No products found for ""
Request Your Tailored Hydro Rack Quote
Tell us your application and where you need delivery. Our customer service is available 24 hours a day by email, WhatsApp or phone.
Why we prepare a tailored quote
We put your hydro rack together for your application and ship it as freight. The price depends on configuration, quantity, delivery destination and your site. Send us the form, and our expert team prepares a tailored quote, delivered duties paid (DDP) to your site.
Thanks! Our specialist will reply within 24 hours with your custom quote.
How we put your hydro rack together
Hydro cooling cabinet that runs six Antminer Hydro miners on one coolant loop: S19 XP+, S21 XP, S21+, S21e or S23 Hydro, up to 35 kW of heat. A separate 50 kW dry cooler stands outside and carries the heat away, so fan noise stays out of the room.
It runs on 380 to 415 V three-phase, the same supply your hydro miners need. The 0.55 kW pump moves 2 cubic meters of coolant an hour. The cabinet measures 800 x 800 x 1,450 mm at 149 kg, the dry cooler 1,100 x 1,100 x 1,400 mm at 170 kg. We ship DDP with duties paid, with 12 months manufacturer warranty and setup help until your miners hash. Prefer hosting? Try our data centers free for 24 hours.
Your order ships as two parts: the cabinet that holds the miners and the dry cooler that carries their heat outside. Together they cool six Antminer Hydro miners at up to 35 kW, ready to connect to a 380 to 415 V three-phase line.
| Manufacturer | MillionMiner |
|---|---|
| Model | Hydro Cabinet 6 |
| Power consumption | 550 W |
| Release year | 2024 |
| Cooling | Hydro |
| Input voltage | 380-415V 3-phase 50/60Hz |
| Dimensions | 800 x 800 x 1450mm |
| Weight | 149 kg |
| Operating temperature | -25 - 45°C |
The cabinet holds six shelf-type Antminer Hydro miners and removes up to 35 kW of heat. Five models fit:
• S23 Hydro: six units at 5,510 W draw about 33.1 kW, inside the 35 kW limit.
• S21 XP Hydro: six units at 5,676 W draw about 34.1 kW, inside the limit with 0.9 kW to spare.
• S21+ Hydro, S21e Hydro and S19 XP+ Hydro: listed as compatible by the manufacturer.
• Not compatible: 3U rack versions such as the S21e XP Hyd 3U, and Whatsminer hydro units. They need a rack cabinet.
Mixing models works the same way: add up the power of all six miners and keep the total under 35 kW. The miners and the cabinet both run on 380 to 415 V three-phase, so one supply feeds the whole setup.
Every unit is new, factory sealed and comes with the manufacturer warranty. If a warranty case comes up, write to us: we handle it with MillionMiner for you.
Every unit is tested before it ships. Ask us on WhatsApp and we send you the test of your unit.
Request the test on WhatsAppWe ship DDP (Delivered Duty Paid) to 50+ countries: customs and import taxes are included in the price, the parcel is insured and tracked. In-stock units ship within 1–3 business days.
Power:
The cabinet, its pump and the miners all run on 380 to 415 V three-phase at 50 or 60 hertz. Six S23 Hydro plus the 0.55 kW pump draw about 33.6 kW, roughly 49 A per phase at 400 V. Your electrician sizes the breaker and cable to that load. Sites in North America with 208 or 480 V need a transformer to step to 400 V.
Over a month, six S23 Hydro use about 24,100 kilowatt hours and the pump adds about 400. What that costs depends on your own rate per kilowatt hour.
Installation in six steps:
The main advantages:
Maintenance:
We can run your hydro miners in our data centers on industrial power, monitored around the clock, at a fraction of your own power cost. The first 24 hours of hosting are free and without obligation.
Planning several units or need advice?
Leave your details: we answer your questions and get back to you within 24 hours with a personal offer, including volume pricing, delivery batch or hosting.
Your reviewMillionMiner Hydro Cabinet 6
Yes. We ship DDP with duties paid, so the price in the buy box is the final landed price for the cabinet and the 50 kW dry cooler.
Yes. A 50 kW dry cooler ships as a separate outdoor unit, 1,100 x 1,100 x 1,400 mm and 170 kg, 15 kW above the cabinet's 35 kW limit.
Yes, as long as the six miners stay under 35 kW in total. Three S23 Hydro at 5,510 W and three S21 XP Hydro at 5,676 W come to about 33.6 kW.
35 kW in the cabinet and 50 kW at the dry cooler. Six S23 Hydro make about 33.1 kW of heat, six S21 XP Hydro about 34.1 kW.
No. It needs 380 to 415 V three-phase at 50 or 60 hertz, the same supply as the hydro miners. In North America, a transformer steps 208 or 480 V to 400 V.
Yes. It is rated for minus 25 to 45 °C outside air. Below 0 °C, mix antifreeze and a corrosion inhibitor into the coolant.
0.55 kW for the circulation pump, about 400 kilowatt hours a month in continuous operation. The 2,900 r/min pump moves 2 cubic meters of coolant per hour.
0.64 square meters for the 800 x 800 mm cabinet indoors, plus 1.21 square meters for the dry cooler outside. Plan a door at least 85 cm wide for the 149 kg cabinet.
12 months manufacturer warranty. In a warranty case, we handle the process with the manufacturer for you.
No customs and no extra costs. We ship DDP with duties paid, the delivery window of each batch stands in the buy box, and you get a tracking number for your hydro miner setup.