Stoc epuizat

MicroBT

MicroBT Whatsminer M73 470TH

Model: Whatsminer M73

Nou

470 TH/s hydro cooled SHA-256 Bitcoin miner at 7,200W and 15.32 J/TH efficiency, the base bin of MicroBT's M73 rack mount hydro tier in the M70 generation. Manufacturer headline spec runs 14.5 J/TH across the broader 470 to 500 TH/s binning range per Apexto and Zeus Mining. Lowest per unit acquisition cost in the M73 lineup. Positioned below the mid bin M73S (500 to 540 TH/s at 13.5 J/TH) and top bin M73S+ (540 to 600 TH/s at 12.5 J/TH) across an identical 4U rack mount chassis and water cooling architecture. 10 M73 units per 42U rack produce 4.7 PH/s at 72 kW. Same 483 x 663 x 86 mm chassis at 29.5 kg. 380 to 480V three phase industrial power. Ships with PSU, 360 day MicroBT warranty, and free DDP worldwide from MillionMiner.

470 TH/s 7200W SHA-256 15.32 J/TH

Temporarily Unavailable

This product is temporarily unavailable.

Notify Me

Be the first to know when this miner becomes available.

Get a Quote

Interested in this miner? Contact us for availability and pricing.

Get a Quote

Autentic

Hardware testat

La nivel mondial

Transport global

Suport

Experți în minerit

Putere de calcul

470 TH/s

Putere

7200 W

Eficiență

15.32 J/TH

Zgomot

75 dB

Estimări ale câștigurilor din minerit

Bazat pe prețul actual al BTC și dificultatea rețelei. Doar orientativ.

Perioadă Zilnic Săptămânal Lunar
Venit
$44.70 $312.90 $1,341.00
Electricitate
-$13.82 -$96.74 -$414.60
Profit
$30.87 $216.09 $926.10

Utilizând 0.080 $/kWh · dificultatea rețelei la data de astăzi. Doar estimări.

Adjust rate in the bar above

Updated daily. Last refresh: May 10, 2026. Estimates at $0.08/kWh.

Specificații complete

Putere de calcul 470 TH/s
Consumul de energie 7200 W
Eficiență 15.32 J/TH
Algoritm SHA-256
Model Whatsminer M73
Anul lansării Dec 2025
Nivel de zgomot 75 dB
Dimensiuni 483 x 663 x 86mm
Greutate 29.5 kg
Tensiune AC 380-480V
Interfețe Ethernet
Temperatură de funcționare 5 - 45 °C
Umiditate 5 - 95 %
Tip de răcire Hydro
Format rack 4U

Ce se află în cutie

Whatsminer M73
Unitate de alimentare (PSU)
Cabluri de alimentare
Ghid de început rapid

Conținutul poate varia în funcție de lot. Articolele exacte sunt listate în confirmarea comenzii.

Configurare rapidă

1

Connect PSU to miner and plug into the outlet

2

Conectați cablul Ethernet la routerul sau switch-ul dvs.

3

Găsiți IP-ul minerului prin administratorul routerului sau instrumentul de scanare IP

4

Deschide interfața web, introdu adresa pool-ului și portofelul — începe mineritul

Hydro-cooled miners require 380-415V three-phase power and a hydro cooling loop. Standard household outlets are not compatible. Contact our team for hosting options or setup guidance.

Detalii despre produs

MicroBT Whatsminer M73 470 TH/s Hydro Cooled 4U Rack Mount Bitcoin Miner: Base Bin Economics, Specifications, and Deployment Guide

