Bitmain

Bitmain Antspace HW7 Hydro Mining Container

Model: Antspace HW7

Request Your Custom Container Quote

Tell us where you need delivery. Our specialist replies within 24 hours via email, WhatsApp, or call.

Why this product needs a custom quote

Mining containers ship worldwide as oversized industrial cargo. Final pricing depends on your delivery destination, power configuration, and on-site requirements. Submit the form below and our container specialist will reply within 24 hours with a complete quote including hardware, shipping, customs, and DDP delivery to your site.

How your container order works

1

Submit form

Tell us delivery country & site details

2

Get your quote

Complete pricing within 24 hours

3

Review with specialist

Discuss specs, customise setup

4

DDP delivery

Container shipped to your site

Genuine

Tested hardware

Worldwide

Global shipping

Support

Mining experts

Bitmain's next-generation 40-foot hydro-cooling container, delivering 2MW of cooling capacity for facility-scale deployment of the Antminer S21 Hydro series. Roughly double the envelope of the HW5, with a closed-loop hydro circuit and integrated cooling tower that drop a complete megawatt-class mining hall into a single container footprint. The manufacturer-integrated path: Bitmain's container engineered around Bitmain's hydro miners. Shipped and deployed worldwide by MillionMiner.

At a Glance Live data · July 17, 2026
Best for

Industrial-scale farms deploying 200+ high-density hydro-cooled ASICs.

ASIC miners
396 units
housed at full load
Total power
2,000 kW
continuous electrical load
Form factor
Custom
Standard
Cooling
Hydro
thermal management
Availability Built-to-order · typical lead time 8–12 weeks · DDP worldwide
Capacity 2,000 kW
Units 396

Full Specifications

Model Antspace HW7
Cooling Type Hydro
Capacity 2MW
Units 396 Hydro ASIC Miners
Temps -40°C to 50°C
PUE 1.031

Request a Bitcoin Miner Hosting Quote

Free quote, reply in 24h. No sales call.

4.4
star star star star star

4.7 / 5 on Trustpilot

Verified customer reviews

30,000+ miners delivered

Shipped worldwide since 2020

1,200+ customers globally

Trusted in 50+ countries

iso made-in-germany trustpilot
google-review

Get a Quote for the Bitmain Antspace HW7 Hydro Mining Container

Pricing, lead time, and hosting options. Personal advice from our sales team.

Reply within 24h via email, WhatsApp, or call.

Product Details

Bitmain Antspace HW7 Hydro Mining Container: The 2MW Architecture, the Manufacturer-Integrated Advantage, the Efficiency Case Against Air Cooling, and How It Fits a Facility-Scale Hydro Deployment

There are two ways to run hydro miners at scale. You can build cooling infrastructure into a facility and plumb miners into it, a capital project measured in months and permits, or you can take delivery of a container that already is the facility. Bitmain's Antspace line is the second path, and the HW7 is its current peak: a next-generation 40-foot hydro container rated at 2MW of cooling capacity, roughly doubling the 1.2MW HW5 it replaces and compressing a megawatt-class mining hall into a single delivered footprint. The 2MW architecture. The HW7 runs a closed-loop hydro circuit: coolant flows directly through the Antminer Hydro units, absorbs heat at the source, and rejects it through an integrated cooling tower that ships with the container as a stackable two-piece system. That is the entire reason hydro exists. By moving heat through liquid rather than air, the cooling overhead drops to the low single-digit percent of total power, where air-cooled containers lose ten to twenty-five percent to fan loads. On a 2MW deployment that difference is hundreds of kilowatts redirected from cooling waste to revenue-generating hashrate, every hour, for the life of the site. Liquid cooling also holds junction temperatures stable through summer peaks and winter cold starts, the thermal consistency that protects hardware across the continuous duty cycle mining demands. The manufacturer-integrated advantage. The HW7 is not a third-party container retrofitted to hold miners; it is Bitmain's container, engineered around Bitmain's Antminer S21 Hydro series, sold as one system. That integration is the practical argument for it. The coolant loop is matched to the miners' hydro plates, the power distribution is sized to their draw, and the warranty and support sit with a single manufacturer across the container and the hardware, rather than split between a container vendor and a miner vendor pointing at each other when something fails. For an operator deploying capital at the megawatt scale, single-vendor accountability is not a convenience, it is risk management. The deployment reality, stated honestly. A container of this class is industrial infrastructure, and the buyer should plan for it as such. It requires a prepared, load-rated foundation, three-phase industrial power at the scale 2MW implies, transformer and switchgear sized to the load, a crane for placement, and clearance around the cooling tower for airflow. None of that is hidden cost so much as the nature of facility-scale mining, and it is exactly where MillionMiner's role goes beyond shipping a box: deployment planning, electrical specification, climate-appropriate cooling-tower selection, and the option to host the unit in MillionMiner's own data centers for operators who would rather skip the site build entirely. The miner population scales with the model you choose against the 2MW envelope, and the precise configuration is confirmed for your deployment. Where it sits. Against the company's own 20-foot HK3 and the 1.2MW HW5, the HW7 is the density and capacity answer, the most cooling and the most miners Bitmain puts in a single Antspace container, for operators whose constraint is megawatts per footprint. Against building hydro infrastructure from scratch, it is the faster, manufacturer-warranted path to the same end. MillionMiner supplies it, plans the deployment, and ships worldwide, with hosting in its own facilities available for operators who want the power and the site handled for them.

