Bitmain

Bitmain Antspace HD5 Hydro Mining Container (1.5MW)

Model: Antspace HD5

Request Your Custom Container Quote

Tell us where you need delivery. Our specialist replies within 24 hours via email, WhatsApp, or call.

Why this product needs a custom quote

Mining containers ship worldwide as oversized industrial cargo. Final pricing depends on your delivery destination, power configuration, and on-site requirements. Submit the form below and our container specialist will reply within 24 hours with a complete quote including hardware, shipping, customs, and DDP delivery to your site.

How your container order works

1

Submit form

Tell us delivery country & site details

2

Get your quote

Complete pricing within 24 hours

3

Review with specialist

Discuss specs, customise setup

4

DDP delivery

Container shipped to your site

Genuine

Tested hardware

Worldwide

Global shipping

Support

Mining experts

Bitmain Antspace HD5: a 40-foot all-in-one mining container for up to 308 hydro-series Antminers (S19 Hydro, S21 Hydro, S23 Hydro) at 1,500 kW working power. Integrated EC2-DT dry cooling tower, factory-built power distribution, CCS/CE/UL certification. Turnkey infrastructure for large-scale Bitcoin mining deployment. Ships worldwide DDP from MillionMiner with full installation support.

At a Glance Live data · August 12, 2026
Best for

Industrial-scale farms deploying 200+ air-cooled ASICs.

ASIC miners
308 units
housed at full load
Total power
1,500 kW
continuous electrical load
Form factor
Custom
Standard
Cooling
Air
thermal management
Power input 380V–415V AC 50/60Hz
Availability Built-to-order · typical lead time 8–12 weeks · DDP worldwide
Capacity 1,500 kW
Units 308
Voltage 380V–415V

Full Specifications

Model Antspace HD5
Capacity 1.5MW
Units 308 ASIC Miners
Input Voltage 380V–415V AC 50/60Hz

Request a Bitcoin Miner Hosting Quote

Free quote, reply in 24h. No sales call.

4.4
star star star star star

4.7 / 5 on Trustpilot

Verified customer reviews

30,000+ miners delivered

Shipped worldwide since 2020

1,200+ customers globally

Trusted in 50+ countries

iso made-in-germany trustpilot
google-review

Get a Quote for the Bitmain Antspace HD5 Hydro Mining Container (1.5MW)

Pricing, lead time, and hosting options. Personal advice from our sales team.

Reply within 24h via email, WhatsApp, or call.

Product Details

Bitmain Antspace HD5 Hydro Mining Container (1.5MW): Full Specifications, Power Distribution, Dry Cooling Tower, and Deployment Guide for 308-Miner Bitcoin Operations