The Whatsminer M73 is the base bin entry of MicroBT's M73 rack mount hydro tier in the M70 generation, positioned below the M73S mid bin (500 to 540 TH/s at 13.5 J/TH) and M73S+ top bin (540 to 600 TH/s at 12.5 J/TH). MillionMiner rated spec: 470 TH/s and 15.32 J/TH. Manufacturer headline per Apexto, Zeus Mining, and X ON Mining documents the broader binning range at 470 to 500 TH/s and 14.5 J/TH efficiency across the platform. Base bin exists to serve volume buyers whose binding constraint is hardware budget rather than operating efficiency. When a facility has fixed capital allocation for hardware and the goal is to fill available rack capacity with maximum unit count, the M73 at the lowest per unit acquisition cost fits more machines in the rack than either higher bin. Whether this strategy wins total fleet economics depends on the arithmetic between acquisition cost savings and lifetime efficiency penalty. The efficiency comparison is quantifiable. M73 at 15.32 J/TH versus M73S+ at 13.33 J/TH (or manufacturer headline 12.5 J/TH). At $0.04 per kWh industrial rates, the per unit daily electricity difference runs roughly $0.30. At $0.08 per kWh: approximately $0.55 daily per unit. Across a 10 unit rack, those differences compound to $3 to $5.50 daily. Over a 3 year deployment horizon at $0.06 per kWh, accumulated efficiency gap totals approximately $5,500 per rack between M73 and M73S+. Whether this justifies the top bin acquisition premium depends on the specific price differential at your supplier. Base bin chips also run at lower clock frequencies than top grade, which reduces per chip thermal stress over extended operational life. Some fleet operators deliberately choose base bin specifically for multi year deployments where longevity trumps peak efficiency. All M73 variants use physically identical silicon from the same production run, so structural differences are nonexistent. Only the tested performance grade differs. The M73 series rack mount hydro approach avoids immersion tank infrastructure while capturing liquid cooling advantages. Water flows through internal channels in a sealed 4U rack mount chassis and carries heat to an external cooling loop. Units install in standard 19 inch server racks alongside any other data center equipment. Closed loop water cooling uses off the shelf pumps, standard plumbing fittings, and water glycol coolant. Compared to air cooled Bitcoin miners at similar hashrate class, the M73 delivers lower noise, higher sustained output under load, and typically longer component life because chips operate at consistent temperatures. Rack density works out to 10 M73 units per 42U rack (factoring cooling manifold space and cable management) producing 4.7 PH/s at 72 kW per rack. Same rack power as M73S+ (5.4 PH/s) and M73S (5 PH/s). Mix bins within racks based on acquisition cost optimization. Power infrastructure: 380 to 480V three phase commercial or industrial service. At 415V three phase the M73 draws approximately 17 amps per phase. At 480V: approximately 15 amps per phase. Fits within standard 20 amp commercial breakers. Same three phase requirements as the entire M73 series. Bitcoin mining economics at 470 TH/s: MillionMiner's $0.08 per kWh onsite calculator shows $15.32 daily revenue, $13.82 electricity, $1.50 net profit per day. Tight margins at standard rates. At $0.04 per kWh industrial rates: $6.91 daily electricity, netting $8 to $9 daily profit per unit. A 10 unit M73 rack produces $80 to $90 daily net profit at $0.04 per kWh. Economic viability requires industrial electricity below $0.05 per kWh. 483 x 663 x 86 mm at 29.5 kg. Ethernet 10/100M management through standard Whatsminer firmware. 5 to 45 degrees Celsius operating range at 5 to 95 percent humidity. PSU ships included. 360 day MicroBT manufacturer warranty. Free DDP delivery worldwide from MillionMiner.

MicroBT Whatsminer M73 470 TH/s: Base Bin Entry to the M73 Rack Mount

The M73 is the volume fleet pick in MicroBT's M73 rack mount hydro tier.
Same 7,200W power draw as the M73S and M73S+, same 4U rack mount chassis, same water
cooling architecture, same 380 to 480V three phase requirements. Chip binning grade and
correspondingly lower per unit acquisition cost differentiate the variants.
MillionMiner rated spec: 470 TH/s at 15.32 J/TH. Manufacturer headline per Apexto and Zeus
Mining: 470 to 500 TH/s across the binning range at 14.5 J/TH efficiency. Base bin exists for
operators whose binding constraint is hardware budget rather than operating efficiency. A 10
unit M73 rack produces 4.7 PH/s at 72 kW versus 5.4 PH/s from an equivalent M73S+ rack, at
meaningfully lower acquisition cost per unit.
Base bin silicon also runs at lower clock frequencies than top grade, which reduces per chip
thermal stress over extended operational life. Some fleet operators deliberately choose base bin
for multi year deployments where longevity matters alongside peak efficiency. Combined with
lower acquisition cost, this makes the M73 a defensible fleet strategy rather than just a budget
compromise.
Rack mount hydro approach avoids immersion tank infrastructure while capturing liquid cooling
advantages: lower noise than air cooled equivalents, higher sustained hashrate, longer
component life. Standard 19 inch server racks, off the shelf pumps, water glycol coolant.

