In Stock

Bitmain

Bitmain Antminer S19 XP+ Hydro (293TH)

Model: Antminer S19 XP+ Hydro

New

293 TH/s hydro cooled SHA-256 miner at 5,567W. 19.0 J/TH, 100 to 240V. Bitmain S19 XP+ Hydro with wide voltage compatibility. Ships from MillionMiner.

293 TH/s 5567W SHA-256 19 J/TH

Select Availability

Quantity

Total Price

$2,026.00

Buying 10 or more? Get custom bulk pricing

Pay with: Bank Transfer | BTC | ETH | USDT

Genuine

Tested hardware

Worldwide

Global shipping

Support

Mining experts

Hashrate

293 TH/s

Power

5567 W

Efficiency

19.00 J/TH

Noise

50 dB

Estimated Mining Returns

Based on current BTC price & network difficulty. Indicative only.

Period Daily Weekly Monthly
Income
$27.87 $195.09 $836.10
Electricity
-$10.69 -$74.83 -$320.70
Profit
$17.18 $120.26 $515.40

Using 0.080 $/kWh · Network difficulty as of today. Estimates only.

Adjust rate in the bar above

Updated daily. Last refresh: May 10, 2026. Estimates at $0.08/kWh.

Full Specifications

Hashrate 293 TH/s
Power Consumption 5567 W
Efficiency 19.00 J/TH
Algorithm SHA-256
Model Antminer S19 XP+ Hydro
Release Year Jan 2025
Noise Level 50 dB
Dimensions 410 x 170 x 209mm
Weight 13.5 kg
Voltage 100-240V
Interfaces Ethernet
Operating Temp 5 - 40 °C
Humidity 10 - 90 %
Cooling Type Hydro

What's in the Box

Antminer S19 XP+ Hydro
Power supply unit (PSU)
Power cables
Quick start guide

Contents may vary by batch. Exact items listed in order confirmation.

Quick Setup

1

Connect PSU to miner and plug into the outlet

2

Connect ethernet cable to your router or switch

3

Find miner IP via router admin or IP scanner tool

4

Open web interface, enter pool URL and wallet — start mining

Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.

Product Details

Bitmain Antminer S19 XP+ Hydro 293TH Hydro Cooled Bitcoin Miner with Wide Voltage Range

The Bitmain S19 XP+ Hydro at 293 TH/s occupies a unique position: compact hydro Bitcoin mining on universal voltage. At 13.5 kg and 410 x 170 x 209mm, one person can carry and install this unit. The larger S19 XP+ Hyd 3U at 586 TH/s weighs 50 kg and requires two people or equipment to handle. 100 to 240V universal input on a hydro miner remains one of the most valuable specifications in the market. Three phase upgrades run $10,000 to $50,000+. Every Bitmain hydro model from the S23 generation forward requires 380V+ three phase. The S19 XP+ generation may be the last window for single phase Bitmain hydro. Approximately 19.0 J/TH efficiency. The S23 Hyd at 9.5 J/TH is twice as efficient, but it cannot run on single phase power. For facilities that will never have three phase, comparing to the S23 is academic. The S19 XP+ Hydro is the option that actually works in your facility. 50 dB water cooled. Standard plumbing. No dielectric fluid. Bitmain Antminer firmware with the S19 generation's proven track record. Ethernet connectivity. 5 to 40 degrees Celsius. The S21 XP+ Hydro (358 and 395 TH/s) is a newer universal voltage hydro option at better efficiency. Compare pricing between the S19 XP+ and S21 XP+ generations. Both share the universal voltage advantage. Bitcoin, Bitcoin Cash, all SHA 256 coins. The S19 XP+ Hydro 293 TH/s is the lighter entry into Bitmain's universal voltage hydro family. For operators who want to test hydro mining on their existing single phase power before committing to larger units like the S21 XP+ (358 to 395 TH/s), the 293 TH/s model at lower per unit cost reduces trial risk. Start with one or two units, validate the water cooling infrastructure works in your facility, then scale up to the S21 XP+ generation if results justify expansion.

Antminer S19 XP+ Hydro 293TH Proven Hydro Bitcoin Miner

Compact S19 XP+ hydro. 293 TH/s at 5,567W on universal 100 to 240V. 13.5 kg at 410 x 170 x 209mm. One person handles it. The 586 TH/s 3U model weighs 50 kg.

Same universal voltage advantage as the larger model at a quarter the weight. Three phase upgrades cost $10,000 to $50,000+. This unit avoids that entirely.

S21 XP+ Hydro (358 to 395 TH/s) is a newer alternative at better efficiency with the same universal voltage. Compare pricing between generations. 50 dB. Bitmain firmware. Ethernet. 5 to 40 degrees. Last window for single phase Bitmain hydro before S23 generation dropped the capability.

Start small to validate. One or two S19 XP+ Hydro units test your water cooling infrastructure on single phase power at lower capital risk than jumping straight to larger models. If the setup proves stable, scale to S21 XP+ Hydro units for more hashrate per unit. Both generations share the universal voltage advantage.

Bitmain S19 generation has years of field deployment data. Known failure modes, well documented maintenance procedures, and broad community knowledge. The 293 TH/s model benefits from this operational maturity.

Need Help Choosing?

Our mining specialists can help you find the perfect miner for your setup and budget.

Antminer S19 XP+ Hydro 293TH BTC Miner

Bitmain S19 XP+ Hydro 293 TH/s. Compact hydro at 5,567W on 100 to 240V universal. 13.5 kg single person handling. 50 dB. Last window for single phase Bitmain hydro. S21 XP+ Hydro is newer alternative. Three phase saves $10,000 to $50,000+. Ethernet. Start small to validate hydro setup on single phase before scaling. S19 generation has years of field data and community knowledge. Lower trial risk than larger units.

293 TH/s Proven Hydro

S19 XP+ platform with extensive operational track record. Reliable hydro cooled Bitcoin mining at 100 to 240V.

Attractive Price Point

Proven reliability at a competitive price. Strong option for operations expanding hydro fleets without paying newest generation premiums.

Free DDP Worldwide

Ships from MillionMiner with Bitmain warranty and free DDP delivery.

Request a Bitcoin Miner Hosting Quote

4.7
star star star star star

4.7/5 Verified on Trustpilot

  • envelope 30,000+ miners hosted since 2020
  • timer Trusted by 1,200+ customers globally
iso made-in-germany trustpilot
google-review

Need a Hosting Offer?

Tell us what you need and our team will send you a customized ASIC miner hosting quote

miner

Miner

hosting

Hosting

FAQ

Frequently Asked Questions

293 TH/s of SHA-256 at 5,567W with hydro cooling. Part of the previous-generation S19 series but still capable.

The S23 Hydro delivers 580 TH/s at 9.5 J/TH — nearly 2x hashrate and significantly better efficiency. The S19 XP+ Hydro at ~19 J/TH is less efficient. For new deployments, the S21/S23 series offers better long-term value.

At very low electricity rates ($0.04-$0.05/kWh), yes. At $0.07/kWh, margins are thin. The S19 generation is being phased out in favor of more efficient S21/S23 hardware.

All SHA-256 coins: Bitcoin (BTC), Bitcoin Cash (BCH), BSV, eCash.

If acquiring at a deep discount, the S19 XP+ Hydro can be profitable at ultra-low electricity rates. For new investments, the S23 Hydro (9.5 J/TH) or S21 XP (13.5 J/TH) offer far better long-term returns.

Yes. Professional hosting from $0.055/kWh. Free DDP shipping worldwide.

Warranty varies by batch age. MillionMiner ships genuine Bitmain hardware.

Get a Quote