The Bitmain Antspace HD5 is purpose-built infrastructure for operators running hydro-cooled Antminers at industrial scale. It is a 40-foot ISO-format container that integrates miner mounting, power distribution, and liquid cooling connections into one certified, factory-tested unit, paired with a dedicated dry cooling tower for heat rejection. The design target is straightforward: take an operator from a power connection and a concrete pad to 308 operational hydro miners with the minimum possible on-site engineering. Capacity and compatible hardware. The HD5 houses up to 308 units of Bitmain's hydro-series Antminers, spanning the S19 Hydro, S21 Hydro, and the newer S23 Hydro. Miners mount on both sides of the container, with 140 to 154 units per side depending on the configured main pump frequency (41 Hz for 140-per-side, 45 Hz for 154-per-side). This flexibility lets operators tune the coolant flow rate, 67.2 m³/h or 73.9 m³/h respectively, to the specific miner model and density they are deploying. Power distribution and electrical specifications. The container's working power is 1,512 kW under normal load and up to 1,765 kW at maximum, with each miner drawing a rated 10A. The power distribution cabinet uses four main switches rated 1200A each, with a rated current of 700A×4. Input is 400V±5% at 50/60Hz, three-phase. The inlet copper cabling specification is substantial: each phase (L1, L2, L3) requires eight runs of 400kcMil (185mm²) single-core cable rated 600V or higher, with four runs each for neutral and protective earth. This is genuine utility-scale electrical infrastructure, and operators should plan transformer and switchgear provisioning accordingly. A single 3,750 kVA transformer supports two HD5 containers operating simultaneously. The EC2-DT dry cooling tower. Heat rejection is handled by a separate container-format dry cooler, the EC2-DT, matching the main container's 12,192 × 2,438 × 2,896 mm footprint. It dissipates the full 1,500 kW thermal load generated by the miners. At 30°C ambient temperature, it maintains outlet water temperature at 35°C±1°C, which is the inlet temperature the hydro miners need for stable operation. The tower consumes 80 kW or less for its own pumps and fans, uses only 2.1 m³ of coolant in the loop, and produces 75 dBA of noise measured at 15 metres. The dry-tower architecture is the defining cooling choice: unlike evaporative wet cooling towers, a dry cooler rejects heat through air-to-liquid heat exchange without consuming water through evaporation. This eliminates water sourcing, treatment, and blowdown management, which is a significant operational advantage in water-constrained or remote sites, at the trade-off of slightly higher ambient-temperature sensitivity than a wet system. Weights and logistics. The main container ships at 11 tonnes and reaches 17.2 tonnes operating weight once filled with miners and coolant. The dry cooling tower ships at 12 tonnes and operates at 13.5 tonnes. Both are standard 40-foot ISO dimensions, so they move on standard container transport, crane onto a prepared pad, and connect via DN100 (ISO 2852 PN16) coolant interfaces between the container and the cooling tower. Certification and compliance. The container structure carries China Classification Society (CCS) certification, the standard for shipping-container structural integrity. The full unit carries CE and UL marks. The electrical and control systems comply with NFPA 79:2021 (industrial machinery electrical standard), UL 508A:2018 R8.21 (industrial control panels), CSA C22.2 No.14-18 (Canadian industrial control equipment), ANSI/ISO 12100:2012 (machinery safety), and IEC 60204 Ed 5.1 2009 (electrical equipment of machines). Power distribution cabinets, PDUs, cables, switches, and network cabling are individually UL/CUL certified. Where the HD5 fits in a deployment. This is large-scale infrastructure. A fully populated HD5 running S21 Hydro miners represents over 100,000 TH/s of Bitcoin hashrate in a single container footprint. Operators choosing the HD5 over building fixed infrastructure gain speed (factory-tested unit versus months of construction), portability (the entire farm can relocate), lower per-unit land and cabling cost, and a single certified system rather than a patchwork of separately-permitted components. The container scales naturally: power one or two units per transformer, deploy multiples across a site, and expand by adding containers rather than rebuilding fixed plant. MillionMiner ships the Antspace HD5 worldwide DDP with duties and customs handled before delivery, and supports installation and commissioning. For operators who prefer not to host on their own site, MillionMiner operates hosting facilities across four US data centers.

Bitmain Antspace HD5 1.5MW Container: Turnkey Infrastructure for 308 Hydro Antminers

The Antspace HD5 solves the hardest problem in scaling a hydro mining operation: the supporting infrastructure. Hydro-series Antminers like the S21 Hydro and S23 Hydro deliver industry-leading efficiency, but they require a closed-loop liquid cooling circuit, high-amperage power distribution, and a heat rejection system. Building that from components means coordinating electricians, plumbers, HVAC engineers, and structural work across months. The HD5 ships it as one certified 40-foot unit.Inside the standard 12,196 × 2,438 × 2,896 mm container: mounting infrastructure for 308 hydro miners across two sides (140 to 154 per side depending on pump frequency), a complete power distribution cabinet rated at 1200A across four main switches, and the coolant manifolds that connect each miner to the central loop. Working power runs at 1,512 kW normal and up to 1,765 kW maximum, drawing 400V±5% at 50/60Hz.Heat rejection comes from the paired EC2-DT dry cooling tower, a separate container-format unit that dissipates the full 1,500 kW thermal load. At 30°C ambient it holds outlet water temperature at 35°C±1°C, drawing under 80 kW for its own operation and using just 2.1 m³ of coolant. The dry-tower design avoids the water consumption and treatment overhead of evaporative wet towers, which matters in arid deployment regions.Certification covers the full stack: China Classification Society (CCS) for the container structure, CE and UL marks, and compliance with NFPA 79:2021, UL 508A:2018, CSA C22.2 No.14-18, and IEC 60204 for the electrical and safety systems. One 3,750 kVA transformer supports two HD5 units running simultaneously.

Need Help Choosing?

Our mining specialists can help you find the perfect miner for your setup and budget.