Ai nevoie de ajutor în alegere?

Specialiștii noștri în minerit vă pot ajuta să găsiți minerul perfect pentru configurația și bugetul dumneavoastră.

Whatsminer M73 470 TH/s Hydro 4U Bitcoin Miner

Base bin entry to MicroBT's M73 rack mount hydro tier. MillionMiner rated
spec: 470 TH/s at 7,200W and 15.32 J/TH. Manufacturer headline at 14.5 J/TH across the 470
to 500 TH/s binning range per Apexto and Zeus Mining. Lowest per unit acquisition cost in the
M73 lineup for volume fleet buyers whose binding constraint is hardware budget rather than
operating efficiency. 10 units per 42U rack produce 4.7 PH/s at 72 kW. Base bin chips run at
lower frequencies than top grade, potentially extending component life over multi year
deployments. Same 4U chassis, water cooling architecture, and 380 to 480V three phase
requirements as the M73S and M73S+. 483 x 663 x 86 mm at 29.5 kg. Water glycol closed loop
cooling in standard 19 inch server racks.

470 TH/s Volume Fleet Hydro Entry

Base bin of the M73 rack mount hydro tier at lowest per unit acquisition cost. Maximum units per hardware budget.

Same Chassis and Silicon as Higher Bins

Identical 4U chassis, water cooling, and production silicon as M73S and M73S+. Only testing grade differs. Mix bins freely within racks.

Frecvențe mai joase, potențial durată de viață mai lungă

Base grade chips run at lower clock speeds, reducing per chip thermal stress. Defensible choice for multi year deployments prioritizing longevity.

Request a Bitcoin Miner Hosting Quote

4.7
stea stea stea stea stea

4.7/5 Verified on Trustpilot

  • plic 30,000+ miners hosted since 2020
  • cronometru Trusted by 1,200+ customers globally
ISO fabricat în Germania trustpilot
recenzie-google

Need a Hosting Offer?

Tell us what you need and our team will send you a customized ASIC miner hosting quote

muncitor în mină

Miner

gazduire

Găzduire

Întrebări frecvente

Întrebări frecvent puse

The M73 produces 470 TH/s of SHA-256 hashrate at 7,200W and 15.32 J/TH efficiency in the MillionMiner rated specification. Manufacturer headline specs per Apexto, Zeus Mining, and X ON Mining document the broader binning range at 470 to 500 TH/s and 14.5 J/TH efficiency. MicroBT rates the unit at plus or minus 3 percent hashrate tolerance. Real world output depends on batch binning, coolant temperature, and operating conditions.

Same 7,200W rated power draw across all three variants. Same 4U chassis, water cooling architecture, and 380 to 480V three phase requirements. Hashrate and efficiency differences come from chip binning. M73 base (this product): 470 to 500 TH/s at 14.5 J/TH. M73S mid: 500 to 540 TH/s at 13.5 J/TH. M73S+ top: 540 to 600 TH/s at 12.5 J/TH. The M73 trades 13 percent hashrate versus the M73S+ for correspondingly lower acquisition cost. For operators whose binding constraint is hardware budget rather than operating efficiency, the M73 puts more units in the rack per dollar of capital spent.

Trei scenarii favorizează M73. Prima: bugetul pentru hardware reprezintă constrângerea principală, mai degrabă decât costul electricității, ceea ce este comun în fazele incipiente ale construcției de facilități. A doua: orizontul de implementare este suficient de scurt (mai puțin de 2 ani), încât economiile la costul de achiziție depășesc penalizarea pentru eficiența pe întreaga durată de viață. A treia: tariful la electricitate este suficient de ieftin (sub 0,04 $ pe kWh) încât diferența zilnică de eficiență între containere este mică în termeni absoluți de dolari. Dacă niciuna dintre aceste condiții nu se aplică, opțiunile cu containere superioare, de obicei, câștigă din punct de vedere economic în total pe durata de viață a flotei.