Bitmain Antspace HW7: The Megawatt Leap in Manufacturer-Integrated Hydro

Every serious hydro mining operation reaches the same question: how do you scale the cooling without building a facility around it. Bitmain's answer is the Antspace line, a container that arrives as a finished mining hall, and the HW7 is its largest step yet, a next-generation 40-foot unit rated at 2MW of cooling capacity, roughly double the HW5 it succeeds. The architecture is closed-loop hydro. Coolant circulates directly through the Antminer Hydro units and rejects heat through an integrated cooling tower, the design that gives hydro its defining efficiency: cooling overhead in the low single-digit percent, against the ten to twenty-five percent that air-cooled containers surrender to fans. The result is more of every megawatt reaching the hashboards, quieter operation, and the thermal stability that extends hardware life across the brutal duty cycle of continuous mining. The strategic advantage is integration. The HW7 is engineered by the same manufacturer that builds the Antminer S21 Hydro series it houses, so the container, the power distribution, the coolant loop, and the miners are one validated system rather than a third-party box wrapped around someone else's hardware, with warranty and support aligned across the whole deployment. It ships as a complete unit with its cooling tower, sized for the S21 Hydro generation, and MillionMiner handles delivery and deployment worldwide. The exact miner count scales with the model you populate against the 2MW envelope, confirmed for your build.

Need Help Choosing?

Our mining specialists can help you find the perfect miner for your setup and budget.

Bitmain Antspace HW7: 2MW of Hydro in One 40-Foot Container

Hydro cooling solved the heat problem; the Antspace HW7 solves the scale problem. Bitmain's next-generation container packs 2MW of cooling capacity into a single 40-foot footprint, roughly twice the HW5, turning a complete megawatt-class hydro mining hall into one delivered, manufacturer-integrated unit. The closed-loop circuit and integrated cooling tower run the Antminer S21 Hydro series at the low single-digit cooling overhead hydro is known for, where air-cooled deployments lose ten to twenty-five percent of their power to fans. Because Bitmain builds both the container and the miners it houses, the deployment arrives warranty-aligned and engineered as one system. Shipped and deployed worldwide by MillionMiner.

2MW in One 40-Foot Container

Bitmain's next-generation Antspace, roughly double the HW5's capacity. A megawatt-class hydro mining hall delivered as a single integrated unit.

Single-Digit Cooling Overhead

Closed-loop hydro rejects heat through liquid, not fans. The low-single-digit cooling overhead hydro is known for, against 10 to 25 percent lost to air cooling.

One Manufacturer, One System

Bitmain's container engineered around Bitmain's S21 Hydro miners. Coolant loop, power, and warranty aligned across the whole deployment, not split across vendors.

FAQ

Frequently Asked Questions

It is Bitmain's next-generation 40-foot hydro-cooling container, rated at 2MW of cooling capacity, designed to house and cool the Antminer S21 Hydro series at facility scale. It arrives as a complete two-piece system, the mining container and an integrated cooling tower, effectively a megawatt-class mining hall delivered as one unit rather than built on-site.

Capacity is the headline. The HW5 is a 40-foot container rated at 1.2MW; the HW7 is the next-generation successor rated at 2MW, roughly doubling the cooling envelope and the miner population a single container footprint supports. For operators whose constraint is megawatts per footprint, that is the reason to choose it over the prior generation.

The Antminer Hydro series, the S21 Hyd, S21 XP Hyd, and S21e XP Hyd, the current hydro-cooled lineup it is engineered around, with the broader S19/S23 Hydro family generally compatible. Because these are SHA-256 machines, the container is a Bitcoin mining deployment. The exact validated miner list for the HW7 is confirmed against Bitmain's specification for your build.

The population scales with the 2MW cooling envelope and the power draw of the specific model you deploy: a higher-wattage miner means fewer units per container, a lower-wattage one means more. Against roughly double the HW5's capacity, the HW7 holds materially more than the HW5's 210 units, and MillionMiner confirms the exact count for your chosen miner as part of the configuration.

Cooling overhead. Air-cooled containers spend ten to twenty-five percent of their total power moving air with fans; closed-loop hydro moves heat through liquid and drops that overhead to the low single-digit percent. On a 2MW site, that is hundreds of kilowatts redirected from cooling waste to hashrate, continuously, which over the life of a deployment is a direct and substantial effect on yield.

Integration and accountability. The coolant loop is matched to the miners' hydro plates, the power distribution is sized to their draw, and the whole system is validated together rather than assembled from a third-party container and separately sourced miners. If something fails, warranty and support sit with one manufacturer instead of two vendors assigning blame to each other. At megawatt-scale capital outlay, that single-vendor accountability is real risk reduction.

The Antspace ships as a stackable two-piece system: the mining container and an industrial cooling tower that handles coolant circulation and heat rejection. The Antspace family offers tower options matched to climate, from dry-wet towers for hot regions to dry towers for cold ones and heat-exchanger options for heat reuse. The specific tower configurations available for the HW7, and the right one for your site's climate, are confirmed with your order.

The Antspace design is modular by intent: operators add containers as power and site capacity allow, each a self-contained 2MW block. This lets a farm grow in defined megawatt increments with predictable infrastructure per step, rather than committing to one monolithic build, and MillionMiner plans multi-container deployments and their shared electrical and site requirements.

The HK3 is the 20-foot, roughly 1MW, 210-unit container; the HW7 is the 40-foot, 2MW, next-generation unit. The HK3 suits sites scaling in smaller increments or with tighter footprints; the HW7 is the choice when the goal is maximum cooling and miner density per container and per deployment. MillionMiner carries both and matches the container to your site and growth plan.

Substantially. Air-cooled containers run banks of high-speed fans that generate significant noise; hydro circulates liquid and minimizes fan reliance, so a hydro container runs far quieter. For deployments near noise-sensitive boundaries or under acoustic regulation, that difference can be the factor that makes a site viable.