Bitmain Antspace HD5 (1.5MW) Hydro Mining Container — 308 Miners

The Bitmain Antspace HD5 is a 40-foot turnkey mining container engineered for hydro-cooled Antminers. It houses up to 308 units of the S19 Hydro, S21 Hydro, or S23 Hydro at 1,500 kW working power, with an integrated EC2-DT dry cooling tower that holds outlet water at 35°C in 30°C ambient conditions. Factory-built power distribution (1200A×4 main switches), CCS/CE/UL certification, and full NFPA 79 and UL 508A safety compliance. One transformer at 3,750 kVA powers two HD5 units. Built for operators scaling from single-rack setups to industrial Bitcoin mining farms.

308 Hydro Miners in One 40ft Container

Houses up to 308 Antminer S19 Hydro, S21 Hydro, or S23 Hydro units across both sides. Turnkey infrastructure: power, cooling, and mounting in one certified unit.

EC2-DT Dry Cooling Tower, No Water Waste

Rejects the full 1,500 kW thermal load. Holds 35°C outlet water at 30°C ambient. Uses just 2.1 m³ coolant with no evaporative water consumption.

Utility-Scale Power, Fully Certified

1,512 kW normal to 1,765 kW max at 400V. CCS, CE, UL certified with NFPA 79 and UL 508A compliance. One 3,750 kVA transformer powers two units.

FAQ

Frequently Asked Questions

Up to 308 hydro-series Antminers, compatible with the S19 Hydro, S21 Hydro, and S23 Hydro. Miners mount on both sides of the container, with 140 to 154 units per side depending on the configured main pump frequency (41 Hz for 140 per side, 45 Hz for 154 per side).

The HD5 pairs with the EC2-DT dry cooling tower. It rejects heat through air-to-liquid heat exchange rather than water evaporation. The term "Hydro" in the product name refers to the hydro-series miners it cools, not a wet evaporative tower. The dry-tower design eliminates water sourcing, treatment, and blowdown overhead, which is valuable in water-constrained or remote sites.

Working power is 1,512 kW under normal load and up to 1,765 kW maximum. Input is 400V±5% three-phase at 50/60Hz. The power distribution cabinet uses four 1200A main switches with 700A×4 rated current. Inlet cabling requires eight runs of 400kcMil (185mm²) copper per phase. A single 3,750 kVA transformer supports two HD5 units simultaneously.

The main container is a standard 40-foot ISO unit at 12,196 × 2,438 × 2,896 mm, shipping at 11 tonnes and reaching 17.2 tonnes operating weight. The EC2-DT dry cooling tower matches at 12,192 × 2,438 × 2,896 mm, shipping at 12 tonnes and operating at 13.5 tonnes.

The container structure is certified by China Classification Society (CCS). The unit carries CE and UL marks. Electrical and safety systems comply with NFPA 79:2021, UL 508A:2018 R8.21, CSA C22.2 No.14-18, ANSI/ISO 12100:2012, and IEC 60204 Ed 5.1 2009. Power distribution cabinets, PDUs, cables, and switches are individually UL/CUL certified.

The dry cooling tower dissipates the full 1,500 kW thermal load. At 30°C ambient temperature it holds outlet water at 35°C±1°C, the inlet temperature hydro miners require. The tower draws 80 kW or less for its own operation, uses 2.1 m³ of coolant, and produces 75 dBA of noise at 15 metres.

Yes. The HD5 supports the S19 Hydro, S21 Hydro, and the newer S23 Hydro series. Because hydro miners share the same closed-loop coolant interface, the container accommodates the current and recent generations of Bitmain's water-cooled lineup. Confirm exact unit count for your specific model with MillionMiner, since power draw per miner affects the per-side density.

The container connects to the EC2-DT dry cooler via DN100 (ISO 2852 PN16) interfaces for the main coolant circuit, with a DN100 (GB/T 9122-2010 PN16) plate heat exchange interface inside the container. Coolant flow runs at 67.2 m³/h or 73.9 m³/h depending on the configured pump frequency and miner density.

Three advantages. Speed: the HD5 ships factory-tested and certified rather than requiring months of on-site electrical, plumbing, and structural construction. Portability: the entire operation can relocate by moving the containers. Cost: containerized deployment lowers per-unit land use, low-voltage cabling, and transport costs, and delivers one certified system instead of separately permitted components.

Yes. MillionMiner ships the Antspace HD5 worldwide DDP, with duties and customs handled before delivery, and supports installation and commissioning. For operators who prefer not to host on their own site, MillionMiner operates hosting facilities across four US data centers where containerized hydro infrastructure can be deployed.