No. Base bin chips are not inferior manufacturing. They come from the same silicon wafers, same production line, and same chip design as top bin. Only tested performance grade differs during post fabrication quality sorting. Base bin chips may actually last longer than top bin under extended deployment because lower clock frequencies reduce thermal stress per chip. For multi year deployments where hardware longevity matters alongside acquisition cost, some fleet operators deliberately choose base bin silicon.

380 to 480V three phase commercial or industrial power. At 415V three phase: approximately 17 amps per phase at 7,200W continuous draw. At 480V three phase: approximately 15 amps per phase. Fits within standard 20 amp commercial breakers with headroom. Same three phase requirements as the entire M73 series.

Closed loop water circulation with off the shelf components. Required: circulation pumps sized for total fleet flow rate, standard plumbing fittings, water glycol coolant mixture, external heat rejection through dry coolers or water to water heat exchangers, and inline filtration. Coolant volume scales roughly 2 to 4 liters per unit plus system reservoir capacity. Each M73 adds approximately 24,570 BTU per hour of thermal load. Uses standard data center cooling equipment from any industrial supplier.

A standard 42U rack holds 10 M73 units producing 4.7 PH/s at 72 kW per rack. The M73S rack produces 5 PH/s at the same 72 kW. The M73S+ rack produces 5.4 PH/s. Mix bins within racks based on acquisition cost optimization. Compare against immersion alternatives or air cooled options before committing to facility architecture.

At MillionMiner's $0.08 per kWh onsite calculator: $15.32 daily revenue, $13.82 electricity, $1.50 net profit per day. Margins are tight at standard rates. At $0.07 per kWh industrial rates: approximately $12.10 daily electricity against similar revenue. At $0.04 per kWh negotiated industrial rates: $6.91 daily electricity, netting $8 to $9 daily profit per unit. A 10 unit M73 rack produces $80 to $90 daily net profit at $0.04 per kWh. Economic viability requires industrial electricity below $0.05 per kWh.

Any SHA-256 proof of work cryptocurrency. Bitcoin (BTC) is the primary target. Other compatible coins include Bitcoin Cash (BCH), Bitcoin SV (BSV), Fractal Bitcoin (FB), and DigiByte (DGB SHA-256 chain). Merged mining BTC alongside BCH and BSV through supporting pools like ViaBTC and F2Pool adds marginal secondary revenue without reducing Bitcoin hashrate contribution.

Run the acquisition cost versus daily electricity savings math with your specific supplier pricing. Model the per unit price gap between bins against daily efficiency savings at your electricity rate across your expected deployment horizon. If the per unit price gap between M73 and M73S+ is less than $600 at your supplier, upgrading to top bin typically wins at $0.06 per kWh industrial rates over 3 year deployments. At smaller price gaps, higher bins always win. At larger gaps, the M73 strengthens. Alternatively, mix bins within the same rack: majority M73 for capital efficiency, some M73S+ units where efficiency matters most.

Yes. All three M73 variants share identical 4U chassis, water cooling connector design, power requirements, and Whatsminer firmware. Mix bins freely within racks based on fleet deployment strategy. Common pattern: majority M73 units for capital efficiency with some higher bin units in specific slots. Fleet management handles mixed bin deployments transparently through unified Whatsminer firmware dashboards.

Implementare industrială cu infrastructură de alimentare trifazică și răcire cu apă. Pasul unu: instalați serviciu electric trifazic de 380 până la 480V. Pasul doi: instalați și puneți în funcțiune circuitul de răcire cu apă, inclusiv pompe, instalații sanitare și răcire uscată. Pasul trei: montați unitățile M73 în rack-uri standard de 19 inch și conectați racordurile de intrare/ieșire apă. Verificați lipsa scurgerilor înainte de inițierea alimentării. Pasul patru: conectați alimentarea PSU și managementul Ethernet. Pasul cinci: porniți, permiteți fluxul de răcire să se stabilizeze, găsiți IP-ul fiecărui miner prin DHCP, configurați URL-ul pool-ului și portofelul Bitcoin prin interfața web Whatsminer, verificați ca hashratul să atingă 456+ TH/s în 15 până la 20 de minute per unitate.

