,299, three-phase) for current generation efficiency at 9.5 J/TH if you have three-phase service and budget. The S21 XP Hydro captures the value position; the S23 Hydro captures the efficiency leadership position.

Buy if you want hydro-cooled mining returns at minimum acquisition cost, you have hydro cooling infrastructure but only single-phase electrical service, you are starting a hydro mining facility and want to test infrastructure with the cheapest hydro option, or you have access to industrial hosting electricity for maximum profitability. Consider the S21 XP+ Hyd 500 TH or S23 Hydro for better efficiency if you have three-phase service. Avoid if you do not have any hydro cooling infrastructure (use the air-cooled S21 XP or S23 air-cooled instead).

Within the S21 hydro family: S21 XP+ Hyd 500 TH for higher efficiency three-phase variant, S21e XP Hydro 860 TH for higher hashrate 3U variant. S23 family: S23 Hydro at 580 TH for current generation efficiency, S23 air-cooled at 318 TH for non-hydro deployment. Equipment: Lianli hydro radiators and CDU systems, Mining Containers, Racks & Cabinets. Algorithm diversification: KS7 for Kaspa, L11 for Litecoin/Dogecoin, E11 for Ethereum Classic. MillionMiner ASIC hosting accepts S21 XP Hydro units.

Get a Quote