Water cooling maintenance. Weekly visual inspection of fittings for leaks or corrosion. Monthly coolant quality testing. Every 12 to 24 months full coolant replacement. Quarterly pump and dry cooler inspection. Inline filter replacement when pressure differential exceeds specification. Hashboard failure rates on hydro units run lower than air cooled because chips operate at consistent temperatures. Water cooling maintenance is simpler than immersion fluid management because water glycol is cheaper and more widely available than dielectric fluid.

Any Stratum compatible Bitcoin pool. Foundry USA leads by network share. F2Pool has the longest operational track record and supports merged mining. AntPool remains popular across MicroBT fleets. ViaBTC offers accumulation mode payouts. For fleet deployments above 4.7 PH/s (equivalent to 10+ M73 units), direct negotiated agreements with major pools typically secure reduced fees below standard rates.

No. The M73 requires 380 to 480V three phase industrial power unavailable in residential settings, water cooling loop infrastructure, and professional installation for both electrical service and plumbing. Home mining hardware caps at around 3,500W per unit on standard 240V 20A circuits. For high hashrate home deployment, the Antminer S21 XP at 270 TH/s represents the realistic ceiling.

MicroBT's 360 day factory warranty on the complete machine covers manufacturing defects and hardware failures under normal operation within specified environmental ranges. Warranty exclusions include damage from coolant quality neglect, leaks caused by improper fitting installation, physical damage during cooling loop maintenance, power surge damage, and operation outside the 5 to 45 degree Celsius range. Warranty coverage is identical across all M73 bin variants.

Yes. MillionMiner operates managed hosting facilities with three phase industrial power and water cooling infrastructure capable of supporting M73 deployments. Hosted deployment eliminates facility infrastructure CapEx. Professional hosting at negotiated industrial rates often beats self hosting when full infrastructure costs are included. Contact MillionMiner sales through the Get a Quote button for hosting pricing, capacity availability, and deployment timelines.

Generally no, and potentially positively. Base bin chips run at lower clock frequencies than top bin silicon, which reduces per chip thermal stress over extended operational life. Some fleet operators deliberately choose base bin for multi year deployments where hardware longevity matters alongside peak efficiency. Counterargument: all M73 variants use identical silicon from the same production run, so base hardware durability differences are typically marginal in practice. Reliability differences between bins are small compared to differences between cooling approaches (hydro versus immersion versus air).

Adăugiri CapEx dincolo de achiziția minelor: instalarea serviciului electric trifazat ($5.000 până la $20.000 pe facilitate), bucla de răcire cu apă și pompe ($5.000 până la $20.000 pe rack), rack-uri și cablare ($1.500 până la $4.000 pe rack). OpEx anual pe unitate la 7,2 kW: electricitate la $5.045 la tarif de $0,08 pe kWh, $2.522 la tarif industrial de $0,04 pe kWh, întreținerea sistemului de răcire cu glicol de apă ($100 până la $300 pe unitate anual), piese de schimb. Infrastructura de răcire cu apă pentru CapEx are costuri semnificativ mai mici decât sistemele cu tancuri de imersie.

Within the M73 rack mount hydro tier: the Whatsminer M73S at 500 to 540 TH/s is the mid bin upgrade path, and M73S+ at 540 to 600 TH/s is the top bin option for operators prioritizing efficiency. Cross cooling at MicroBT: immersion variants M76 and M78 series cover alternative liquid cooling for facilities with tank infrastructure, M79 and M79S cover high power hydro tier. Cross brand hydro: the Bitmain Antminer S23 Hyd 3U at 1.16 PH/s provides vendor diversification at higher power tier. For algorithm diversification, the Antminer KS7 at 45 TH/s covers Kaspa mining. MillionMiner's ASIC hosting service accepts M73 units at negotiated industrial electricity rates.

Get a Quote